State: Odisha District: Jagatsinghpur Block: Tirtol Gram Panchayat: Patilo
Work Code: OD/355/3393/118229/397729/00077088 (Construction of Facility Centre at GP office, Patilo)
Project Category: Building
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Tirtol Proposal Date: -
Date of Commencement: 02-02-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Provision of Facilities at GP Head Quarter
Project Sub-Category: GP Facility Centre Project Type: New Work
Name of Executant: PARTHA SARATHI DASH
Administrative Approval Details
Approval No.: OD/355/3393/118229/397729/00077088/AS
Technical Sanction Details
Technical Sanction No.: OD/355/3393/118229/397729/00077088/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM005 BRMMR0025 BRM060 BRM052 BRM104 BRM092 BRM084 BRM094 BRM174 BRM131 BRM142 BRM255 BRM252 BRM162 BRM341 BRM129
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 40.743 Cum 1 40.743 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 9.281 Cum - - 2.29 21.25349 0.48 4.45488 0.96 8.90976 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Earth Work (AR0101a) :.Earthwork in ordinary soil within 50m, initial lead and 1.5m, initial lift - Earth work in ordinary soil within 50m, initial lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 23.364 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 7.95 Cum - - 0.672 5.3424 0.28 2.226 - - 350 2782.5 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 19.95125 Cum - - 0.672 13.40724 0.28 5.58635 - - 350 6982.9375 1 19.95125 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 5.3325 Cum - - 3.4733 18.52137225 0.45 2.399625 - - - - - - 0.36 1.9197 0.54 2.87955 0.004005 0.0213566625 0.189 1.0078425 - - - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) 3.046875 Cum - - 3.4733 10.5827109375 0.45 1.37109375 - - - - - - 0.36 1.096875 0.54 1.6453125 0.01335 0.04067578125 0.63 1.91953125 - - - - - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 5.465 Cum - - 3.4733 18.9815845 0.45 2.45925 - - - - - - 0.36 1.9674 0.54 2.9511 0.041529 0.226955985 - - 4.4196 24.153114 - - - - - - - - - - - - - - - - - -
9 R.C.C. Work (AR0404Ad) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 1.21875 Cum - - 3.4733 4.233084375 0.45 0.5484375 - - - - - - 0.36 0.43875 0.54 0.658125 0.0741335 0.090350203125 - - - - 3.7695 4.594078125 - - - - - - - - - - - - - - - -
10 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 8.41455 Cum - - 3.4733 29.226256515 0.45 3.7865475 - - - - - - 0.36 3.029238 0.54 4.543857 0.0502172 0.42255514026 - - 6.2216 52.35196428 - - - - - - - - - - - - - - - - - -
11 Other Building Items. (AR1901B) :.Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 61.06 Sqm - - 0.1074 6.557844 0.021 1.28226 - - - - - - - - - - - - - - - - - - 0.0076 0.464056 1 61.06 - - - - - - - - - - - -
12 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 153.94 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.25 38.485 - - - - - - - - - -
13 Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 122.73 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 15.34125 0.084 10.30932 - - - - - -
14 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 19.1 Qntl - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.8 15.28 1.05 20.055 - -
15 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 122.73 Sqm - - 0.0358 4.393734 0.015 1.84095 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
16 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 92.88 Sqm - - 0.043 3.99384 0.018 1.67184 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
17 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 3.4 Qntl - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 3.4 - -
18 Flooring (AR0817b) :.Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. 48.3 Sqm - - 0.1375 6.64125 0.015 0.7245 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 48.3
Total Qty 40.743 143.1348065775 28.35173375 8.90976 9765.4375 19.95125 8.451963 12.6779445 0.801893772135 2.92737375 76.50507828 4.594078125 0.464056 61.06 38.485 15.34125 10.30932 15.28 23.455 48.3
Rate Per Unit 534.51 609.822 543.02 2501.16 6.1539 33 2924.58 2888.2 58620.646 276.666 297.726 287.666 2047.912 662.3175001 70.40732 195.09732 125.80732 90.1 6216.322 416.4375001
Total Amount 21777.54093 87286.754016704 15395.558460925 22284.7353216 60095.52583125 658.39125 24718.44195054 36616.4393049 47007.53094593 809.9047859175 22777.550935991 1321.5600779062 950.345851072 40441.106556106 2709.6257102 2993.03676045 1296.9879202224 1376.728 145803.83251 20113.93125483
Total Material Amount (in Rs.): 556435.52837455