State: Odisha District: Ganjam Block: Chikiti Gram Panchayat: Nuapada
Work Code: OD/354/3370/117700/413007/00013114 (Improvement/Completion of Incomplete Kalyan Mandap at Charipada)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Chikiti Proposal Date: -
Date of Commencement: 29-10-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Kalyan Mandap Project Type: Repair and Maintenance
Name of Executant: SUCHISMITA MISHRA
Administrative Approval Details
Approval No.: OD/354/3370/117700/413007/00013114/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3370/117700/413007/00013114/TS
Fund Sanction No.: 12762
Fund Sanction Amount (in Rs.): 100000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM253 BRM255 BRM252 BRM140
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 458.864 Sqm 0.084 38.544576 - - - - - -
2 Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 125.04 Sqm - - 0.125 15.63 0.084 10.50336 - -
3 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 296.024 Sqm - - - - - - 0.125 37.003
Total Qty 38.544576 15.63 10.50336 37.003
Rate Per Unit 0 0 0 0
Total Amount 0 0 0 0
Total Royalty Amount (in Rs.): 0