State: Odisha District: Bargarh Block: Bargarh Gram Panchayat: Tumgaon
Work Code: OD/347/3312/116394/380651/00013513 (IMP. OF ROAD FROM HANUMAN MANDIR TO NUAKATA,TURUNGA)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Bargarh Proposal Date: 15-05-2023
Date of Commencement: 17-12-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance and improvement of Road infrastructure
Project Sub-Category: CC Road Project Type: Upgradation or Improvement
Name of Executant: SAHEB PRADHAN
Administrative Approval Details
Approval No.: OD/347/3312/116394/380651/00013513/AS
Technical Sanction Details
Technical Sanction No.: OD/347/3312/116394/380651/00013513/TS
Fund Sanction No.: 12942
Fund Sanction Amount (in Rs.): 250000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 13 Cum 1 13 - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.109600067139 Cum - - 2.29 36.890984153748 0.48 7.7326080322266 0.96 15.465216064453 - - - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 58.240001678467 Sqm - - - - - - - - 0.00267 0.15550080448151 0.000614 0.035759361030579 - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 13 Cum - - 3.23 41.99 0.45 5.85 - - - - - - 0.9 11.7
5 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 5.5015997886658 Cum - - - - - - - - - - - - - -
Total Qty 13 78.880984153748 13.582608032227 15.465216064453 0.15550080448151 0.035759361030579 11.7
Rate Per Unit 165.25 0 165.25 249.5 0 0 249.5
Total Amount 2148.25 0 2244.5259773254 3858.5714080811 0 0 2919.15
Total Royalty Amount (in Rs.): 11170.497385406