| State: Odisha |
District: Kalahandi |
Block: Bhawanipatna |
Gram Panchayat: Seinpur |
Work Code: OD/358/3409/118623/423612/00013568 (Repair and Maintenance of kacharpadar Primary School , Seinpur)
Project Category: Building
| Financial Year: 2023-24 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Bhawanipatna |
Proposal Date: 16-02-2024 |
| Date of Commencement: 26-11-2025 |
Date of Completion: 04-02-2026 |
| Scheme Name: 5th SFC Grant in Aid |
Scheme Component Name: Maintenance of Primary School Building |
| Project Sub-Category: Elementary School |
Project Type: Upgradation or Improvement |
| Name of Executant: Birendra Kumar Meher |
|
Administrative Approval Details
Approval No.: OD/358/3409/118623/423612/00013568/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3409/118623/423612/00013568/TS
Fund Sanction No.: 11045
Fund Sanction Amount (in Rs.): 200000
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM131 |
BRM340 |
BRM028 |
BRM253 |
BRM255 |
BRM141 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. |
79.94 |
Sqm |
1 |
79.94 |
0.1375 |
10.99175 |
0.015 |
1.1991 |
- |
- |
- |
- |
- |
- |
| 2 |
Other Building Items. (AR1902) :.cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. |
288.74 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. |
288.74 |
Sqm |
- |
- |
- |
- |
- |
- |
0.084 |
24.25416 |
- |
- |
- |
- |
| 4 |
Painting(AR0918Ai) :.Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. |
421.04 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
0.075 |
31.578 |
- |
- |
| 5 |
Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) |
42.5025 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.125 |
5.3128125 |
| Total Qty |
79.94 |
10.99175 |
1.1991 |
24.25416 |
31.578 |
5.3128125 |
| Rate Per Unit |
0 |
0 |
75.25 |
0 |
0 |
0 |
| Total Amount |
0 |
0 |
90.232275 |
0 |
0 |
0 |
Total Royalty Amount (in Rs.): 90.232275