State: Odisha District: Balasore Block: Baleshwar Gram Panchayat: Dubula Gadi
Work Code: OD/346/3299/275531/392606/00014678 (Construction of CC Road from Rajkrushna Parida house to Asish Parida house.)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Baleshwar Proposal Date: 20-09-2024
Date of Commencement: 27-05-2025 Date of Completion: 22-07-2025
Scheme Name: SFC Devolution of Fund Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: MAMATA HANSDA
Administrative Approval Details
Approval No.: OD/346/3299/275531/392606/00014678/AS
Technical Sanction Details
Technical Sanction No.: OD/346/3299/275531/392606/00014678/TS
Fund Sanction No.: 0
Fund Sanction Amount (in Rs.): 151003
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM045 BRM056 BRM029 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0101a1) :.Earthwork in ordinary soil within 50m to 75m lead and 1.5m, initial lift - Earthwork in ordinary soil within 50m to 75m lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 1.63741896 Cum - - - - - - - - - - - - - -
2 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.479481344 Cum 2.29 23.99801227776 0.48 5.03015104512 0.96 10.06030209024 - - - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 7.204643424 Cum 3.23 23.27099825952 0.45 3.2420895408 - - 0.9 6.4841790816 - - - - - -
4 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 12.771867888 Cum - - - - - - - - 1 12.771867888 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 42.690414948 Sqm - - - - - - - - - - 0.00267 0.11398340791116 0.000614 0.026211914778072
Total Qty 47.26901053728 8.27224058592 10.06030209024 6.4841790816 12.771867888 0.11398340791116 0.026211914778072
Rate Per Unit 0 427.25 522.5 522.5 427.25 0 0
Total Amount 0 3534.3147903343 5256.5078421504 3387.983570136 5456.780555148 0 0
Total Royalty Amount (in Rs.): 17635.586757769