State: Odisha District: Angul Block: Athmallik Gram Panchayat: Katapada
Work Code: OD/344/3277/115587/405095/00017109 (Construction of Guard Wall at Gopinathpur Dhaurabani Sahi)
Project Category: Water Body
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Athmallik Proposal Date: -
Date of Commencement: 30-01-2026 Date of Completion: -
Scheme Name: SFC Devolution of Fund Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI
Project Sub-Category: Guard Wall or Retaining Wall or Protection Wall Project Type: New Work
Name of Executant: Raj Kishore Naik
Administrative Approval Details
Approval No.: OD/344/3277/115587/405095/00017109/AS
Technical Sanction Details
Technical Sanction No.: OD/344/3277/115587/405095/00017109/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 201919
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 29.5 Cum - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 4.5 Cum 1 4.5 - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 29.5 Cum - - 2.29 67.555 0.48 14.16 0.96 28.32 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 84 Sqm - - - - - - - - 0.00267 0.22428 0.000614 0.051576
Total Qty 4.5 67.555 14.16 28.32 0.22428 0.051576
Rate Per Unit 40.25 0 229.25 400.5 0 0
Total Amount 181.125 0 3246.18 11342.16 0 0
Total Royalty Amount (in Rs.): 14769.465