State: Odisha District: Nuapada Block: Nuapada Gram Panchayat: Parkod
Work Code: OD/368/3534/120849/421629/00017423 (Preservation and Development of Harihar Sagar Tank at Semeria)
Project Category: Water Body
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Nuapada Proposal Date: 08-09-2024
Date of Commencement: 03-06-2025 Date of Completion: 29-11-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Preservation and Development of Water Bodies
Project Sub-Category: Tank Project Type: New Work
Name of Executant: Balak Ram Majhi
Administrative Approval Details
Approval No.: OD/368/3534/120849/421629/00017423/AS
Technical Sanction Details
Technical Sanction No.: OD/368/3534/120849/421629/00017423/TS
Fund Sanction No.: 29120
Fund Sanction Amount (in Rs.): 663694
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM026 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102a) :.Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 29.88 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115a) :.Filling foundation and plinth with crusher dust well watered and rammed - Filling foundation and plinth with crusher dust well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 59.76 Cum 1 59.76 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 59.76 Cum - - 2.29 136.8504 0.48 28.6848 0.96 57.3696 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 44.82 Cum - - 3.23 144.7686 0.45 20.169 - - 0.9 40.338 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 66.4 Sqm - - - - - - - - - - 0.00267 0.177288 0.000614 0.0407696
Total Qty 59.76 281.619 48.8538 57.3696 40.338 0.177288 0.0407696
Rate Per Unit 40.25 0 40.25 149.5 149.5 0 0
Total Amount 2405.34 0 1966.36545 8576.7552 6030.531 0 0
Total Royalty Amount (in Rs.): 18978.99165