State: Odisha District: Khordha Block: Balipatna Gram Panchayat: Alisisasan
Work Code: OD/362/3457/275278/407671/00021169 (Provision Of Facility Centre At Alisisasan GP Hqrs)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Balipatna Proposal Date: -
Date of Commencement: 08-01-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Provision of Facilities at GP Head Quarter
Project Sub-Category: GP Facility Centre Project Type: New Work
Name of Executant: Sushree
Administrative Approval Details
Approval No.: OD/362/3457/275278/407671/00021169/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3457/275278/407671/00021169/TS
Fund Sanction No.: 15219
Fund Sanction Amount (in Rs.): 1000000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM060 BRM052 BRM104 BRM092 BRM084 BRM094 BRM005 BRM341 BRM131 BRM130 BRM129 BRM255 BRM253 BRM252 BRM140 BRM137 BRM141
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 25.559876352 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 28.796486592 Cum 1 28.796486592 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 9.72913145088 Cum - - 2.29 22.279711022515 0.48 4.6699830964224 0.96 9.3399661928448 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 5.1288804 Cum - - 3.4733 17.81414029332 0.45 2.30799618 - - 0.36 1.846396944 0.54 2.769595416 0.004005 0.020541166002 0.000921 0.0047236988484 - - - - - - - - - - - - - - - - - - - - - - - - - -
5 R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) 3.7404935376 Cum - - 3.4733 12.991856204146 0.45 1.68322209192 - - 0.36 1.346577673536 0.54 2.019866510304 0.01335 0.04993558872696 0.00307 0.011483315160432 - - - - - - - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 6.77360721816 Cum - - 3.4733 23.526769950835 0.45 3.048123248172 - - 0.36 2.4384985985376 0.54 3.6577478978064 0.041529 0.28130113416297 - - 0.045339 0.30710857766416 - - - - - - - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0404Ad) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 1.3355547928 Cum - - 3.4733 4.6387824618322 0.45 0.60099965676 - - 0.36 0.480799725408 0.54 0.721199588112 0.0741335 0.099009351232039 - - - - 0.049542 0.066166055544898 - - - - - - - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 8.35855868736 Cum - - 3.4733 29.031781888807 0.45 3.761351409312 - - 0.36 3.0090811274496 0.54 4.5136216911744 0.0502172 0.41974341331489 - - 0.076659 0.64075875041433 - - - - - - - - - - - - - - - - - - - - - - - -
9 R.C.C. Work (AR0404Af) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Sun sheds & Chajja) 5.17098098 Sqm - - 0.21708125 1.1225230148646 0.028125 0.1454338400625 - - 0.0225 0.11634707205 0.03375 0.174520608075 0.00552344 0.028561603184171 - - 0.0084318 0.043600677427164 - - - - - - - - - - - - - - - - - - - - - - - -
10 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 3.3140093423104 Cum - - 0.672 2.2270142780326 0.28 0.92792261584691 - - - - - - - - - - - - - - 350 1159.9032698086 - - - - - - - - - - - - - - - - - - - -
11 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 20.0574124096 Cum - - 0.672 13.478581139251 0.28 5.616075474688 - - - - - - - - - - - - - - 350 7020.09434336 - - - - - - - - - - - - - - - - - - - -
12 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 26 Qntl - - - - - - - - - - - - - - - - - - - - - - 1.05 27.3 - - - - - - - - - - - - - - - - - -
13 Plastering (AR1017) :.20mm thick cement Plaster in CM (1:4) over masonry work in inside. - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 65.29315743 Sqm - - 0.0744 4.857810912792 0.021 1.37115630603 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
14 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 94.44611883 Sqm - - 0.043 4.06118310969 0.018 1.70003013894 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
15 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 77.15779956 Sqm - - 0.0358 2.762249224248 0.015 1.1573669934 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
16 Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 67.5869325 Sqm - - 0.0372 2.514233889 0.0075 0.50690199375 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
17 Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 49.204680405 Sqm - - 0.1375 6.7656435556875 0.015 0.738070206075 - - - - - - - - - - - - - - - - - - 1 49.204680405 - - - - - - - - - - - - - - - -
18 Flooring (AR0816) :.Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 3.8859281034 Sqm - - 0.2737 1.0635785219006 0.013 0.0505170653442 - - - - - - - - - - - - - - - - - - - - 1 3.8859281034 - - - - - - - - - - - - - -
19 Flooring (AR0817b) :.Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. 34.89808292 Sqm - - 0.1375 4.7984864015 0.015 0.5234712438 - - - - - - - - - - - - - - - - - - - - - - 1 34.89808292 - - - - - - - - - - - -
20 Painting(AR0918cb) :.Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 78.42685454 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 9.8033568175 0.090322580645161 7.0837158939355 - - - - - - - -
21 Painting(AR0901c) :.Priming one coat with inner surface primer of approved quality oil-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality oil-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 67.77831268 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 5.69337826512 - - - - - -
22 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 121.24584724 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 15.155730905 - - - -
23 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 3.36 Qntl - - - - - - - - - - - - - - - - - - - - - - 1 3.36 - - - - - - - - - - - - - - - - - -
24 Painting(AR0903b) :.Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 20.159951 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.054 1.088637354 0.125 2.519993875
Total Qty 28.796486592 153.93434586842 28.808621560523 9.3399661928448 9.2377011409812 13.856551711472 0.89909225662303 0.016207014008832 0.99146800550565 0.066166055544898 8179.9976131686 30.66 49.204680405 3.8859281034 34.89808292 9.8033568175 7.0837158939355 5.69337826512 15.155730905 1.088637354 2.519993875
Rate Per Unit 118.25 0 118.25 158.5 158.5 158.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Amount 3405.184539504 0 3406.6194995318 1480.3846415659 1464.1756308455 2196.2634462683 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Royalty Amount (in Rs.): 11952.627757716