State: Odisha District: Sambalpur Block: Jamankira Gram Panchayat: Jamankira
Work Code: OD/371/3560/121318/381932/00026703 (Imp. of Road with Gr-II Metalling from NH 53 to Naikdihi pada)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Jamankira Proposal Date: 19-07-2024
Date of Commencement: 08-12-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance and improvement of Road infrastructure
Project Sub-Category: Mettalling Road Project Type: Upgradation or Improvement
Name of Executant: AJIT KUMAR BEHERA
Administrative Approval Details
Approval No.: OD/371/3560/121318/381932/00026703/AS
Technical Sanction Details
Technical Sanction No.: OD/371/3560/121318/381932/00026703/TS
Fund Sanction No.: 1130
Fund Sanction Amount (in Rs.): 1000000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM025 BRM041 BRM029 BRM340 BRM028 BRM044 BRM060 BRM052 BRM104 BRM092 BRM341
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Road Work (AR1307) :.Supplying & spreading moorum and consolidation with HRR - Supplying & spreading moorum and consolidation with HRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 144 Cum 1.28 184.32 - - - - - - - - - - - - - - - - - - - -
2 Road Work (AR1305) :.Filler materials laterite moorum and consolidation with H.R.R. - Supplying & spreading metal to proper camber and consolidation with filler materials laterite moorum and consolidation with H.R.R. including watering and turf edging including cost, conveyance, royalty, and taxes, etc. required for work as per specification and direction of Engineer-in-Charge. 144 Cum 0.3 43.2 1 144 - - - - - - - - - - - - - - - - - -
3 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 50.22 Cum - - - - - - - - - - - - - - - - - - - - - -
4 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 29.34 Cum - - - - 1 29.34 - - - - - - - - - - - - - - - -
5 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 64.005 Cum - - - - - - 2.29 146.57145 0.48 30.7224 0.96 61.4448 - - - - - - - - - -
6 R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 2.25 Cum - - - - - - 3.4733 7.814925 0.45 1.0125 - - 0.36 0.81 0.54 1.215 0.004005 0.00901125 0.000921 0.00207225 - -
7 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 3 Qntl - - - - - - - - - - - - - - - - - - - - 1.05 3.15
8 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 54 Sqm - - - - - - - - - - - - - - - - 0.00267 0.14418 0.000614 0.033156 - -
Total Qty 227.52 144 29.34 154.386375 31.7349 61.4448 0.81 1.215 0.15319125 0.03522825 3.15
Rate Per Unit 63.25 201.5 63.25 0 63.25 701.5 201.5 201.5 0 0 0
Total Amount 14390.64 29016 1855.755 0 2007.232425 43103.5272 163.215 244.8225 0 0 0
Total Royalty Amount (in Rs.): 90781.192125