State: Odisha District: Nayagarh Block: Dasapalla Gram Panchayat: Tumandi
Work Code: OD/367/3524/120625/405488/00040355 (Imp. of road from Narajipada to Karadakancha Nala)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Dasapalla Proposal Date: -
Date of Commencement: 30-07-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance and improvement of Road infrastructure
Project Sub-Category: CC Road Project Type: Upgradation or Improvement
Name of Executant: Rasmi Ranjan Dash
Administrative Approval Details
Approval No.: OD/367/3524/120625/405488/00040355/AS
Technical Sanction Details
Technical Sanction No.: OD/367/3524/120625/405488/00040355/TS
Fund Sanction No.: 9114
Fund Sanction Amount (in Rs.): 310000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 22.265 Cum 1 22.265 - - - - - - - - - - - -
2 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 22.265 Cum - - 2.29 50.98685 0.48 10.6872 0.96 21.3744 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 22.1874375 Cum - - 3.23 71.665423125 0.45 9.984346875 - - 0.9 19.96869375 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 24.4 Sqm - - - - - - - - - - 0.00267 0.065148 0.000614 0.0149816
5 Earth Work (AR0102b) :.Earth work in hard soil or gravelly soil in embankment, roads etc. within 50m initial lead and 1.5m initial lift and Compaction with P.R.R - Earth work in hard soil or gravelly soil in embankment, roads etc. within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per specification approved by the Department alongwith proper compaction with P.R.R. including hire and running charges of P.R.R. (section measurement to be taken on the finished compacted section of the fill) as per direction of Engineer-in-Charge. 36.9 Cum - - - - - - - - - - - - - -
Total Qty 22.265 122.652273125 20.671546875 21.3744 19.96869375 0.065148 0.0149816
Rate Per Unit 305.25 0 305.25 199.5 199.5 0 0
Total Amount 6796.39125 0 6309.9896835938 4264.1928 3983.754403125 0 0
Total Royalty Amount (in Rs.): 21354.328136719