State: Odisha District: Mayurbhanj Block: Kuliana Gram Panchayat: Bhagabanpur
Work Code: OD/365/3500/120245/389266/00041155 (Maintenance of Bathing Ghat at Badnuagaon majhiban ponds)
Project Category: Water Body
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Kuliana Proposal Date: -
Date of Commencement: 12-01-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Bathing Ghat or Changing Room Project Type: Repair and Maintenance
Name of Executant: Antaryami Behera
Administrative Approval Details
Approval No.: OD/365/3500/120245/389266/00041155/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3500/120245/389266/00041155/TS
Fund Sanction No.: 26956
Fund Sanction Amount (in Rs.): 350000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM025 BRM029 BRM340 BRM028 BRM049 BRM120
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Road Work (AR1308) :.moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 54.75 Cum 0.89578798586572 49.044392226148 0.384 21.024 - - - - - - - -
2 Concrete (AR0312b) :.Grouting approns and revetment 23cm deep with concrete hand broken stone in cement mortar (1:2) with 2.5cm broken granite metal - Grouting approns and revetment 23cm deep with concrete hand broken stone in cement mortar (1:2) with 2.5cm broken granite metal including watering, curing for seven days with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work, etc. complete and as per direction of Engineer-in charge. 365 Sqm - - - - 0.098 35.77 0.014 5.11 0.036 13.14 - -
3 Flooring (AR0816c) :.Fixing Kota Tiles of minimum 16 mm thick Up to 0.10 Sqm. in floor, treads or steps and landing on a 25mm thick bed of cement mortar 1:1 - Fixing Kota Tiles of minimum 16 mm thick Up to 0.10 Sqm. in floor, treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the kota tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 81.18 Sqm - - - - 0.2737 22.218966 0.013 1.05534 - - 1 81.18
4 Flooring (AR0817ai) :.Fixing Kota Tiles of minimum 16 mm thick Up to 0.10 Sqm. in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Kota Tiles of minimum 16 mm thick Up to 0.10 Sqm. in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Kota tiles including rubbing and polishing complete including cost of precast tiles. 18.48 Sqm - - - - 0.1375 2.541 0.015 0.2772 - - 1 18.48
Total Qty 49.044392226148 21.024 60.529966 6.44254 13.14 99.66
Rate Per Unit 140.25 490.25 0 490.25 537.5 133.31
Total Amount 6878.4760097173 10307.016 0 3158.455235 7062.75 13285.6746
Total Royalty Amount (in Rs.): 40692.371844717