| State: Odisha |
District: Gajapati |
Block: R.Udayagiri |
Gram Panchayat: Bastariguda |
Work Code: OD/353/3362/275069/414151/00050519 (Improvement of Road at Tandiguda)
Project Category: Road
| Financial Year: 2024-25 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, R.Udayagiri |
Proposal Date: - |
| Date of Commencement: 11-09-2025 |
Date of Completion: 01-12-2025 |
| Scheme Name: 5th SFC Grant in Aid |
Scheme Component Name: All Weather Connectivity |
| Project Sub-Category: CC Road |
Project Type: Upgradation or Improvement |
| Name of Executant: Sourjya Kanta Mishra |
|
Administrative Approval Details
Approval No.: OD/353/3362/275069/414151/00050519/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3362/275069/414151/00050519/TS
Fund Sanction No.: 28963
Fund Sanction Amount (in Rs.): 210000
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM029 |
BRM340 |
BRM028 |
BRM044 |
BRM056 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0103a) :.Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department |
5.76 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
10.08 |
Cum |
1 |
10.08 |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
15.52 |
Cum |
- |
- |
2.29 |
35.5408 |
0.48 |
7.4496 |
0.96 |
14.8992 |
- |
- |
| 4 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
11.68 |
Cum |
- |
- |
3.23 |
37.7264 |
0.45 |
5.256 |
- |
- |
0.9 |
10.512 |
| Total Qty |
10.08 |
73.2672 |
12.7056 |
14.8992 |
10.512 |
| Rate Per Unit |
279.25 |
0 |
279.25 |
269.5 |
269.5 |
| Total Amount |
2814.84 |
0 |
3548.0388 |
4015.3344 |
2832.984 |
Total Royalty Amount (in Rs.): 13211.1972