State: Odisha District: Gajapati Block: R.Udayagiri Gram Panchayat: Bastariguda
Work Code: OD/353/3362/275069/414151/00050519 (Improvement of Road at Tandiguda)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, R.Udayagiri Proposal Date: -
Date of Commencement: 11-09-2025 Date of Completion: 01-12-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: CC Road Project Type: Upgradation or Improvement
Name of Executant: Sourjya Kanta Mishra
Administrative Approval Details
Approval No.: OD/353/3362/275069/414151/00050519/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3362/275069/414151/00050519/TS
Fund Sanction No.: 28963
Fund Sanction Amount (in Rs.): 210000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0103a) :.Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department 5.76 Cum - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 10.08 Cum 1 10.08 - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 15.52 Cum - - 2.29 35.5408 0.48 7.4496 0.96 14.8992 - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.68 Cum - - 3.23 37.7264 0.45 5.256 - - 0.9 10.512
Total Qty 10.08 73.2672 12.7056 14.8992 10.512
Rate Per Unit 279.25 0 279.25 269.5 269.5
Total Amount 2814.84 0 3548.0388 4015.3344 2832.984
Total Royalty Amount (in Rs.): 13211.1972