State: Odisha District: Sambalpur Block: Rairakhol Gram Panchayat: Luhapank
Work Code: OD/371/3565/121406/382416/00055790 (Construction of Market Complex, Luhapank )
Project Category: Building
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Rairakhol Proposal Date: -
Date of Commencement: 14-11-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Creation of Capital Asset for Revenue Generation
Project Sub-Category: Market Complex Project Type: New Work
Name of Executant: Hemangini Bhoi
Administrative Approval Details
Approval No.: OD/371/3565/121406/382416/00055790/AS
Technical Sanction Details
Technical Sanction No.: OD/371/3565/121406/382416/00055790/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 1000000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM060 BRM052 BRM104 BRM092 BRM084 BRM094 BRM006 BRM057 BRM341 BRM149 BRM253 BRM140 BRM255 BRM137
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 43.9112 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 32.24226 Cum 1 32.24226 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.17292 Cum - - 2.29 37.0359868 0.48 7.7630016 0.96 15.5260032 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 3.721 Cum - - 3.4733 12.9241493 0.45 1.67445 - - 0.36 1.33956 0.54 2.00934 0.004005 0.014902605 0.000921 0.003427041 - - - - - - - - - - - - - - - - - - - -
5 R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) 2.377855 Cum - - 3.4733 8.2590037715 0.45 1.07003475 - - 0.36 0.8560278 0.54 1.2840417 0.01335 0.03174436425 0.00307 0.00730001485 - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 4.02292 Cum - - 3.4733 13.972808036 0.45 1.810314 - - 0.36 1.4482512 0.54 2.1723768 0.041529 0.16706784468 - - 0.045339 0.18239516988 - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0404Ad) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 1.550775 Cum - - 3.4733 5.3863068075 0.45 0.69784875 - - 0.36 0.558279 0.54 0.8374185 0.0741335 0.1149643784625 - - - - 0.049542 0.07682849505 - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 6.23348 Cum - - 3.4733 21.650746084 0.45 2.805066 - - 0.36 2.2440528 0.54 3.3660792 0.0502172 0.313027911856 - - 0.076659 0.47785234332 - - - - - - - - - - - - - - - - - -
9 Masonry Brick Work (AR0603c) :.Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 15.424775 Cum - - 0.672 10.3654488 0.28 4.318937 - - - - - - - - - - - - - - 400 6169.91 - - - - - - - - - - - - - -
10 Masonry Brick Work (AR0603ci) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 26.352503 Cum - - 0.672 17.708882016 0.28 7.37870084 - - - - - - - - - - - - - - 400 10541.0012 - - - - - - - - - - - - - -
11 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 136.272768 Sqm - - 0.0358 4.8785650944 0.015 2.04409152 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
12 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 171.03148 Sqm - - 0.043 7.35435364 0.018 3.07856664 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
13 Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 92.7878 Sqm - - 0.0372 3.45170616 0.0075 0.6959085 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
14 Flooring (AR0802ii) :.2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. 65.0485 Sqm - - 0.0858 5.5811613 0.012 0.780582 - - - - - - - - - - - - - - - - 0.023 1.4961155 - - - - - - - - - - - -
15 Other Building Items. (AR1902) :.cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 159.19 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
16 Iron Work(AR1703) :.Iron work wrought and put up in trusses and record racks - Iron work wrought and put up in trusses and record racks including all cost of labour, material, machinery and T & P required for the work etc. as per direction of Engineer-in-Charge. 7.416 Qntl - - - - - - - - - - - - - - - - - - - - - - - - 1 7.416 - - - - - - - - - -
17 Roofing (AR1132) :.Supplying, feeting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties - Supplying, fitting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting, Labour and material etc. complete as per direction of Engineer-in-Charge 41.4656 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - 1 41.4656 - - - - - - - -
18 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 291.23 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 24.46332 - - - - - -
19 Painting(AR0919) :.Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 159.19 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.075 11.93925 - - - -
20 Painting(AR0918Ai) :.Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. 132.04 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.075 9.903 - -
21 Painting(AR0901b) :.Priming one coat in inner surface with primer of approved quality over iron work. - Priming one coat in inner surface with primer of approved quality over iron work including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 10.602288 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.054 0.572523552
22 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 18.14 Qntl - - - - - - - - - - - - - - - - - - - - - - - - 1.05 19.047 - - - - - - - - - -
Total Qty 32.24226 148.5691178094 34.1175016 15.5260032 6.4461708 9.6692562 0.6417071042485 0.01072705585 0.6602475132 0.07682849505 16710.9112 1.4961155 26.463 41.4656 24.46332 11.93925 9.903 0.572523552
Rate Per Unit 69 0 69 189 189 189 0 0 0 0 0.069 189 0 0 0 0 0 0
Total Amount 2224.71594 0 2354.1076104 2934.4146048 1218.3262812 1827.4894218 0 0 0 0 1153.0528728 282.7658295 0 0 0 0 0 0
Total Royalty Amount (in Rs.): 11994.8725605