| State: Odisha |
District: Rayagada |
Block: Muniguda |
Gram Panchayat: Saradhapur |
Work Code: OD/370/3554/121221/424749/00056749 (REPAIR AND MAINTANCE OF SARADHAPUR HIGH SCHOOL )
Project Category: Building
| Financial Year: 2023-24 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Muniguda |
Proposal Date: - |
| Date of Commencement: 11-11-2025 |
Date of Completion: - |
| Scheme Name: Construction of Additional Class Room in Secondary Schools |
Scheme Component Name: Self/Personal Deposit |
| Project Sub-Category: Secondary School |
Project Type: Repair and Maintenance |
| Name of Executant: Sanjam Kumar Nayak |
|
Administrative Approval Details
Approval No.: OD/370/3554/121221/424749/00056749/AS
Technical Sanction Details
Technical Sanction No.: OD/370/3554/121221/424749/00056749/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 120000
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM253 |
BRM142 |
BRM141 |
BRM340 |
BRM028 |
BRM064 |
BRM056 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Dismantling (AR1621) :.Removing old grading plaster from roof - Removing old grading plaster from roof slab, cleaning the surface,lowering and removing the debris within 50m lead and as per direction of Engineer-in-Charge. |
90.25 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. |
216 |
Sqm |
0.084 |
18.144 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) |
216 |
Sqm |
- |
- |
0.25 |
54 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) |
6.4 |
Sqm |
- |
- |
- |
- |
0.125 |
0.8 |
- |
- |
- |
- |
- |
- |
- |
- |
| 5 |
Plastering (AR1004) :.First Floor - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. |
6 |
Sqm |
- |
- |
- |
- |
- |
- |
0.0358 |
0.2148 |
0.015 |
0.09 |
- |
- |
- |
- |
| 6 |
Concrete (AR0318) :.4cm thick grading concrete (1:2:4) on roof slab with 12mm size hard granite chips (Crusher Broken) - 4cm thick grading concrete (1:2:4) on roof slab with 12mm size hard granite chips (Crusher Broken) including hoisting and laying in position compacting and curing for the proper period with cost conveyance, royalty, taxes of all materials, labor and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (Old Work) |
90.25 |
Sqm |
- |
- |
- |
- |
- |
- |
0.1287 |
11.615175 |
0.018 |
1.6245 |
0.018 |
1.6245 |
0.018 |
1.6245 |
| 7 |
Dismantling (AR1612) :.Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. |
24 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 8 |
Flooring (AR0802i) :.2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG crusher broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG crusher broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. |
24 |
Sqm |
- |
- |
- |
- |
- |
- |
0.0858 |
2.0592 |
0.012 |
0.288 |
- |
- |
0.023 |
0.552 |
| Total Qty |
18.144 |
54 |
0.8 |
13.889175 |
2.0025 |
1.6245 |
2.1765 |
| Rate Per Unit |
0 |
0 |
0 |
0 |
91.25 |
159.9 |
159.9 |
| Total Amount |
0 |
0 |
0 |
0 |
182.728125 |
259.75755 |
348.02235 |
Total Royalty Amount (in Rs.): 790.508025