State: Odisha District: Khordha Block: Balianta Gram Panchayat: Jhinti Sasan
Work Code: OD/362/3456/119542/407665/00061573 (CONSTRUCTION OF KALYAN MANDAP AT HATAPOKHARISAHI ,JHINTISASAN GP)
Project Category: Building
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Balianta Proposal Date: 02-05-2025
Date of Commencement: 06-11-2025 Date of Completion: 24-11-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Creation of Capital Asset for Revenue Generation
Project Sub-Category: Kalyan Mandap Project Type: New Work
Name of Executant: RANJIT BALABANTARAY
Administrative Approval Details
Approval No.: OD/362/3456/119542/407665/00061573/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3456/119542/407665/00061573/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 1000000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM341 BRM094 BRM104 BRM084 BRM340 BRM028 BRM060 BRM052
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 50.1 Qntl 1.05 52.605 - - - - - - - - - - - - - -
2 R.C.C. Work (AR0410e) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. Lintels Data for 7.8 sqm 15 Sqm - - 0.0035384615384615 0.053076923076923 0.0052948717948718 0.079423076923077 - - - - - - - - - -
3 R.C.C. Work (AR0410d) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 124.429 Sqm - - - - 0.0051904761904762 0.64584576190476 0.0056666666666667 0.70509766666667 - - - - - - - -
4 R.C.C. Work (AR0410a) :.Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 200.115 Sqm - - - - 0.0050222222222222 1.005022 0.0076666666666667 1.534215 - - - - - - - -
5 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 43.317475 Cum - - - - - - - - 3.4733 150.4545859175 0.45 19.49286375 0.36 15.594291 0.54 23.3914365
Total Qty 52.605 0.053076923076923 1.7302908388278 2.2393126666667 150.4545859175 19.49286375 15.594291 23.3914365
Rate Per Unit 0 0 0 0 0 146.25 319.5 319.5
Total Amount 0 0 0 0 0 2850.8313234375 4982.3759745 7473.56396175
Total Royalty Amount (in Rs.): 15306.771259687