State: Odisha District: Puri Block: Satyabadi Gram Panchayat: Sukal
Work Code: OD/369/3546/121105/409700/00061767 (Const of CC Road from GP Road to Crematorium Ground Road)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Satyabadi Proposal Date: 31-12-2024
Date of Commencement: 23-10-2025 Date of Completion: 28-11-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance and improvement of Road infrastructure
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: NILIMA MOHANTY
Administrative Approval Details
Approval No.: OD/369/3546/121105/409700/00061767/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3546/121105/409700/00061767/TS
Fund Sanction No.: 31142
Fund Sanction Amount (in Rs.): 186532
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 44.3475 Cum 1 44.3475 - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 4.015 Cum - - 2.29 9.19435 0.48 1.9272 0.96 3.8544 - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 4.015 Cum - - 3.23 12.96845 0.45 1.80675 - - 0.9 3.6135
Total Qty 44.3475 22.1628 3.73395 3.8544 3.6135
Rate Per Unit 75.25 0 75.25 309.5 309.5
Total Amount 3337.149375 0 280.9797375 1192.9368 1118.37825
Total Royalty Amount (in Rs.): 5929.4441625