State: Odisha District: Puri Block: Delanga Gram Panchayat: Godiputmatiapada
Work Code: OD/369/3538/120914/408665/00061932 (REPAIR AND MAINENANCE OF GOPINATHPUR BHAGABAT HOUSE TO BIJU BEHERA HOUSE CC ROAD )
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Delanga Proposal Date: -
Date of Commencement: 17-11-2025 Date of Completion: 19-11-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: LOPAMUDRA SAMAL
Administrative Approval Details
Approval No.: OD/369/3538/120914/408665/00061932/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3538/120914/408665/00061932/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 143788
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 8.868 Cum - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 8.15625 Cum 1 8.15625 - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.875 Cum - - 2.29 24.90375 0.48 5.22 0.96 10.44 - -
4 Concrete (AR0307) :.Second floor - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 8.15625 Cum - - 3.23 26.3446875 0.45 3.6703125 - - 0.9 7.340625
Total Qty 8.15625 51.2484375 8.8903125 10.44 7.340625
Rate Per Unit 75.25 0 75.25 309.5 309.5
Total Amount 613.7578125 0 668.996015625 3231.18 2271.9234375
Total Royalty Amount (in Rs.): 6785.857265625