State: Odisha District: Puri Block: Krushnaprasad Gram Panchayat: Badajhada
Work Code: OD/369/3542/120993/410048/00062059 (Const of CC road from Jenapur Village to smasan, vill-Jenapur)
Project Category: Road
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Krushnaprasad Proposal Date: -
Date of Commencement: 24-10-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance and improvement of Road infrastructure
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: Amiya Kumar Panda
Administrative Approval Details
Approval No.: OD/369/3542/120993/410048/00062059/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3542/120993/410048/00062059/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 1000000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 36.1375 Cum 1 36.1375 - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 65.0475 Cum - - 2.29 148.958775 0.48 31.2228 0.96 62.4456 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 65.0475 Cum - - 3.23 210.103425 0.45 29.271375 - - 0.9 58.54275 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 74.34 Sqm - - - - - - - - - - 0.00267 0.1984878 0.000614 0.04564476
Total Qty 36.1375 359.0622 60.494175 62.4456 58.54275 0.1984878 0.04564476
Rate Per Unit 40.25 0 144.25 293.5 293.5 0 0
Total Amount 1454.534375 0 8726.28474375 18327.7836 17182.297125 0 0
Total Royalty Amount (in Rs.): 45690.89984375