| State: Odisha |
District: Sonepur |
Block: Binka |
Gram Panchayat: Sankara |
Work Code: OD/372/3567/121435/419086/00062593 (Const. of Toilet in AWC Bagbahali)
Project Category: Building
| Financial Year: 2020-21 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Binka |
Proposal Date: 14-02-2022 |
| Date of Commencement: - |
Date of Completion: - |
| Scheme Name: Asset Management Women and Child Development Department |
Scheme Component Name: Self/Personal Deposit |
| Project Sub-Category: AWC |
Project Type: New Work |
| Name of Executant: |
|
Administrative Approval Details
Approval No.:
Technical Sanction Details
Technical Sanction No.:
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 12000
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM044 |
BRM056 |
BRM253 |
BRM140 |
BRM255 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
0.285 |
Cum |
2.29 |
0.65265 |
0.48 |
0.1368 |
0.96 |
0.2736 |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
0.286 |
Cum |
3.23 |
0.92378 |
0.45 |
0.1287 |
- |
- |
0.9 |
0.2574 |
- |
- |
- |
- |
- |
- |
| 3 |
Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. |
34.26 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
0.084 |
2.87784 |
- |
- |
- |
- |
| 4 |
Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) |
11.22 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.125 |
1.4025 |
- |
- |
| 5 |
Painting(AR0918cb) :.Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) |
21.84 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
0.090322580645161 |
1.9726451612903 |
- |
- |
0.125 |
2.73 |
| Total Qty |
1.57643 |
0.2655 |
0.2736 |
0.2574 |
4.8504851612903 |
1.4025 |
2.73 |
| Rate Per Unit |
0 |
170.25 |
279.5 |
279.5 |
0 |
0 |
0 |
| Total Amount |
0 |
45.201375 |
76.4712 |
71.9433 |
0 |
0 |
0 |
Total Royalty Amount (in Rs.): 193.615875