State: Odisha District: Gajapati Block: Kasinagar Gram Panchayat: Parthada
Work Code: OD/353/3359/117485/414559/00064754 (Improvement of Tank at T.Gorba in Convergence with MGNREGA)
Project Category: Water Body
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Kasinagar Proposal Date: -
Date of Commencement: 24-11-2025 Date of Completion: -
Scheme Name: Kandhamal O Gajapati Bikas Yojana Scheme Component Name: Self/Personal Deposit
Project Sub-Category: Tank Project Type: Upgradation or Improvement
Name of Executant: Raj Kumar Sahoo
Administrative Approval Details
Approval No.: OD/353/3359/117485/414559/00064754/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3359/117485/414559/00064754/TS
Fund Sanction No.: 2022
Fund Sanction Amount (in Rs.): 200000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.916 Cum - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 0.243 Cum 1 0.243 - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 5.832 Cum - - 2.29 13.35528 0.48 2.79936 0.96 5.59872 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 12.96 Sqm - - - - - - - - 0.00267 0.0346032 0.000614 0.00795744
5 Special items for irrigation works(AR0216) :.Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum within an initial lead of 1km from the place of excavation. - Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete. Per 1 cum. 2354.8 Cum - - - - - - - - - - - -
Total Qty 0.243 13.35528 2.79936 5.59872 0.0346032 0.00795744
Rate Per Unit 279.25 0 279.25 269.5 0 0
Total Amount 67.85775 0 781.72128 1508.85504 0 0
Total Royalty Amount (in Rs.): 2358.43407