State: Odisha District: Cuttack Block: Mahanga Gram Panchayat: Kuhunda
Work Code: OD/350/3339/117001/399490/00066635 (Metal & Moorum road from Kuhunda dandi to Naga tota road)
Project Category: Road
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Mahanga Proposal Date: -
Date of Commencement: 05-12-2025 Date of Completion: 24-12-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: Mettalling Road Project Type: Upgradation or Improvement
Name of Executant: JAGANNATH PRASADA BARIK
Administrative Approval Details
Approval No.: OD/350/3339/117001/399490/00066635/AS
Technical Sanction Details
Technical Sanction No.: OD/350/3339/117001/399490/00066635/TS
Fund Sanction No.: 9122
Fund Sanction Amount (in Rs.): 143704
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM025 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Road Work (AR1308) :.moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 31.923227648 Cum 0.89578798586572 28.596443797135 0.384 12.258519416832
2 Road Work (AR1306) :.Labour for admixture of sand and moorum - Labour for admixture of sand and moorum including labour cost, for work as per specification and direction of Engineer-in-Charge. 31.923227648 Cum - - - -
3 Road Work (AR1309) :.metal and packing the voids with small stones and hand packing the same to proper camber - Supplying & spreading metal and packing the voids with small stones and hand packing the same to proper camber including conveying spreading of moorum and filling the interstices by spreading the same over the surface, watering, and consolidation with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge.(To be used for minor repair works only) (Complete thickness 75mm) 25.32371424 Cum 0.29328621908127 7.4270964025442 - -
Total Qty 36.023540199679 12.258519416832
Rate Per Unit 1161 81.5
Total Amount 41823.330171827 999.06933247181
Total Royalty Amount (in Rs.): 42822.399504299