State: Odisha District: Puri Block: Brahmagiri Gram Panchayat: Manapada
Work Code: OD/369/3537/120903/409943/00069676 (Renovation of pond at SisupurVillage)
Project Category: Water Body
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Brahmagiri Proposal Date: -
Date of Commencement: 11-12-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Guard Wall or Retaining Wall or Protection Wall Project Type: New Work
Name of Executant: GITANJALI BEHERA
Administrative Approval Details
Approval No.: OD/369/3537/120903/409943/00069676/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3537/120903/409943/00069676/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 500000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 76.45536 Cum - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 12.74256 Cum 1 12.74256 - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 69.1496256 Cum - - 2.29 158.352642624 0.48 33.191820288 0.96 66.383640576 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 209.03175 Sqm - - - - - - - - 0.00267 0.5581147725 0.000614 0.1283454945
Total Qty 12.74256 158.352642624 33.191820288 66.383640576 0.5581147725 0.1283454945
Rate Per Unit 75.25 0 75.25 170.5 0 0
Total Amount 958.87764 0 2497.684476672 11318.410718208 0 0
Total Royalty Amount (in Rs.): 14774.97283488