State: Odisha District: Puri Block: Sadar Gram Panchayat: Ganganarayanpur
Work Code: OD/369/3545/275344/409735/00070053 (Repair and renovation of of barabodia jena sahi primary school, ganga narayanpur)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Sadar Proposal Date: -
Date of Commencement: 21-01-2026 Date of Completion: -
Scheme Name: Bikashita Gaon Bikashita Odisha Scheme Component Name: Viksit Gaon Vikshit Odisha (VGVO)
Project Sub-Category: Elementary School Project Type: Renovation or Rejuvenation
Name of Executant: Tapabanta Sahoo
Administrative Approval Details
Approval No.: OD/369/3545/275344/409735/00070053/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3545/275344/409735/00070053/TS
Fund Sanction No.: 3221
Fund Sanction Amount (in Rs.): 310105
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM084 BRM104 BRM340 BRM028 BRM060 BRM052 BRM005 BRM341
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410a) :.Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 73.92 Sqm 0.0076666666666667 0.56672 0.0050222222222222 0.37124266666667 - - - - - - - - - - - -
2 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 12.65335 Cum - - - - 3.4733 43.948880555 0.45 5.6940075 0.36 4.555206 0.54 6.832809 - - - -
3 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 6.9753125 Cum - - - - 0.672 4.68741 0.28 1.9530875 - - - - 350 2441.359375 - -
4 R.C.C. Work (AR0410d) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 25.475 Sqm 0.0056666666666667 0.14435833333333 0.0051904761904762 0.13222738095238 - - - - - - - - - - - -
5 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 12 Qntl - - - - - - - - - - - - - - 1.05 12.6
6 Plastering (AR1017) :.20mm thick cement Plaster in CM (1:4) over masonry work in inside. - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 73.92 Sqm - - - - 0.0744 5.499648 0.021 1.55232 - - - - - - - -
Total Qty 0.71107833333333 0.50347004761905 54.135938555 9.199415 4.555206 6.832809 2441.359375 12.6
Rate Per Unit 0 0 0 75.25 170.5 170.5 0 0
Total Amount 0 0 0 692.25597875 776.662623 1164.9939345 0 0
Total Royalty Amount (in Rs.): 2633.91253625