| State: Odisha |
District: Gajapati |
Block: Mohona |
Gram Panchayat: Raipanka |
Work Code: OD/353/3360/117518/413632/00070751 (Construction of CC Road from Raba PMGSY to Likhiguda)
Project Category: Road
| Financial Year: 2025-26 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Mohona |
Proposal Date: 18-09-2025 |
| Date of Commencement: 03-02-2026 |
Date of Completion: - |
| Scheme Name: Bikashita Gaon Bikashita Odisha |
Scheme Component Name: Viksit Gaon Vikshit Odisha (VGVO) |
| Project Sub-Category: CC Road |
Project Type: New Work |
| Name of Executant: Sunil Kumar Ratha |
|
Administrative Approval Details
Approval No.: OD/353/3360/117518/413632/00070751/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3360/117518/413632/00070751/TS
Fund Sanction No.: 3398
Fund Sanction Amount (in Rs.): 400000
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM029 |
BRM340 |
BRM028 |
BRM044 |
BRM104 |
BRM092 |
BRM056 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
27.36 |
Cum |
1 |
27.36 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
33.06 |
Cum |
- |
- |
2.29 |
75.7074 |
0.48 |
15.8688 |
0.96 |
31.7376 |
- |
- |
- |
- |
- |
- |
| 3 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
76 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
0.00267 |
0.20292 |
0.000614 |
0.046664 |
- |
- |
| 4 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
20.52 |
Cum |
- |
- |
3.23 |
66.2796 |
0.45 |
9.234 |
- |
- |
- |
- |
- |
- |
0.9 |
18.468 |
| 5 |
Earth Work (AR0103aa) :.Earthwork in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume in foundation and plinth within 50m. Initial lead and 1.5m - Earthwork in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume in foundation and plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department |
9.5 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| Total Qty |
27.36 |
141.987 |
25.1028 |
31.7376 |
0.20292 |
0.046664 |
18.468 |
| Rate Per Unit |
279.25 |
0 |
279.25 |
269.5 |
0 |
0 |
269.5 |
| Total Amount |
7640.28 |
0 |
7009.9569 |
8553.2832 |
0 |
0 |
4977.126 |
Total Royalty Amount (in Rs.): 28180.6461