| 1 |
Odisha |
Nuapada |
Boden |
Boirgaon |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Sunamudi RD Road to Doctor house |
67 days |
| 2 |
Odisha |
Nuapada |
Boden |
Farsara |
Parthasarathi Nayak |
Desk Officer |
Construction of Culvert at Bakhulikhunti Masanpada Road |
67 days |
| 3 |
Odisha |
Nuapada |
Boden |
Bhainsadani |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at Kanchanpur Basti |
67 days |
| 4 |
Odisha |
Nuapada |
Boden |
Litisargi |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Dahanapali Main Road to Mali Pada Gali |
67 days |
| 5 |
Odisha |
Nuapada |
Boden |
Boden |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Tetelpada RD Road to Binopur Chhatriapada |
67 days |
| 6 |
Odisha |
Nuapada |
Boden |
Boden |
Parthasarathi Nayak |
Desk Officer |
Construction of Culvert at Temri Road to Ludgha Pada |
67 days |
| 7 |
Odisha |
Nuapada |
Sinapali |
Ghantiguda |
Parthasarathi Nayak |
Desk Officer |
Impv. of Road from Sardhapur katapada to Karlapani road at Sardhapur |
67 days |
| 8 |
Odisha |
Nuapada |
Sinapali |
Singjhar |
Parthasarathi Nayak |
Desk Officer |
Const. of Culvert at RD.Road to Missson shakti Road at Singjhar |
67 days |
| 9 |
Odisha |
Nuapada |
Sinapali |
Kusumjore |
Parthasarathi Nayak |
Desk Officer |
Const. of Culvert with guardwall at Haldikhol masanpada to Bandhpada road, vill-Haldikhol |
67 days |
| 10 |
Odisha |
Nuapada |
Sinapali |
Nangalbod |
Parthasarathi Nayak |
Desk Officer |
Const of CC Road from Kothipada to Rajamunda road, Vill-Nangalbod |
67 days |
| 11 |
Odisha |
Nuapada |
Sinapali |
Godal |
Parthasarathi Nayak |
Desk Officer |
Completion of C.C Road from Brahmanpada Basti to Smasanghat at Brahmanpada |
67 days |
| 12 |
Odisha |
Nuapada |
Sinapali |
Godal |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road at Rohenpadar Pada of Godal Village |
67 days |
| 13 |
Odisha |
Nuapada |
Sinapali |
Kharsel |
Parthasarathi Nayak |
Desk Officer |
Impv. of Road from Baigapada Bargachha chhak to Sahupada Road at Baigapada |
67 days |
| 14 |
Odisha |
Nuapada |
Sinapali |
Gorla |
Parthasarathi Nayak |
Desk Officer |
Repair & maintenance of CC Road from Gorla Chhar Chak to Tal Pada Road at Gorla |
67 days |
| 15 |
Odisha |
Nuapada |
Sinapali |
Nuamalpada |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road from main road to portipada Hostel |
67 days |
| 16 |
Odisha |
Nuapada |
Sinapali |
Chatiaguda |
Parthasarathi Nayak |
Desk Officer |
Imp. of Road from RD Road to Behera Pita Road at Chatiaguda |
67 days |
| 17 |
Odisha |
Nuapada |
Khariar |
Tukla |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road from Tukla Mausi Mandir Pada to Risipiti Road |
67 days |
| 18 |
Odisha |
Nuapada |
Khariar |
Baddohel |
Parthasarathi Nayak |
Desk Officer |
Construction of Road and Guardwall from Sandohel to Nehena road |
67 days |
| 19 |
Odisha |
Nuapada |
Khariar |
Bargaon |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road with RCC Culvert from Podapali Sublenmunda to Masanpada Road |
67 days |
| 20 |
Odisha |
Nuapada |
Khariar |
Mandosil |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Chacharabhata Basti Road to Mise Pada Road |
67 days |
| 21 |
Odisha |
Nuapada |
Khariar |
Bhuliasikuan |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Karuan house to Meher House at Bhuliasikuan |
67 days |
| 22 |
Odisha |
Nuapada |
Khariar |
Birighat |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at kusmal Thapapada |
67 days |
| 23 |
Odisha |
Nuapada |
Khariar |
Sanmaheswar |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road at Deobahal Narihapada Road |
67 days |
| 24 |
Odisha |
Nuapada |
Khariar |
Lanji |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at Lanji Adapada |
67 days |
| 25 |
Odisha |
Nuapada |
Khariar |
Sardhapur |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road from Dhanksar Kandpada to Harijan Pada |
67 days |
| 26 |
Odisha |
Nuapada |
Komna |
Nuagaon |
Parthasarathi Nayak |
Desk Officer |
REPAIRING OF CC ROAD FROM KALIMATI UP SCHOOL TO BASTI ROAD OF NUAGAON GP |
67 days |
| 27 |
Odisha |
Nuapada |
Komna |
Lakhana |
Parthasarathi Nayak |
Desk Officer |
CONSTRUCTION OF CC ROAD FROM LALBHATA PADA TO RD ROAD OF MENDHATAL LAKHANA GP |
67 days |
| 28 |
Odisha |
Nuapada |
Komna |
Kurumpur |
Parthasarathi Nayak |
Desk Officer |
CONSTRUCTION OF CC ROAD FROM MAJHIPADA TOWARDS POKARI ROAD OF KURUMPURI GP |
67 days |
| 29 |
Odisha |
Nuapada |
Komna |
Komna |
Parthasarathi Nayak |
Desk Officer |
CONSTRUCTION OF GRADE II METALLING ROAD FROM KAJU FACTORY TOWARDS KOMNA BASTI |
67 days |
| 30 |
Odisha |
Nuapada |
Komna |
Agren |
Parthasarathi Nayak |
Desk Officer |
IMPROVEMENT OF ROAD FROM KATAPADA TO GORDHAPADA NALLA OF AGREN GP |
67 days |
| 31 |
Odisha |
Nuapada |
Komna |
Poinr |
Parthasarathi Nayak |
Desk Officer |
CONSTRUCTION OF CC ROAD FROM UP SCHOOL TOWARDS MAHULBHATA BASTI ROAD OF POINR GP |
67 days |
| 32 |
Odisha |
Nuapada |
Komna |
Konabira |
Parthasarathi Nayak |
Desk Officer |
IMPROVEMENT OF ROAD FROM RD ROAD TOWARDS BAHALMUNDA VIA KARAMAHUL ROAD OF KONABIRA GP |
67 days |
| 33 |
Odisha |
Nuapada |
Komna |
Nuagaon |
Parthasarathi Nayak |
Desk Officer |
CONSTRUCTION OF CC ROAD AT KAMKEDA GAHATIAPADA OF NUAGAON GP |
67 days |
| 34 |
Odisha |
Nuapada |
Komna |
Budhikomna |
Parthasarathi Nayak |
Desk Officer |
IMPROVEMENT OF ROAD FROM GONDWANA CHOWK TO DASPADA AT PANDRAPATHAR OF BUDHIKOMNA GP |
67 days |
| 35 |
Odisha |
Nuapada |
Nuapada |
Motanuapada |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from Torra Padpat to Kartik Majjhi house |
67 days |
| 36 |
Odisha |
Nuapada |
Nuapada |
Kendubahara |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from main road to Khaprapara Bharmani road |
67 days |
| 37 |
Odisha |
Nuapada |
Nuapada |
Godfula |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from Patelpada to Godfula Taria road |
67 days |
| 38 |
Odisha |
Nuapada |
Nuapada |
Beltukri |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road at Pandripani to Baarakothi road at Beltukri |
67 days |
| 39 |
Odisha |
Nuapada |
Nuapada |
Jampani |
Parthasarathi Nayak |
Desk Officer |
Improvement of road at Chhindpani basti to Weekly Market road |
67 days |
| 40 |
Odisha |
Nuapada |
Nuapada |
Dumerpani |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road at Silda Adibasipada from Gajanand house to Budhram Pandey house |
67 days |
| 41 |
Odisha |
Nuapada |
Nuapada |
Bhainsatal |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road at Bhandarpuri |
67 days |
| 42 |
Odisha |
Nuapada |
Nuapada |
Chulabhat |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road at Dharnipada, Supli |
67 days |
| 43 |
Odisha |
Puri |
Kakat Pur |
Lataharan |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road with Culvert from Harinababi Pahali Kandi House to Utaraghat |
75 days |
| 44 |
Odisha |
Puri |
Kakat Pur |
Abadan |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Nuagaon Kedar Mallick house to Purna Chandra Mallick house |
75 days |
| 45 |
Odisha |
Puri |
Kakat Pur |
Bangurigaon |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Kania RD Road to Maa Bhagabati Pitha |
75 days |
| 46 |
Odisha |
Puri |
Kakat Pur |
Suhanpur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Gopikantapur Trinath Mandir to Village end |
75 days |
| 47 |
Odisha |
Puri |
Kakat Pur |
Kakatpur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Kahal Tripathy sahi Durga mandir to Canal Bridge |
75 days |
| 48 |
Odisha |
Puri |
Kakat Pur |
Jaleswarpada |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Kajalpatia main road to Sanjay Biswal House |
75 days |
| 49 |
Odisha |
Puri |
Kakat Pur |
Patasundarpur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Ayurvedic Medical to Main road |
75 days |
| 50 |
Odisha |
Puri |
Kakat Pur |
Othaka |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Singhapada smasan to RD road |
75 days |
| 51 |
Odisha |
Puri |
Nimapada |
Alanda |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Manijangha harijana sahi to Potapokhari Road . |
75 days |
| 52 |
Odisha |
Puri |
Nimapada |
Antuara |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from dhusasan das to jayakrushana das house |
75 days |
| 53 |
Odisha |
Puri |
Nimapada |
Aerisandha |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from terabati kandal to mallick sahi . |
75 days |
| 54 |
Odisha |
Puri |
Nimapada |
Badamachhapur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Baragodia Sahoo Sahi road bto Tikina & Haria. |
75 days |
| 55 |
Odisha |
Puri |
Nimapada |
Badasirivila |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Badasiribula AWC to Panchayat house. |
75 days |
| 56 |
Odisha |
Puri |
Nimapada |
Baharana |
Parthasarathi Nayak |
Desk Officer |
Construction of cc road from Chhatinia sushant acharya house to laxmidhar mishra house |
75 days |
| 57 |
Odisha |
Puri |
Nimapada |
Balanga |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Balanga Beraboi road to Maunei Temple, Palikona |
75 days |
| 58 |
Odisha |
Puri |
Nimapada |
Bamanala |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from PWD road to Bamanal Harijana Sahi. |
75 days |
| 59 |
Odisha |
Puri |
Nimapada |
Bhiligram |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Bhilligram Main road to pani tanki road . |
75 days |
| 60 |
Odisha |
Puri |
Nimapada |
Bhodar |
Parthasarathi Nayak |
Desk Officer |
Construction of cc road of kantilo village main road |
75 days |
| 61 |
Odisha |
Puri |
Nimapada |
Bhogasalada |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Jajalpur PM road to Sabarna Sahi Smasan . |
75 days |
| 62 |
Odisha |
Puri |
Nimapada |
Chanrapada |
Parthasarathi Nayak |
Desk Officer |
Construction of CC from Bhatabandha Maharana Sahi to cc road to Deba Maharana House . |
75 days |
| 63 |
Odisha |
Puri |
Nimapada |
Chhanijanga |
Parthasarathi Nayak |
Desk Officer |
Construction of cc road from ampore-baharana main road to AWC centre |
75 days |
| 64 |
Odisha |
Puri |
Nimapada |
Deuna |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Gangadhara Parida Gas Godown to Biluagotha cc road - Nakadih |
75 days |
| 65 |
Odisha |
Puri |
Nimapada |
Dhaleswar |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Alandi PMGSY road to Kailash Behera house. |
75 days |
| 66 |
Odisha |
Puri |
Nimapada |
Dhanua |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Harishpur mahaveer mandir to medini sahi . |
75 days |
| 67 |
Odisha |
Puri |
Nimapada |
Gopinathpur |
Parthasarathi Nayak |
Desk Officer |
Improvement of CC road from Madhab Das house to Baikuntha Das house, Beraboi |
75 days |
| 68 |
Odisha |
Puri |
Nimapada |
Haripur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Kunia Dash house to Badal Dash house, Haripur Sasan |
75 days |
| 69 |
Odisha |
Puri |
Nimapada |
Kalapanchana |
Parthasarathi Nayak |
Desk Officer |
Construction of cc road from sabit khan house to babu khan house in khadisahi |
75 days |
| 70 |
Odisha |
Puri |
Nimapada |
Kotakosang |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Taraboi Panda Sahi road to Maunei thakurani temple |
75 days |
| 71 |
Odisha |
Puri |
Nimapada |
Miteipur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Canal bridge to kuanpatana village . |
75 days |
| 72 |
Odisha |
Puri |
Nimapada |
Nuasantrha |
Parthasarathi Nayak |
Desk Officer |
CC road from Balanga patapur road to bandhamunda comunity house road. |
75 days |
| 73 |
Odisha |
Puri |
Nimapada |
Ratilo |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Barunichhak Gramya road to Sarbeswar Pradhan House. |
75 days |
| 74 |
Odisha |
Puri |
Nimapada |
Renchsasan |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Bianla CMGSY road transfer to Pusty Sahi Road . |
75 days |
| 75 |
Odisha |
Puri |
Nimapada |
Sagada |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Chitra Bhanumati Pradhan To Mundimara . |
75 days |
| 76 |
Odisha |
Puri |
Nimapada |
Sainsasasan |
Parthasarathi Nayak |
Desk Officer |
Construction of Pradhan pokhari road, Torihabandha Pradhan Sahi |
75 days |
| 77 |
Odisha |
Puri |
Nimapada |
Salanga |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from Amaranga harijana sahi pitabasa bhoi house to pahali bhoi house . |
75 days |
| 78 |
Odisha |
Puri |
Nimapada |
Tampalo |
Parthasarathi Nayak |
Desk Officer |
Construction of cc road from bharati matha niranjan das house to bata bridge |
75 days |
| 79 |
Odisha |
Puri |
Nimapada |
Terundia |
Parthasarathi Nayak |
Desk Officer |
Construction of cc road from ojha sahi road to hari ojha house |
75 days |
| 80 |
Odisha |
Puri |
Nimapada |
Tulasipur |
Parthasarathi Nayak |
Desk Officer |
Construction of cc road from diwarkar pusty house to chinu baba matha road in kanjiagarpatana |
75 days |
| 81 |
Odisha |
Puri |
Nimapada |
Uchhupur |
Parthasarathi Nayak |
Desk Officer |
Improvement of CC road from Balanga Gabakund road to Sandhagorada Kendukrswari temple |
75 days |
| 82 |
Odisha |
Nayagarh |
Nuagaon |
Badagotha |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at Anchalika HS, Dimirijhari |
75 days |
| 83 |
Odisha |
Nayagarh |
Nuagaon |
Bahadajhola |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at Daleibhaga |
75 days |
| 84 |
Odisha |
Nayagarh |
Nuagaon |
Beruhanbari |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at Badhulipur |
75 days |
| 85 |
Odisha |
Nayagarh |
Nuagaon |
Chahalli |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at Daliamada Bandhasahi Kothaghara front |
75 days |
| 86 |
Odisha |
Nayagarh |
Nuagaon |
Durudura |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Durdura Chhaka to High School at Durdura |
75 days |
| 87 |
Odisha |
Nayagarh |
Nuagaon |
Dhenkena |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Madhuban to Malabandha |
75 days |
| 88 |
Odisha |
Nayagarh |
Nuagaon |
Haripur |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at Gopapur |
75 days |
| 89 |
Odisha |
Nayagarh |
Nuagaon |
Jakeda |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Badibari to RD road |
75 days |
| 90 |
Odisha |
Nayagarh |
Nuagaon |
Khandugaon |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road near Pokharisahi at Khandugaon |
75 days |
| 91 |
Odisha |
Nayagarh |
Nuagaon |
Maichheli |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from NH-57 to Dhipisahi |
75 days |
| 92 |
Odisha |
Nayagarh |
Nuagaon |
Sorada |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Maa Mangala Mandir to GP Office |
75 days |
| 93 |
Odisha |
Nayagarh |
Nuagaon |
Paradhipi |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Raghunath temple to Ragadisahi village |
75 days |
| 94 |
Odisha |
Nayagarh |
Nuagaon |
Nuagaon |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road near Bhuinani Danda at Khalamada |
75 days |
| 95 |
Odisha |
Nayagarh |
Nuagaon |
Korada |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at Mundiasahi |
75 days |
| 96 |
Odisha |
Nayagarh |
Nuagaon |
Gumi |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at Dimiripalli Adibasi Sahi east side near culvert |
75 days |
| 97 |
Odisha |
Nayagarh |
Nuagaon |
Sikrida |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Baramania sahi to Sikrida Badasahi |
75 days |
| 98 |
Odisha |
Nayagarh |
Nuagaon |
Singharapalli |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Karanasahi to Badasahi |
75 days |
| 99 |
Odisha |
Nayagarh |
Nuagaon |
Kaptapalli |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road at Kanabanka Danda |
75 days |
| 100 |
Odisha |
Nayagarh |
Nuagaon |
Udayapur |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at Haripur |
75 days |
| 101 |
Odisha |
Nayagarh |
Nuagaon |
Gateri |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road near Gateri club house |
75 days |
| 102 |
Odisha |
Nayagarh |
Nuagaon |
Mahipur |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road near Malisara Raghunath temple |
75 days |
| 103 |
Odisha |
Nayagarh |
Nuagaon |
Malisahi |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Hiradeipur Harijanasahi to Madhuban |
75 days |
| 104 |
Odisha |
Nayagarh |
Gania |
Kishoreprasad |
Parthasarathi Nayak |
Desk Officer |
Talasahi to smasan road cc |
75 days |
| 105 |
Odisha |
Nayagarh |
Gania |
Kishoreprasad |
Parthasarathi Nayak |
Desk Officer |
Indipatta bauti road cc |
75 days |
| 106 |
Odisha |
Nayagarh |
Gania |
Chhamundia |
Parthasarathi Nayak |
Desk Officer |
Majhisahi to barakua cc,iswarpur |
75 days |
| 107 |
Odisha |
Nayagarh |
Gania |
Belapadapatna |
Parthasarathi Nayak |
Desk Officer |
Jagannath temple belapada to wallipur cc road |
75 days |
| 108 |
Odisha |
Nayagarh |
Gania |
Rasanga |
Parthasarathi Nayak |
Desk Officer |
Dankarisahi upper sahi mahamayee to chhuinmahal cc road. |
75 days |
| 109 |
Odisha |
Nayagarh |
Gania |
Badasilinga |
Parthasarathi Nayak |
Desk Officer |
Buriapaju village road |
75 days |
| 110 |
Odisha |
Nayagarh |
Gania |
Gania |
Parthasarathi Nayak |
Desk Officer |
Gania Tanlasahi pokhari road cc |
75 days |
| 111 |
Odisha |
Nayagarh |
Gania |
Chhamundia |
Parthasarathi Nayak |
Desk Officer |
Kaibarta sahi to mundia sahi cc road |
75 days |
| 112 |
Odisha |
Nayagarh |
Odagaon |
Solapata |
Parthasarathi Nayak |
Desk Officer |
Jagati Sahi Dhani Behera House to Rabi Muduli House CC road, Village- Solapata |
75 days |
| 113 |
Odisha |
Nayagarh |
Odagaon |
Gotisahi |
Parthasarathi Nayak |
Desk Officer |
Bus Stand to Pallimangala Kendra CC road |
75 days |
| 114 |
Odisha |
Nayagarh |
Odagaon |
Magarabandha |
Parthasarathi Nayak |
Desk Officer |
Ward No.-16, Magarbandha Chhaka Sahi CC Road |
75 days |
| 115 |
Odisha |
Nayagarh |
Odagaon |
Sarankul |
Parthasarathi Nayak |
Desk Officer |
Jhadeswari Temple CC road |
75 days |
| 116 |
Odisha |
Nayagarh |
Odagaon |
Hariharpur |
Parthasarathi Nayak |
Desk Officer |
School Sahi road CC at Asuradhipa |
75 days |
| 117 |
Odisha |
Nayagarh |
Odagaon |
P.Manapur |
Parthasarathi Nayak |
Desk Officer |
Mahamayee Temple CC road at Pancharida Mil Sahi |
75 days |
| 118 |
Odisha |
Nayagarh |
Odagaon |
Godipalli |
Parthasarathi Nayak |
Desk Officer |
CC road at South Side back side of Abhimanpur Village |
75 days |
| 119 |
Odisha |
Nayagarh |
Odagaon |
Angisingi |
Parthasarathi Nayak |
Desk Officer |
Const of CC Road at Angisingi |
75 days |
| 120 |
Odisha |
Nayagarh |
Odagaon |
Badagodada |
Parthasarathi Nayak |
Desk Officer |
Biswal Sahi road CC of Patuli Sahi Village |
75 days |
| 121 |
Odisha |
Nayagarh |
Odagaon |
Sikharpur |
Parthasarathi Nayak |
Desk Officer |
Kalia Sandha CC road at Poda Sahi, Sikharpur |
75 days |
| 122 |
Odisha |
Nayagarh |
Odagaon |
Barasahi |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road at Barasahi |
75 days |
| 123 |
Odisha |
Nayagarh |
Odagaon |
Kajalaipalli |
Parthasarathi Nayak |
Desk Officer |
Kajalaipalli PWD road to AWC Kendra CC road |
75 days |
| 124 |
Odisha |
Nayagarh |
Odagaon |
Haridabandha |
Parthasarathi Nayak |
Desk Officer |
Makarprasad CC road |
75 days |
| 125 |
Odisha |
Nayagarh |
Odagaon |
Bhaliadihi |
Parthasarathi Nayak |
Desk Officer |
RD road to Harijan Sahi CC at Bhaliadihi |
75 days |
| 126 |
Odisha |
Nayagarh |
Odagaon |
Panchumu |
Parthasarathi Nayak |
Desk Officer |
RD road to Dhipa Sahi road at Pankalbari |
75 days |
| 127 |
Odisha |
Nayagarh |
Odagaon |
Golagaon |
Parthasarathi Nayak |
Desk Officer |
Khilarpatna CC road |
75 days |
| 128 |
Odisha |
Nayagarh |
Odagaon |
Godipada |
Parthasarathi Nayak |
Desk Officer |
PMGSY road to Omm Santi Bhawan road CC |
75 days |
| 129 |
Odisha |
Nayagarh |
Odagaon |
Dimisira |
Parthasarathi Nayak |
Desk Officer |
Haripur Dalabehera Sahi Smasan CC road |
75 days |
| 130 |
Odisha |
Nayagarh |
Odagaon |
Banthapur |
Parthasarathi Nayak |
Desk Officer |
Const. of Road from main road to Barakanya waterfall |
75 days |
| 131 |
Odisha |
Nayagarh |
Odagaon |
Rabigadia |
Parthasarathi Nayak |
Desk Officer |
Improvement of Dutikeswar Road |
75 days |
| 132 |
Odisha |
Nayagarh |
Odagaon |
Rabera |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Rabera school to smasan road |
75 days |
| 133 |
Odisha |
Nayagarh |
Odagaon |
Goudaput |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from Kuradhighasa pokhari to Nahakabandha |
75 days |
| 134 |
Odisha |
Nayagarh |
Odagaon |
Nandighora |
Parthasarathi Nayak |
Desk Officer |
Const. of Ghasadeipur Godisahi smasan road |
75 days |
| 135 |
Odisha |
Nayagarh |
Odagaon |
Panderipada |
Parthasarathi Nayak |
Desk Officer |
Improvement of Madnapur to Dolagobindapur road |
75 days |
| 136 |
Odisha |
Nayagarh |
Odagaon |
Sakeri |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from PWD road to sakeri primary school |
75 days |
| 137 |
Odisha |
Nayagarh |
Odagaon |
Saradhapur |
Parthasarathi Nayak |
Desk Officer |
Const. of Ambarapur Barisahi CC road |
75 days |
| 138 |
Odisha |
Cuttack |
Salepur |
Bahugram |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM 1 NO. CANAL USMAN KHAN HOUSE TO SUKA NAI, BISWANATHPUR (NIAMATPUR) |
75 days |
| 139 |
Odisha |
Cuttack |
Salepur |
Balisahi |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM MAHENDRA HOUSE TO RAGHABPUR MAIN ROAD, RAGHABPUR |
75 days |
| 140 |
Odisha |
Cuttack |
Salepur |
Barigola |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM MISHRA SAHI TO DHOBA SAHI CHHAKA, WARD NO. 7, SUNAKHANDI |
75 days |
| 141 |
Odisha |
Cuttack |
Salepur |
Bhimdaspur |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF BODHASARA WARD NO. 6 BARIK SAHI ROAD |
75 days |
| 142 |
Odisha |
Cuttack |
Salepur |
Champati |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENACE OF ROAD FROM NARAYAN PATRA HOUSE TO PRABIR MOHANTY HOUSE, WARD NO. 11, VILLAGE-CHAMPATI |
75 days |
| 143 |
Odisha |
Cuttack |
Salepur |
Chandradeipur |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM PUSPALATA HOUSE TO RABINDRA KAR HOUSE, WARD NO. 10, LUNAHAR |
75 days |
| 144 |
Odisha |
Cuttack |
Salepur |
Chhanipur |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM CHHANIPUR PARIDA SAHI TO GUDIA SAHI |
75 days |
| 145 |
Odisha |
Cuttack |
Salepur |
Gopinathpur |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM PATTAMUNDAI CANAL TO DHIRA PARIDA HOUSE, PRADHANPADA |
75 days |
| 146 |
Odisha |
Cuttack |
Salepur |
Gujarpur |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM SUJAPUR KARTIK KHATUA HOUSE TO DANIA ROAD, SUJAPUR |
75 days |
| 147 |
Odisha |
Cuttack |
Salepur |
Katrapa |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM MAHANAPUR RD ROAD TO SAMAL SAHI, WARD NO. 3, MAHANAPUR |
75 days |
| 148 |
Odisha |
Cuttack |
Salepur |
Madhyakachha |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM MOHANTY SAHI MATRUKA PATTANAIK HOUSE TO PRAKASH MOHANTY HOUSE, ATODA |
75 days |
| 149 |
Odisha |
Cuttack |
Salepur |
Mahajanpur |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF MAHAJANPUR GHADEI SAHI WARD NO. 1 ROAD |
75 days |
| 150 |
Odisha |
Cuttack |
Salepur |
Mahana |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM MAHAN 4 NO. CANAL TO GOURAHARI BEHERA HOUSE, MAHAN |
75 days |
| 151 |
Odisha |
Cuttack |
Salepur |
Malasasan |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM NILAKANTHESWAR GADA TO SUNDARI KHALIA, MALASASAN |
75 days |
| 152 |
Odisha |
Cuttack |
Salepur |
Mirzapur |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM DEULI AWC ROAD TO MOORUM ROAD |
75 days |
| 153 |
Odisha |
Cuttack |
Salepur |
Mutarifa |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM CUTTACK-CHANDABALI MAIN ROAD TO BAIDESWAR TEMPLE, MUTARIFA |
75 days |
| 154 |
Odisha |
Cuttack |
Salepur |
Naiguan |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM HRUSIKESH HOUSE TO SARAT HOUSE, WARD NO. 13, BALIA |
75 days |
| 155 |
Odisha |
Cuttack |
Salepur |
Nandol |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM BHATAPADA BEHERA SAHI SUKABHADRA BRIDGE 4 NO CANAL ROAD |
75 days |
| 156 |
Odisha |
Cuttack |
Salepur |
Narda |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM KRUSHNA CHANDRA MALLIK HOUSE TO GOVINDA MALLIK HOUSE |
75 days |
| 157 |
Odisha |
Cuttack |
Salepur |
Odasingh |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM RD ROAD TO PRADIPTA KUMAR NAYAK HOUSE, VILLAGE-TILDA |
75 days |
| 158 |
Odisha |
Cuttack |
Salepur |
Paschimakachha |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM KOCHILEI TEMPLE TO BANIA SAHI, WARD NO. 10 |
75 days |
| 159 |
Odisha |
Cuttack |
Salepur |
Pikol |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM AGI PADIA TO UPENDRA ROUT HOUSE, BANAHARA, WARD NO -12 |
75 days |
| 160 |
Odisha |
Cuttack |
Salepur |
Purunahat |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM NRUSINGH TEMPLE TO BAREI GADA, KALIKAPUR |
75 days |
| 161 |
Odisha |
Cuttack |
Salepur |
Raisunguda |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF KUSAMBI HARIJANA SAHI TO CANAL EMBAKMENT ROAD, KUSAMBI |
75 days |
| 162 |
Odisha |
Cuttack |
Salepur |
Ramakrushnapur |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM RD ROAD TO RAJASHREE JENA HOUSE, BALISAMALA |
75 days |
| 163 |
Odisha |
Cuttack |
Salepur |
Rameswar |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM AWC-1 TO AWC-2, BADABHIMRAJPUR |
75 days |
| 164 |
Odisha |
Cuttack |
Salepur |
Ratilo |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM SANJAYA SAHOO HOUSE TO PURNIMA BEHERA HOUSE, RATILO |
75 days |
| 165 |
Odisha |
Cuttack |
Salepur |
Satyabhamapur |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM GANESWAR TUKUNA PANI HOME TO ANANTA SETHY HOUSE |
75 days |
| 166 |
Odisha |
Cuttack |
Salepur |
Sidho |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM 5 NO. CANAL TO KALIDAHI MASANI, KALIDAHI |
75 days |
| 167 |
Odisha |
Cuttack |
Salepur |
Sisua |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM MUKTESWR TEMPLE TO GOLEKH DAS HOUSE, BAHABALAPUR |
75 days |
| 168 |
Odisha |
Cuttack |
Salepur |
Sauri |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM MOHANTY SAHI TO MAHARANA SAHI, GANGAPUR |
75 days |
| 169 |
Odisha |
Cuttack |
Salepur |
Sudhakhanda |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM NARAYAN MALLIK HOUSE TO SANATAN MALLIK HOUSE, SUDHAKHANDA |
75 days |
| 170 |
Odisha |
Cuttack |
Salepur |
Tarito |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM CANAL EMBANKMENT TO DOLA BEHERA HOUSE, MURKUNDI |
75 days |
| 171 |
Odisha |
Cuttack |
Salepur |
Tentol |
Parthasarathi Nayak |
Desk Officer |
MAINTENANCE AND IMPROVEMENT OF ROAD FROM BIKRAM SAMAL HOUSE TO KADAMBAMULA TALASAHI , PATAPUR |
75 days |
| 172 |
Odisha |
Cuttack |
Salepur |
Trilochanpur |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD FROM MAIN ROAD TO SWAPNESWAR TEMPLE, TRILOCHANPUR |
75 days |
| 173 |
Odisha |
Puri |
Nimapada |
Gadapadanpur |
Parthasarathi Nayak |
Desk Officer |
CONST OF CC ROAD FROM BISWANATH NAIK HOUSE TO BISWA MOHANTY HOUSE |
75 days |
| 174 |
Odisha |
Nuapada |
Komna |
Poinr |
Parthasarathi Nayak |
Desk Officer |
REPAIR AND MAINTENANCE OF ROAD AT POINR HARIJANPADA OF POINR GP |
67 days |
| 175 |
Odisha |
Nuapada |
Komna |
Tarbod |
Parthasarathi Nayak |
Desk Officer |
CONSTRUCTION OF CC ROAD FROM NH 353 TO NIALPADA OF GOHIRAPADAR OF TARBOD GP |
67 days |
| 176 |
Odisha |
Gajapati |
Rayagad |
Lailai |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road from RD Road to Jaga House at Bisampadu Village |
75 days |
| 177 |
Odisha |
Gajapati |
Rayagad |
Marlaba |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road from RD Road to Tumbasila of Marlaba GP |
75 days |
| 178 |
Odisha |
Gajapati |
Rayagad |
Gangabada |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road at new Pacchidia village at Gangabada |
75 days |
| 179 |
Odisha |
Gajapati |
Rayagad |
Koinpur |
Parthasarathi Nayak |
Desk Officer |
Improvement of CC Road at Taraba village at Koinpur |
75 days |
| 180 |
Odisha |
Gajapati |
Rayagad |
Dambala |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road at Ruising village at Dambalo GP |
75 days |
| 181 |
Odisha |
Gajapati |
Rayagad |
Talamunda |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road at Depasahi Abasing village |
75 days |
| 182 |
Odisha |
Gajapati |
Rayagad |
Sanatundi |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road at Badonja village |
75 days |
| 183 |
Odisha |
Gajapati |
Rayagad |
Rayagada |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road from Pillasmasan Ghat to Satapuria-Sunapur Village |
75 days |
| 184 |
Odisha |
Puri |
Pipili |
Kanti |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at Kanti Balimala Dalita sahi |
75 days |
| 185 |
Odisha |
Puri |
Pipili |
Laxminarayanpur |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at Magalpur Kalikasahi word no-19 |
75 days |
| 186 |
Odisha |
Puri |
Pipili |
Orkal |
Parthasarathi Nayak |
Desk Officer |
Const. of C.C Road From Matiapada to Talau Road Ward no-02 |
75 days |
| 187 |
Odisha |
Puri |
Pipili |
Panidol |
Parthasarathi Nayak |
Desk Officer |
Const. of Culvert on Anantapur Miner at Patajoshipur Village |
75 days |
| 188 |
Odisha |
Puri |
Pipili |
Bharatipur |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at Bageswarpur Badapokhari road |
75 days |
| 189 |
Odisha |
Puri |
Pipili |
Pamasara |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Belamara kaja Bridge to Belamara Village |
75 days |
| 190 |
Odisha |
Puri |
Pipili |
Poporanga |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Pachalapur Chabhagua to Gangua Nala |
75 days |
| 191 |
Odisha |
Puri |
Pipili |
Gobindapur |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from RD Road to Harianta Smasan |
75 days |
| 192 |
Odisha |
Puri |
Pipili |
Pubasasan |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road form Jaguliapada Baramana patana jogamaya temple to Benu sahoo house |
75 days |
| 193 |
Odisha |
Puri |
Pipili |
Dhandamakundapur |
Parthasarathi Nayak |
Desk Officer |
Const. of c.c road from Sankara Barik house to Rajatei RD Road |
75 days |
| 194 |
Odisha |
Puri |
Pipili |
Mangalpur |
Parthasarathi Nayak |
Desk Officer |
,Const.of CC Road From Mahadipasahi to Chakrabati Road |
75 days |
| 195 |
Odisha |
Puri |
Pipili |
Durgadaspur |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Pratap Sahu land to Pabitrapani house |
75 days |
| 196 |
Odisha |
Puri |
Pipili |
Jagannathpur |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Darada Bila sahi cc road to Kela Malick House |
75 days |
| 197 |
Odisha |
Puri |
Pipili |
Nuasasan |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Nuapatana RD Road to Nuasasan Ayusman Arogya mandira |
75 days |
| 198 |
Odisha |
Puri |
Pipili |
Hatasahi |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Ghasia Dalita sahi to Pipli Delang road |
75 days |
| 199 |
Odisha |
Puri |
Pipili |
Sampur |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at Bramhapur Nada sahi |
75 days |
| 200 |
Odisha |
Puri |
Pipili |
Kulasekharapatana |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at back side of Kansari sahi and Kharuda sahi ( Kulasekharpatana) |
75 days |
| 201 |
Odisha |
Puri |
Pipili |
Saraswatipur |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Sarbeswar Maharana house to Rabi Nayak house |
75 days |
| 202 |
Odisha |
Puri |
Pipili |
Sahajpur |
Parthasarathi Nayak |
Desk Officer |
Const. of Incomplete CC Road at Balunkeswar Mahadev Pitha Sahajpur |
75 days |
| 203 |
Odisha |
Puri |
Pipili |
Rathapurusottampur |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road at Bahabalapur village |
75 days |
| 204 |
Odisha |
Puri |
Pipili |
Birapurusotampur |
Parthasarathi Nayak |
Desk Officer |
Const.of Purohitpur Mahanty sahi CC Road |
75 days |
| 205 |
Odisha |
Puri |
Pipili |
Chandradeipur |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Derik PMGSY road to Balunki Behera house |
75 days |
| 206 |
Odisha |
Puri |
Pipili |
Teisipur |
Parthasarathi Nayak |
Desk Officer |
Const. of CC Road at Alisha Billa Pradhan sahi |
75 days |
| 207 |
Odisha |
Puri |
Pipili |
Jasuapur |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Jasuapur to padasahi near Khetramohan pokhari |
75 days |
| 208 |
Odisha |
Puri |
Pipili |
Rulpadeipur |
Parthasarathi Nayak |
Desk Officer |
Const. of cc road from Chatua behera house to Ganda sahi |
75 days |
| 209 |
Odisha |
Gajapati |
Nuagada |
Tabarada |
Parthasarathi Nayak |
Desk Officer |
Improvement of new road with ghat cutting from U.Ketungpada to Janapada |
75 days |
| 210 |
Odisha |
Gajapati |
Nuagada |
Nuagada |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from Nuagada to Sihanagada |
75 days |
| 211 |
Odisha |
Gajapati |
Nuagada |
Nuagada |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from RD road to Manikeswari sahi |
75 days |
| 212 |
Odisha |
Gajapati |
Nuagada |
Putrupada |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from PWD road to Tarabha |
75 days |
| 213 |
Odisha |
Gajapati |
Nuagada |
Paika Antarada |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from RD road to Jaga sahi Govindpur |
75 days |
| 214 |
Odisha |
Gajapati |
Nuagada |
Parimala |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from Bagharampa to Panasapadar |
75 days |
| 215 |
Odisha |
Gajapati |
Nuagada |
Betarsingi |
Parthasarathi Nayak |
Desk Officer |
Improvement of new road with ghat cutting from Pottu to Salankoi |
75 days |
| 216 |
Odisha |
Gajapati |
Nuagada |
Betarsingi |
Parthasarathi Nayak |
Desk Officer |
Construction of culvert near chata amba,Kankada |
75 days |
| 217 |
Odisha |
Gajapati |
Nuagada |
Tabarada |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from RD road to U.Lenge Saura sahi |
75 days |
| 218 |
Odisha |
Gajapati |
Nuagada |
Tangili |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from RD road to Kurkur chaka |
75 days |
| 219 |
Odisha |
Balasore |
Simulia |
Ada |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Arupa sahu House to Ananta Mohanty house |
75 days |
| 220 |
Odisha |
Balasore |
Simulia |
Abjhuna |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from parbatipur RD road to Dillip Barik house |
75 days |
| 221 |
Odisha |
Balasore |
Simulia |
Andarai |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from rasuna chhak to kapali behera sashan road |
75 days |
| 222 |
Odisha |
Balasore |
Simulia |
Anandapur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from RD road to kuli pada |
75 days |
| 223 |
Odisha |
Balasore |
Simulia |
Bangarkhandigadia |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Bana Sabanga RD road to PWD B.Khadigadia road via Barik sahi. |
75 days |
| 224 |
Odisha |
Balasore |
Simulia |
Bangalpur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Bhagia school to Debnath sahi |
75 days |
| 225 |
Odisha |
Balasore |
Simulia |
Bari |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Begarajpur shakuru house to mir sadam house. |
75 days |
| 226 |
Odisha |
Balasore |
Simulia |
Bati |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Bati Sahasan to Astia |
75 days |
| 227 |
Odisha |
Balasore |
Simulia |
Bauripada |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from main road to ekadashi barik house balihanti. |
75 days |
| 228 |
Odisha |
Balasore |
Simulia |
Chalunigan |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Babaji Biswal house to Umakanta Biswal house house Baisnibati |
75 days |
| 229 |
Odisha |
Balasore |
Simulia |
Iswarpur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Nrushina das house to jena sahi |
75 days |
| 230 |
Odisha |
Balasore |
Simulia |
Jamujhadi |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Laxman patra house to Banka pala house |
75 days |
| 231 |
Odisha |
Balasore |
Simulia |
Kirkona |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at khirkona Malik sahi road |
75 days |
| 232 |
Odisha |
Balasore |
Simulia |
Maitapur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from PMGSY road to Gajendra muduli house |
75 days |
| 233 |
Odisha |
Balasore |
Simulia |
Maitapur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from PMGSY road to Kamalakanta Behera house |
75 days |
| 234 |
Odisha |
Balasore |
Simulia |
Markona |
Parthasarathi Nayak |
Desk Officer |
Construction of Road and Guardwall near Amar pattnayak house |
75 days |
| 235 |
Odisha |
Balasore |
Simulia |
Muruna |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Market kulibasa to Baikuntha sahu land |
75 days |
| 236 |
Odisha |
Balasore |
Simulia |
Purosottampur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from agana sahu house to Mayadhar Mishra house |
75 days |
| 237 |
Odisha |
Balasore |
Simulia |
Pahitorana |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from pratappur Manmath Barik house to Mangala Thakurani |
75 days |
| 238 |
Odisha |
Balasore |
Simulia |
Pahitorana |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Khetra palta house to sana palta house |
75 days |
| 239 |
Odisha |
Balasore |
Simulia |
Pahitorana |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from pravakar house to sethi sahi |
75 days |
| 240 |
Odisha |
Balasore |
Simulia |
Sabanga |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Biswanath house to Tapan Das house |
75 days |
| 241 |
Odisha |
Balasore |
Simulia |
Samasundarpur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at baula gadia village road |
75 days |
| 242 |
Odisha |
Balasore |
Simulia |
Kanheibandha |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at Tirukha panda sahi road |
75 days |
| 243 |
Odisha |
Balasore |
Simulia |
Kanheibandha |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from dadhibaman pur Teli sahi to Jena Sahi |
75 days |
| 244 |
Odisha |
Gajapati |
R.Udayagiri |
R.Udayagiri |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from Duinala Siva Mandir to Saralasahi R.Udayagiri |
75 days |
| 245 |
Odisha |
Gajapati |
R.Udayagiri |
Mangarajpur |
Parthasarathi Nayak |
Desk Officer |
Improvement of road at Balidi-B |
75 days |
| 246 |
Odisha |
Gajapati |
R.Udayagiri |
Chellagada |
Parthasarathi Nayak |
Desk Officer |
Improvement of road at Ghatisahi |
75 days |
| 247 |
Odisha |
Gajapati |
R.Udayagiri |
Mahendragada |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from Kusapalli to R.Nuasahi bridge |
75 days |
| 248 |
Odisha |
Gajapati |
R.Udayagiri |
Sialilati |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from Jadapani Chhaka to Jada |
75 days |
| 249 |
Odisha |
Gajapati |
R.Udayagiri |
Purunapani |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from Jada to Rubel |
75 days |
| 250 |
Odisha |
Gajapati |
R.Udayagiri |
Sialilati |
Parthasarathi Nayak |
Desk Officer |
Improvement of road at Mandalasahi |
75 days |
| 251 |
Odisha |
Gajapati |
R.Udayagiri |
Bastariguda |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from RD road to A-Anjeikona |
75 days |
| 252 |
Odisha |
Gajapati |
R.Udayagiri |
Purunapani |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from RD road to Munigadiha |
75 days |
| 253 |
Odisha |
Gajapati |
Gosani |
Bomika |
Parthasarathi Nayak |
Desk Officer |
Construction of Paver Block road from bomika to batisiripur Dam |
75 days |
| 254 |
Odisha |
Gajapati |
Gosani |
Badagosani |
Parthasarathi Nayak |
Desk Officer |
Construction of incomplete road with drain at kondi street at kaithada village |
75 days |
| 255 |
Odisha |
Gajapati |
Gosani |
Rampa |
Parthasarathi Nayak |
Desk Officer |
Construction of road at samasan Ghat of Rampa village |
75 days |
| 256 |
Odisha |
Gajapati |
Gosani |
Kerandi |
Parthasarathi Nayak |
Desk Officer |
Construction of paver block road near sankar garage lane |
75 days |
| 257 |
Odisha |
Gajapati |
Gosani |
Kerandi |
Parthasarathi Nayak |
Desk Officer |
Construction of paver block road from durga dora house to santosh parichha house lane-E |
75 days |
| 258 |
Odisha |
Gajapati |
Gosani |
Uppalada. |
Parthasarathi Nayak |
Desk Officer |
Construction of Paver Block road from Kampa street to Soura street Via-Harijana street at Patikota |
75 days |
| 259 |
Odisha |
Gajapati |
Gosani |
Kharasandha |
Parthasarathi Nayak |
Desk Officer |
Construction of paver block road at harijana sahi at Kharsanada village |
75 days |
| 260 |
Odisha |
Gajapati |
Gosani |
Sobara . |
Parthasarathi Nayak |
Desk Officer |
Construction of paver block road from PWD road to sobara village |
75 days |
| 261 |
Odisha |
Gajapati |
Gosani |
Labanyagada |
Parthasarathi Nayak |
Desk Officer |
Construction of paver block road at dalapati street at Labanyagada |
75 days |
| 262 |
Odisha |
Gajapati |
Gosani |
Badagosani |
Parthasarathi Nayak |
Desk Officer |
Construction of paver block road at smasan ghat at utterseli |
75 days |
| 263 |
Odisha |
Gajapati |
Gosani |
Machamara |
Parthasarathi Nayak |
Desk Officer |
Construction of paver block road from raja house to bobli pollama |
75 days |
| 264 |
Odisha |
Gajapati |
Gosani |
Ghorani |
Parthasarathi Nayak |
Desk Officer |
Improvement of paver block road from RD road to ratansing village |
75 days |
| 265 |
Odisha |
Cuttack |
Tangi Choudwar |
Karanji |
Parthasarathi Nayak |
Desk Officer |
Const. CC road from House to Khageswar Mahanta house, Kankali Village |
75 days |
| 266 |
Odisha |
Cuttack |
Tangi Choudwar |
Safa |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Patpur Tarini Mandir to Village Road, Patpur |
75 days |
| 267 |
Odisha |
Cuttack |
Tangi Choudwar |
Garudagaon |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from RD road to Mahendra Dehury house, Tulasipur |
75 days |
| 268 |
Odisha |
Cuttack |
Tangi Choudwar |
Salagaon |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from RD road to Kaudia Pada Village |
75 days |
| 269 |
Odisha |
Cuttack |
Tangi Choudwar |
Kanheipur |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Patharakata Harijan Sahi to Babula Mallick house, Goudasahi |
75 days |
| 270 |
Odisha |
Cuttack |
Tangi Choudwar |
Uchapada |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Sarat Sahoo house to Nua Pokhari, Khetrapal |
75 days |
| 271 |
Odisha |
Cuttack |
Tangi Choudwar |
Magura Dhanmandal |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Nayak house Canal bandha to Kangali Anchal house |
75 days |
| 272 |
Odisha |
Cuttack |
Tangi Choudwar |
Jaripada |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Chitta Ranjan Swain house to Basanta Roul house, Kani |
75 days |
| 273 |
Odisha |
Cuttack |
Tangi Choudwar |
Bhatimunda |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Bada Sahi Canal Bandha road to Balikuntha Mallick house |
75 days |
| 274 |
Odisha |
Cuttack |
Tangi Choudwar |
Harianta |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Dhira Swain house to Oaru Swain house, Bilteruan |
75 days |
| 275 |
Odisha |
Cuttack |
Tangi Choudwar |
Napanga |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Mallick house to Jagulai Thakurani, Mallick Sahi Birol |
75 days |
| 276 |
Odisha |
Cuttack |
Tangi Choudwar |
Kotasahi |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Road Culvert to Bania Sahi Medha Ghara, Ramagarh |
75 days |
| 277 |
Odisha |
Cuttack |
Tangi Choudwar |
Banipada |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Changudia Main road to Surendra Rout res. At Changudia |
75 days |
| 278 |
Odisha |
Cuttack |
Tangi Choudwar |
Kayalpada |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Sadananda Nayak res. To Krushna Ghadai res. At Kayalapada |
75 days |
| 279 |
Odisha |
Cuttack |
Tangi Choudwar |
Badasamantarapur |
Parthasarathi Nayak |
Desk Officer |
Const. of road from Badapadagaon Bichitrananda Rout house to Budhi Thakurani temple |
75 days |
| 280 |
Odisha |
Cuttack |
Tangi Choudwar |
Sankarpur |
Parthasarathi Nayak |
Desk Officer |
Const. of road from Charbatia Mangarajpur PWD road to Majhisahi Smasan road |
75 days |
| 281 |
Odisha |
Cuttack |
Tangi Choudwar |
Mangarajpur |
Parthasarathi Nayak |
Desk Officer |
Const. of road from Mangarajpur village Pravat Sethy house to Smasan |
75 days |
| 282 |
Odisha |
Cuttack |
Tangi Choudwar |
Mahisalanda |
Parthasarathi Nayak |
Desk Officer |
Const. of road from Kalyan Mandap to Tubi Pokhari road, Mahisalanda Vill. |
75 days |
| 283 |
Odisha |
Cuttack |
Tangi Choudwar |
Bramhapur |
Parthasarathi Nayak |
Desk Officer |
Const. of road from Berhampur village Nutan Sahoo house to Kanthia Swain house road |
75 days |
| 284 |
Odisha |
Cuttack |
Tangi Choudwar |
Kakhadi |
Parthasarathi Nayak |
Desk Officer |
Const. of road from Bidyadharpur village Basuli temple road |
75 days |
| 285 |
Odisha |
Cuttack |
Tangi Choudwar |
Nakhara |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road & side wall from Gobinda Swain house to Naba Swain house |
75 days |
| 286 |
Odisha |
Cuttack |
Tangi Choudwar |
Govindapur |
Parthasarathi Nayak |
Desk Officer |
Const. of CC road from Road to Mani Dalal house and Mangala Mandir, Gokulpur |
75 days |
| 287 |
Odisha |
Gajapati |
Mohona |
Adava |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road at Adava Christian Sahi Burungi |
75 days |
| 288 |
Odisha |
Gajapati |
Kasinagar |
Khandava |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from Nadighat to Shiv Temple |
75 days |
| 289 |
Odisha |
Gajapati |
Kasinagar |
Ranipeta |
Parthasarathi Nayak |
Desk Officer |
Improvement of road at Ranipeta (Back Side surya Techno) |
75 days |
| 290 |
Odisha |
Gajapati |
Kasinagar |
Kharada |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from Mandalasahi pump Nala Village |
75 days |
| 291 |
Odisha |
Gajapati |
Kasinagar |
Allada |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from Gandhi Nagar Village |
75 days |
| 292 |
Odisha |
Gajapati |
Kasinagar |
Goribandha |
Parthasarathi Nayak |
Desk Officer |
Improvement of road at B L Pur Colony |
75 days |
| 293 |
Odisha |
Gajapati |
Kasinagar |
Budura |
Parthasarathi Nayak |
Desk Officer |
Improvement of road from Chandrayakara Gorge |
75 days |
| 294 |
Odisha |
Gajapati |
Kasinagar |
K.Sitapur |
Parthasarathi Nayak |
Desk Officer |
Improvement of road at Bhimaraj street at K Sitapur village |
75 days |
| 295 |
Odisha |
Gajapati |
Kasinagar |
Kidigam |
Parthasarathi Nayak |
Desk Officer |
Improvement of road at Kortam |
75 days |
| 296 |
Odisha |
Gajapati |
Kasinagar |
Siali |
Parthasarathi Nayak |
Desk Officer |
Improvement of road at Seetanapeta |
75 days |
| 297 |
Odisha |
Gajapati |
Kasinagar |
Hadubhangi |
Parthasarathi Nayak |
Desk Officer |
Improvement of road at Mudistreet at Bishala |
75 days |
| 298 |
Odisha |
Gajapati |
Kasinagar |
Parthada |
Parthasarathi Nayak |
Desk Officer |
Improvement of road at Tala Raimba |
75 days |
| 299 |
Odisha |
Gajapati |
Kasinagar |
Sidhamadanga |
Parthasarathi Nayak |
Desk Officer |
Repair and maintenance of the road at Thakurani temple new Street Nilakanthapur |
75 days |
| 300 |
Odisha |
Gajapati |
Mohona |
Antaraba |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at Galama |
75 days |
| 301 |
Odisha |
Gajapati |
Mohona |
Badakhani |
Parthasarathi Nayak |
Desk Officer |
Construction of road from PWD road to Badakhani |
75 days |
| 302 |
Odisha |
Gajapati |
Mohona |
Badeguda |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at Paderma village |
75 days |
| 303 |
Odisha |
Gajapati |
Mohona |
Baghamari |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from Buduni gaon to Chahala |
75 days |
| 304 |
Odisha |
Gajapati |
Mohona |
Karachabadi |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road from Palli Gajapati |
75 days |
| 305 |
Odisha |
Gajapati |
Mohona |
Chudangapur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at Gunjjima village |
75 days |
| 306 |
Odisha |
Gajapati |
Mohona |
Damadua |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road at Kolaba |
75 days |
| 307 |
Odisha |
Gajapati |
Mohona |
Dambaguda |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at Nilidika Village |
75 days |
| 308 |
Odisha |
Gajapati |
Mohona |
Dengaskhal |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at Raijuka school to Dengaskhal GP |
75 days |
| 309 |
Odisha |
Gajapati |
Mohona |
Garadama |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from RD Road to High school |
75 days |
| 310 |
Odisha |
Gajapati |
Mohona |
Guluba |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from school to Rumesh Village |
75 days |
| 311 |
Odisha |
Gajapati |
Mohona |
Jarrow |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from school to Juba village |
75 days |
| 312 |
Odisha |
Gajapati |
Mohona |
Kesariguda |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from RD Road to Keshariguda UP School |
75 days |
| 313 |
Odisha |
Gajapati |
Mohona |
Khariguda |
Parthasarathi Nayak |
Desk Officer |
Improvement of Road at Arumpeta |
75 days |
| 314 |
Odisha |
Gajapati |
Mohona |
Liliguda |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road at Kamiliguda Village |
75 days |
| 315 |
Odisha |
Gajapati |
Mohona |
Malasapadar |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at Mahulapada village |
75 days |
| 316 |
Odisha |
Gajapati |
Mohona |
Merapalli |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road at Merama Village |
75 days |
| 317 |
Odisha |
Gajapati |
Mohona |
Paniganda |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at Harijana Sahi at Toranipani Village |
75 days |
| 318 |
Odisha |
Gajapati |
Mohona |
Raipanka |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road at Rajpur Sahi at Raipanka |
75 days |
| 319 |
Odisha |
Gajapati |
Mohona |
Sikulipadara |
Parthasarathi Nayak |
Desk Officer |
Construction of CC Road from PWD Road to Harijana sahi at Manikpur |
75 days |
| 320 |
Odisha |
Gajapati |
Mohona |
Birikote |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road near Sarabano Sahi |
75 days |
| 321 |
Odisha |
Gajapati |
Mohona |
Manikapur |
Parthasarathi Nayak |
Desk Officer |
Construction of CC road from PWD road to Harijan Sahi at manikapur |
75 days |