Pre Approve Project Pending Days

Total Projects : 294

Sl. No. State District Block panchayat User Name Designation Name of the Project No. of Days Pending
1 Odisha Malkangiri Korukonda Kamwada Viplab Kumar Nayak Desk Officer Construction of RCC slab culvert from Kamwada Tala Sahi to MV-49 canal 205 days
2 Odisha Malkangiri Korukonda Dudametta Viplab Kumar Nayak Desk Officer Construction of RCC slab culvert from Koyaguda to Palmeta main canal 205 days
3 Odisha Sambalpur Dhankauda Kankhinda Viplab Kumar Nayak Desk Officer Maintenance of Road from Bisipali village Road to Maharupada 120 days
4 Odisha Sambalpur Dhankauda Kilasama Viplab Kumar Nayak Desk Officer Maintenance of Road from Padhanpali Harijanpada to Talipada 120 days
5 Odisha Sambalpur Dhankauda Kudgunderpur Viplab Kumar Nayak Desk Officer Maintenance of Road from Dilip Pahdee House to Hanuman Mandir,Kud-Gunderpur 120 days
6 Odisha Sambalpur Dhankauda Sason Viplab Kumar Nayak Desk Officer Maintenance of Road at Chhatargada 120 days
7 Odisha Sambalpur Dhankauda Kankhinda Viplab Kumar Nayak Desk Officer Maintenance of Road at Munda Pipalpada Kankhinda 120 days
8 Odisha Khordha Balianta Kakaruidrapur Viplab Kumar Nayak Desk Officer CONSTRUCTION OF CC ROAD AT PANCHALO 83 days
9 Odisha Khordha Balianta Bentapur Viplab Kumar Nayak Desk Officer CONSTRUCTION OF CC ROAD FROM BAISNAB SAHI TO MALLICK SAHI, W-1 83 days
10 Odisha Khordha Balianta Jhinti Sasan Viplab Kumar Nayak Desk Officer MAINTENANCE OF CC ROAD FROM MAHIMAGADI TO BAPINA GOCHAYAT HOUSE 83 days
11 Odisha Khordha Balianta Prataprudrapur Viplab Kumar Nayak Desk Officer CONSTRUCTION OF CC ROAD FROM BETANDA TO BALUNKESWARI PATAMAHADEV PITHA 83 days
12 Odisha Khordha Balianta Balianta Viplab Kumar Nayak Desk Officer CONSTRUCTION OF CC ROAD FROM ATALA SMASAN ROAD, W-18 83 days
13 Odisha Khordha Balianta Bhingarapur Viplab Kumar Nayak Desk Officer CONSTRUCTION OF DARA CHOUKA SMASAN ROAD, W-11 83 days
14 Odisha Khordha Begunia Deuli Viplab Kumar Nayak Desk Officer Construction of CC Road from Rohita muduli house to UP school via Dalak 83 days
15 Odisha Khordha Begunia Rasdhakantapur Viplab Kumar Nayak Desk Officer Construction ofCC Road from Dhangharnuagaon Khanibaghei temple to Banambar khatei house 83 days
16 Odisha Khordha Begunia Haja Viplab Kumar Nayak Desk Officer Construction of paikasahi CC Road 83 days
17 Odisha Khordha Begunia Siko Viplab Kumar Nayak Desk Officer Construction of CC Road from New Jagannath road to Belapada reading room 83 days
18 Odisha Khordha Begunia Govuindapur Viplab Kumar Nayak Desk Officer Construction of CC Road near Ratna mandap vill-Bramhapura 83 days
19 Odisha Khordha Begunia Hirapur Viplab Kumar Nayak Desk Officer Construction of CC Road in GP Office premises, Hirapur 83 days
20 Odisha Khordha Begunia Botalama Viplab Kumar Nayak Desk Officer Construction of CC Road near Kapileswar temple premises, Badabarabati 83 days
21 Odisha Khordha Begunia Rautapada Viplab Kumar Nayak Desk Officer Construction of CC Road from new masjid to pradhan mantri sadak via Harijan sahi 83 days
22 Odisha Khordha Begunia Dingara Viplab Kumar Nayak Desk Officer Construction of CC Road from Dahala devi kupa to Smasana CC Road 83 days
23 Odisha Khordha Begunia Baghamari Viplab Kumar Nayak Desk Officer Construction of CC Road from RI office to Raghunathdev High School back side 83 days
24 Odisha Khordha Begunia Badaberana Viplab Kumar Nayak Desk Officer Construction of CC Road from Kalika Mandira to Akhadabara vill Gobindapur 83 days
25 Odisha Nuapada Boden Sunapur Viplab Kumar Nayak Desk Officer Repair & maintaince of Road at Sahajmal to Padampur 68 days
26 Odisha Nuapada Boden Rokal Viplab Kumar Nayak Desk Officer Construction of Culvert at Khirmal Debandha Road 68 days
27 Odisha Nuapada Boden Palsada Viplab Kumar Nayak Desk Officer Construction of Culvert at Palsada Juna Road 68 days
28 Odisha Nuapada Boden Damjhar Viplab Kumar Nayak Desk Officer Construction of CC Road at Mandobirli Jayaram Gali 68 days
29 Odisha Nuapada Boden Boirgaon Viplab Kumar Nayak Desk Officer Construction of CC Road at Khadupani Salepada Chandrabhanu Majhi Gaili 68 days
30 Odisha Khordha Balipatna Pampalo Viplab Kumar Nayak Desk Officer Construction of CC road from Chanahata Aitalanga RD road on the Right side bank of Ankuspur canal to Sarat Jagir Telisahi near Krushna Sahoo House.w- 83 days
31 Odisha Khordha Balipatna Bhakarasahi Viplab Kumar Nayak Desk Officer Construction of CC Road from Kushavadra Nadi Bandha to GBC canal Bridge at Naranpur of Ward No: 2 83 days
32 Odisha Khordha Balipatna Guapur Viplab Kumar Nayak Desk Officer Repair & Maintenance of Guapur Dasarathi Mallick Hose to Kailash Mallick House, w- 04 83 days
33 Odisha Khordha Balipatna Bhapur Viplab Kumar Nayak Desk Officer Improvement of Road from GBC Canal to Badadihapatna School 83 days
34 Odisha Khordha Chilika Badakula Viplab Kumar Nayak Desk Officer Improvement of road from Rameswar Temple to NH-16. 83 days
35 Odisha Khordha Chilika Biribadi Viplab Kumar Nayak Desk Officer Improvement of road near Jagannath Temple, Kaithapalla. 83 days
36 Odisha Khordha Chilika Haripur Viplab Kumar Nayak Desk Officer Improvement of road from Tuku Samantaray house to Sangram Sahoo House. 83 days
37 Odisha Khordha Chilika Sananasiri Viplab Kumar Nayak Desk Officer Improvement of road from Sudhir Sahoo house to Trinath Palei farm at Badanairi. 83 days
38 Odisha Khordha Khordha Pallatotapada Viplab Kumar Nayak Desk Officer Improvement/repair & Maintenance of road nuapokhari huda 83 days
39 Odisha Khordha Khordha Orabarasingh Viplab Kumar Nayak Desk Officer Improvement/repair & Maintenance of road from Gula singh house to primary School 83 days
40 Odisha Khordha Khordha Golabaisasana Viplab Kumar Nayak Desk Officer Improvement/repair & Maintenance of road golabai society back side of ramesh pradhan house 83 days
41 Odisha Khordha Khordha Bajapur Viplab Kumar Nayak Desk Officer Improvement/repair & Maintenance of road from baniatangi UP ME School to Nilakantheswar Temple 83 days
42 Odisha Khordha Khordha Jankia Viplab Kumar Nayak Desk Officer Improvement/repair & Maintenance of road from Tapan barik house to Gudia Chua word No 11 83 days
43 Odisha Khordha Khordha Brajamohanpur Viplab Kumar Nayak Desk Officer Improvement/repair & Maintenance of road form RD road to Behera Sahi 83 days
44 Odisha Khordha Khordha Kaipadara Viplab Kumar Nayak Desk Officer Improvement/repair & Maintenance of road form pala mandap to shiv temple 83 days
45 Odisha Khordha Khordha Kaipadara Viplab Kumar Nayak Desk Officer Improvement/repair & Maintenance of road from Dalei Sahi Champati Sahi Artikia dia to smashan 83 days
46 Odisha Nuapada Sinapali Kusumjore Viplab Kumar Nayak Desk Officer Repair & maintenance of Kasaipani Gahatiapada 68 days
47 Odisha Nuapada Sinapali Singjhar Viplab Kumar Nayak Desk Officer Construction of CC Road of Gudimaa Gudi to Main Road at Pendren 68 days
48 Odisha Nuapada Sinapali Kharsel Viplab Kumar Nayak Desk Officer Const. of CC. Road at Kharsel Kolonipada at Kharsel 68 days
49 Odisha Nuapada Sinapali Ghatmal Viplab Kumar Nayak Desk Officer Construction of CC Road at Gadhiajore Basti at Gadhiajore 68 days
50 Odisha Nuapada Sinapali Sinapali Viplab Kumar Nayak Desk Officer Construction of CC Road from Sinapali college centeen road to Katapada road at Sardhapur 68 days
51 Odisha Nuapada Sinapali Nangalbod Viplab Kumar Nayak Desk Officer Impv. Of Road from Main Road to Tankamal basti 68 days
52 Odisha Nuapada Sinapali Sinapali Viplab Kumar Nayak Desk Officer Impv. Of Road from Samanta Dash house to Biju expressway at Kapsi 68 days
53 Odisha Nuapada Sinapali Kaintapadar Viplab Kumar Nayak Desk Officer Construction of CC Road at Haldimunda Naik Pada to Bedi Chouk road 68 days
54 Odisha Khordha Bhubaneswar Basuaghai Viplab Kumar Nayak Desk Officer IMPROVEMENT/REAPAIR & MAINTENANCE OF ROAD FROM DEBAJOTI PATTNAIK HOUSE TO SOUTH SIDE, SUSHANTIBIHAR 83 days
55 Odisha Khordha Bhubaneswar Itipur Viplab Kumar Nayak Desk Officer IMPROVEMENT/REPAIR & MAINTENANCE OF ROAD FROM PANCHAYAT ROAD TO KESHAB SWAIN HOUSE AT NISTARINIPUR 83 days
56 Odisha Khordha Bhubaneswar Itipur Viplab Kumar Nayak Desk Officer IMPROVEMENT/REPAIR & MAINTENANCE OF ROAD FROM CANAL BANDHA TO KARTIK SWAIN HOUSE, KUKUDAGHAIPATNA 83 days
57 Odisha Khordha Bhubaneswar Ranasinghpur Viplab Kumar Nayak Desk Officer IMPROVEMENT/REPAIR & MAINTENANCE OF ROAD FROM BHUBAN APARTMENT CHHAKA TO HANUMAN TEMPLE 83 days
58 Odisha Khordha Bhubaneswar Sisupalagarh Viplab Kumar Nayak Desk Officer IMPROVEMENT/REPAIR & MAINTENANCE OF PANDA SAHI ROAD 83 days
59 Odisha Khordha Bhubaneswar Malipada Viplab Kumar Nayak Desk Officer IMPROVEMENT/REPAIR & MAINTENANCE OF ROAD FROM GOTHAPATNA MAIN ROAD TO MANTRA APARTMENT 83 days
60 Odisha Khordha Bhubaneswar Daruthenga Viplab Kumar Nayak Desk Officer IMPROVEMENT/REPAIR & MAINTENANCE OF XAVIER SCHOOL TO GADASAHI ROAD 83 days
61 Odisha Khordha Bhubaneswar Tikarapada Viplab Kumar Nayak Desk Officer IMPROVEMENT/REPAIR & MAINTENANCE OF ROAD FROM PRAKASH HOUSE TO THAKURANI TEMPLE NUASAHI AT KALYANPURSASAN 83 days
62 Odisha Khordha Bhubaneswar Itipur Viplab Kumar Nayak Desk Officer IMPROVEMENT/REPAIR & MAINTENANCE OF ROAD FROM BASU BARAL HOUSE TO ASHRAM AT DIHAPUR 83 days
63 Odisha Khordha Bhubaneswar Sisupalagarh Viplab Kumar Nayak Desk Officer IMPROVEMENT/REPAIR & MAINTENANCE OF MANGALA BHOISAHI CC ROAD 83 days
64 Odisha Balasore Baliapal Madhupura Viplab Kumar Nayak Desk Officer Repair and maintenance of Road and bridge from Majhisahi Bhagabat Tungi to Solasa Pantha. 120 days
65 Odisha Balasore Baliapal Srirampur Viplab Kumar Nayak Desk Officer Repair and maintenance of Road from Adibasi Sahi Chhera Soren house chhak to Mainsamunda Shmasan Chhak at Mainsamunda. 120 days
66 Odisha Balasore Baliapal Balikuti Viplab Kumar Nayak Desk Officer Repair and maintenance of Road from Raghunath Rout house to Amulya Biswal house at Baitingiri 120 days
67 Odisha Balasore Baliapal Dagara Viplab Kumar Nayak Desk Officer Repair and maintenance of Road from Prafulla Patra house to Sea-Shore. 120 days
68 Odisha Balasore Baliapal Bishnupur Viplab Kumar Nayak Desk Officer Repair and maintenance of Road from Ikarpal Siva mandir to Ikarpal Substation Chhak 120 days
69 Odisha Balasore Baliapal Jagatipur Viplab Kumar Nayak Desk Officer Repair and maintenance of Road from PWD road to Kalicharan Parmanik house at village Ranikhudi 120 days
70 Odisha Balasore Baliapal Kunduli Viplab Kumar Nayak Desk Officer Repair and maintenance of Road from Sunadiha Chhak to Sunadiha bridge at village Indipada 120 days
71 Odisha Balasore Baliapal Nuagan Viplab Kumar Nayak Desk Officer Repair and maintenance of Road from Katara Mahal tungi chhak to Ramchandra Giri chhak at village Katara Mahal 120 days
72 Odisha Balasore Baliapal Aladiha Viplab Kumar Nayak Desk Officer Repair and maintenance of Road from Sai Jiban Mohanty house to Khagendra Biswal house at village Anladiha 120 days
73 Odisha Balasore Baliapal Bahiapal Viplab Kumar Nayak Desk Officer Repair and maintenance of Road from Bright Computer Institution to Bansidhar Jena house at village Kachuapada 120 days
74 Odisha Balasore Baliapal Pratappur Viplab Kumar Nayak Desk Officer Repair and maintenance of Road from Purushottam Barik house to Niasi Charan Rout house at village Pratappur ward no-9 120 days
75 Odisha Khordha Jatni Benapanjari Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM SAHA AJIN ALI HOUSE TO MD NABIN HOUSE, BENAPANJARI 83 days
76 Odisha Khordha Jatni Benapanjari Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM BHASKARA CHAMPATI HOUSE TO RAJIDI PATTANAIK HOUSE , BENAPANJARI 83 days
77 Odisha Khordha Jatni Gangapada Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM SINGHA SAHI BHAGABAT HOUSE TO KELU PRADHAN HOUSE, GANGAPADA 83 days
78 Odisha Khordha Jatni Angarapada Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM MAHAVIR TEMPLE TO GOURANGA SAHOO HOUSE , PALASPUR, ANGARAPADA 83 days
79 Odisha Khordha Jatni Chhatabara Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM GANGA SAHOO HOUSE TO BIBI NAYAK HOUSE , DURGAPUR , CHHATABAR 83 days
80 Odisha Khordha Jatni Taraboi Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM HARIDAMADA SCHOOL TO MAKRAMALI HOUSE , HARIDAMADA, TARABOI 83 days
81 Odisha Nuapada Khariar Tukla Viplab Kumar Nayak Desk Officer Improvement of Road from Rengtapada to Sannandi Bridge 68 days
82 Odisha Nuapada Khariar Sanmaheswar Viplab Kumar Nayak Desk Officer Improvement of Road from Sanmaheswar Colonypada via Shyama Sabar House 68 days
83 Odisha Nuapada Khariar Nehena Viplab Kumar Nayak Desk Officer Construction of CC Road at Nehena Khamaripada 68 days
84 Odisha Nuapada Khariar Lanji Viplab Kumar Nayak Desk Officer Construction of CC Road from Mainroad to Dambaru Harijan Pada Gali 68 days
85 Odisha Nuapada Khariar Kendupati Viplab Kumar Nayak Desk Officer Construction of CC Road at Banchhorpada (Khaliamunda) 68 days
86 Odisha Khordha Bolagarh Khanguria Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF RD ROAD TO MUKTAR KHAN HOUSE ROAD 83 days
87 Odisha Khordha Bolagarh Khanguria Viplab Kumar Nayak Desk Officer HARIPUR TO HARIPUR SMASAN ROAD 83 days
88 Odisha Khordha Bolagarh Gediapalli Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF P.W.D. ROAD TO BRAMHANI DEVI TEMPLE ROAD, SALATARA 83 days
89 Odisha Khordha Bolagarh Mnibandha Viplab Kumar Nayak Desk Officer CONST. OF CULVET AT MANIBANDHA TO BADAPADAR NALA 83 days
90 Odisha Khordha Bolagarh Daleisahi Viplab Kumar Nayak Desk Officer CONST. OF CC ROAD FROM DEBRAJ FARM TO ( WARD NO-18 ) SONA NAI AT DALEISAHI GP 83 days
91 Odisha Khordha Bolagarh Khanguria Viplab Kumar Nayak Desk Officer RAMA MANDIR CAMPUS CC ROAD (JODAPADA) 83 days
92 Odisha Khordha Bolagarh Fasioda Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF KELA PARIDA HOUSE TO MANGALA TEMPLE ROAD, MANDALSINGH 83 days
93 Odisha Nuapada Komna Darlipada Viplab Kumar Nayak Desk Officer CONSTRUCTION OF GUARD WALL WITH CULVERT AT DUMERPANI AWC TO GADIPUJAGUDI OF DARLIPADA GP 68 days
94 Odisha Nuapada Komna Silva Viplab Kumar Nayak Desk Officer CONSTRUCTION OF 2 NOS OF CULVERT FROM CHHUTIGUDI TO MURGAFIELD ROAD SILVA GP 68 days
95 Odisha Nuapada Komna Thagapali Viplab Kumar Nayak Desk Officer CONSTRUCTION OF CULVERT FROM BABUPALI BASTI TOWARDS VSS BUILDING 68 days
96 Odisha Nuapada Komna Mundapala Viplab Kumar Nayak Desk Officer CONSTRUCTION OF CULVERT FROM SUABAHAL TO KHETRA MOHANPADA OF MUNDAPALA GP 68 days
97 Odisha Nuapada Komna Jadamunda Viplab Kumar Nayak Desk Officer CONSTRUCTION OF TITLIMUNDA CULVERT AT THONGO OF JADAMUNDA GP 68 days
98 Odisha Nuapada Nuapada Godfula Viplab Kumar Nayak Desk Officer Improvement of road from Chatanpada to Patparpali village 68 days
99 Odisha Nuapada Nuapada Beltukri Viplab Kumar Nayak Desk Officer Improvement of road from Barakothi to Mararpada to Tariapada 68 days
100 Odisha Nuapada Nuapada Parkod Viplab Kumar Nayak Desk Officer Improvement of road from PWD road to Semeria Dharsa road 68 days
101 Odisha Nuapada Nuapada Chulabhat Viplab Kumar Nayak Desk Officer Improvement of road from Supli basti to Keutpada 68 days
102 Odisha Khordha Banapur Ayatpur Viplab Kumar Nayak Desk Officer Repair and Maintance of Bridge at TotaGaon 83 days
103 Odisha Khordha Banapur Nachuni Viplab Kumar Nayak Desk Officer implimentation of Nachuni college road 83 days
104 Odisha Khordha Banapur Bhabanipur Viplab Kumar Nayak Desk Officer Improvement of road Gateswarpur Sanapokhari north side road 83 days
105 Odisha Khordha Banapur Damiabarabara Viplab Kumar Nayak Desk Officer Construction of culvert and Guardwall at Gurupada Nuagaon 83 days
106 Odisha Khordha Tangi Sanarautapada Viplab Kumar Nayak Desk Officer Protection wall with CC road at Sanaroutapada Smasan Road 83 days
107 Odisha Khordha Tangi Mangalajodi Viplab Kumar Nayak Desk Officer Construction of CC road from Kalyan Mandap to Baghei Thakurani 83 days
108 Odisha Khordha Tangi Dia Viplab Kumar Nayak Desk Officer Construction of CC road from Dia Canal Bandha to Jagannath Sadak 83 days
109 Odisha Khordha Tangi Khunjjuri Viplab Kumar Nayak Desk Officer Construction of CC road from NH-16 to Subarnapur 83 days
110 Odisha Khordha Tangi Nirakarpur Viplab Kumar Nayak Desk Officer Imp. Of CC road at Ratha Colony, Nirakarpur 83 days
111 Odisha Khordha Tangi Sundarapur Viplab Kumar Nayak Desk Officer Construction of CC road from Ramalila Padia to Durgapuja Padia at Sundarpur Badasahi 83 days
112 Odisha Khordha Tangi Balipatapur Viplab Kumar Nayak Desk Officer Construction of CC road from Badrinath Maharana House to Bada Pokhari at Deulasahi 83 days
113 Odisha Khordha Tangi Badapari Viplab Kumar Nayak Desk Officer Construction of CC road from RD road to Raja Sundara House at Badapari 83 days
114 Odisha Khordha Tangi Ramachandrapur Viplab Kumar Nayak Desk Officer Construction of CC road from Amina Bhola House to Dahaldei Temple at Singarama 83 days
115 Odisha Puri Kakat Pur Suhagpur Viplab Kumar Nayak Desk Officer Construction of CC Road with Culvert from Khola Pokhari to Maharana House 83 days
116 Odisha Puri Kakat Pur Kaduanuagaon Viplab Kumar Nayak Desk Officer Construction of CC Road from Kumar Khantia to Gopal sahi smasan 83 days
117 Odisha Puri Kakat Pur Kakatpur Viplab Kumar Nayak Desk Officer Repairing of road from Mangala College Gate to Prachi river Bridge 83 days
118 Odisha Puri Kakat Pur Kantapada Viplab Kumar Nayak Desk Officer Repairing of Nilakanthapur Bhoi sahi Road 83 days
119 Odisha Puri Kakat Pur Abadan Viplab Kumar Nayak Desk Officer Construction of CC Road from Nadiamatha RD road to Banambar Mahadev Temple road 83 days
120 Odisha Khordha Chilika Dungamal (Ct) Viplab Kumar Nayak Desk Officer CONSTRUCTION OF CC ROAD FROM JHUNU BEHERA HOUSE TO RAJKISHORE PRADHAN HOUSE 83 days
121 Odisha Khordha Chilika Chndeswar Viplab Kumar Nayak Desk Officer IMPROVEMENT OF ROAD NEAR PUTANA AMRIT SAROVAR 83 days
122 Odisha Puri Nimapada Badasirivila Viplab Kumar Nayak Desk Officer Maintenance of Road of Bhagabansundara Canal road 83 days
123 Odisha Puri Nimapada Balanga Viplab Kumar Nayak Desk Officer Maintenance of Road in front of Balanga Police Station old water tank to P.S end 83 days
124 Odisha Puri Nimapada Bhiligram Viplab Kumar Nayak Desk Officer Maintenance of Road at Jhampulakuda Satsang Colony 83 days
125 Odisha Puri Nimapada Bhiligram Viplab Kumar Nayak Desk Officer Maintenance of Road Maniadiha village road 83 days
126 Odisha Puri Nimapada Chanrapada Viplab Kumar Nayak Desk Officer Maintenance of Road from Bhatabandha road to Koli Pokhari road 83 days
127 Odisha Puri Nimapada Chhanijanga Viplab Kumar Nayak Desk Officer Maintenance of Road & Culvert from Bhogasalada main road to water tank 83 days
128 Odisha Puri Nimapada Deuna Viplab Kumar Nayak Desk Officer Maintenance of Road from Raghunath Nayak house to Narendra Biswal House , Ratnakar Bihar 83 days
129 Odisha Puri Nimapada Dhanua Viplab Kumar Nayak Desk Officer Maintenance of Road & Culvert at Safei at Baulapada village 83 days
130 Odisha Puri Nimapada Miteipur Viplab Kumar Nayak Desk Officer Maintenance of Road from Jatadhari Jena house to Rabindra Swain house, Kaduapatna 83 days
131 Odisha Puri Nimapada Sainsasasan Viplab Kumar Nayak Desk Officer Maintenance of Road Kasipur Brahman sahi road 83 days
132 Odisha Puri Nimapada Tampalo Viplab Kumar Nayak Desk Officer Maintenance of Road Panchabatia village road 83 days
133 Odisha Puri Nimapada Tampalo Viplab Kumar Nayak Desk Officer Maintenance of Road from Panchabatia village road to Panchayat Pokhari 83 days
134 Odisha Nayagarh Nuagaon Sorada Viplab Kumar Nayak Desk Officer Const. of cc road at Jagannathprasad HS back side 83 days
135 Odisha Nayagarh Nuagaon Sikrida Viplab Kumar Nayak Desk Officer Const. of cc road from Sikrida to Jagannathprasad 83 days
136 Odisha Nayagarh Nuagaon Nuagaon Viplab Kumar Nayak Desk Officer Const. of cc road at Block Colony/Premises 83 days
137 Odisha Nayagarh Nuagaon Paradhipi Viplab Kumar Nayak Desk Officer Const. of cc road from Abhayapur Nuasahi to Balanda 83 days
138 Odisha Nayagarh Nuagaon Dhenkena Viplab Kumar Nayak Desk Officer Improvement of CC Road and Culvert from Madhuban to Malabandha 83 days
139 Odisha Khordha Balipatna Athantara Viplab Kumar Nayak Desk Officer Maintenance of CC road from Diba Bhoi house to Maa Khetrapal Temple, Barilo 83 days
140 Odisha Khordha Balipatna Athantara Viplab Kumar Nayak Desk Officer Repair & maintenance of Road from Maa mangala Temple to Binay Nayak House 83 days
141 Odisha Khordha Balipatna Alisisasan Viplab Kumar Nayak Desk Officer Maintenance of CC road pakuna nanda shop to Amiya sahoo house 83 days
142 Odisha Khordha Balipatna Alisisasan Viplab Kumar Nayak Desk Officer Maintenance of road from Bhairpur melana padia masani to baliachatura culvert 83 days
143 Odisha Khordha Balipatna Rajasa Viplab Kumar Nayak Desk Officer Maintenance of CC road inside Rajas PHC Premises 83 days
144 Odisha Kendrapara Kendrapada Kapaleswar Viplab Kumar Nayak Desk Officer Repair & Maintenance of road from VIP road to Garapur RI Office 120 days
145 Odisha Nayagarh Gania Kishoreprasad Viplab Kumar Nayak Desk Officer CC road from bus stop to Brahmana sahi road 83 days
146 Odisha Nayagarh Gania Chhamundia Viplab Kumar Nayak Desk Officer CC road at malisahi 83 days
147 Odisha Nayagarh Gania Adakata Viplab Kumar Nayak Desk Officer CC road kenduabida to tamarajhola 83 days
148 Odisha Nayagarh Gania Karadapada Viplab Kumar Nayak Desk Officer Arjunkholo cc road nuapada 83 days
149 Odisha Nayagarh Gania Belapadapatna Viplab Kumar Nayak Desk Officer CC road mali sahi taladanada school to malatiput 83 days
150 Odisha Nayagarh Gania Rasanga Viplab Kumar Nayak Desk Officer rasang harijan sahi to high school culvert with cc 83 days
151 Odisha Nayagarh Gania Gania Viplab Kumar Nayak Desk Officer Gania paikasahi to pokhari road cc at gania 83 days
152 Odisha Nayagarh Odagaon Angisingi Viplab Kumar Nayak Desk Officer Improvement of Angisingi Bridge to Puania road 83 days
153 Odisha Nayagarh Odagaon Dimisira Viplab Kumar Nayak Desk Officer Improvement of Dimisar village road 83 days
154 Odisha Nayagarh Odagaon Pantikhari Viplab Kumar Nayak Desk Officer Const. of CC road at Pantikhari Belapada Sahi 83 days
155 Odisha Nayagarh Odagaon Bhadikila Viplab Kumar Nayak Desk Officer Const. of Ragadimada Golasahi CC road 83 days
156 Odisha Nayagarh Odagaon Badagodada Viplab Kumar Nayak Desk Officer Const. of CC road from Jagnnath Sadak to Barisahi road,vill-sanagorada 83 days
157 Odisha Nayagarh Odagaon Banthapur Viplab Kumar Nayak Desk Officer Improvement of Nepal village road 83 days
158 Odisha Nayagarh Odagaon Kurala Viplab Kumar Nayak Desk Officer Nauriagada smasan CC road 83 days
159 Odisha Cuttack Salepur Balisahi Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM UPA BARIK HOUSE TO CHITTA MOHANTY HOUSE, RODHAPUR, BALISAHI 83 days
160 Odisha Cuttack Salepur Bhimdaspur Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF TALAPADA BARAL SAHI ROAD 83 days
161 Odisha Cuttack Salepur Champati Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM JITENDRA BHUYAN HOUSE TO KENDRAPADA CANAL, WARD NO. 10, SATABATIA 83 days
162 Odisha Cuttack Salepur Mahana Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM MUSLIM SAHI TO CHAKA ROAD, MAHAN 83 days
163 Odisha Cuttack Salepur Raisunguda Viplab Kumar Nayak Desk Officer MAINTENANCE AND IMPROVEMENT OF ROAD FROM KUSAMBI MUSLIM SAHI TO ROUT SAHI, WARD NO. 16, KUSAMBI 83 days
164 Odisha Cuttack Salepur Paschimakachha Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM KOCHILEI TEMPLE TO BANIA SAHI, WARD NO. 10 83 days
165 Odisha Cuttack Salepur Purunahat Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF BELERA VILLAGE ROAD 83 days
166 Odisha Cuttack Salepur Raisunguda Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM MURALI NAYAK HOUSE TO AKSHYA MOHAPATRA HOUSE, VILLAGE-MADHANGA 83 days
167 Odisha Cuttack Salepur Sidho Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM KHAIRA BISWAL SAHI TO 4F CANAL ROAD, KHAIRA 83 days
168 Odisha Cuttack Salepur Trilochanpur Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM GORA CHACHA HOUSE TO GULJAR KHAN HOUSE, KOTHABADA 83 days
169 Odisha Cuttack Salepur Satyabhamapur Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENACE OF CC ROAD FROM BULA PANI HOUSE TO GANESWAR MUKTESWAR TEMPLE , GANESWARPUR 83 days
170 Odisha Cuttack Salepur Gopinathpur Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF CC ROAD FROM BHARATI BHUSAN DAS HOUSE TO MAIN ROAD, GOPINATHAPUR 83 days
171 Odisha Cuttack Salepur Madhyakachha Viplab Kumar Nayak Desk Officer REPAIR & MAINTENANCE OF ROAD FROM CANNAL BANDHA TO AKHANDALAMANI MANDIRA, BARAGODIA, WARD NO-12 83 days
172 Odisha Cuttack Salepur Purunahat Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENACE OF ROAD FROM GANGAPUR THAKURANI TO SATYABADI CHAINI HOUSE, GANGAPUR 83 days
173 Odisha Cuttack Salepur Mutarifa Viplab Kumar Nayak Desk Officer REPAIR & MAINTENANCE OF ROAD FROM WARD NO-1 CHAKKA TO PRAFULLA SAHU HOUSE, MUTARIFA 83 days
174 Odisha Cuttack Salepur Ratilo Viplab Kumar Nayak Desk Officer REPAIR & MAINTENANCE OF CC ROAD FROM KURULI BADA POLA TO MOHANTY SAHI, KURULI 83 days
175 Odisha Cuttack Salepur Trilochanpur Viplab Kumar Nayak Desk Officer REPAIR & MAINTENANCE OF ROAD FROM BHASKARA SAHOO HOUSE TO KALA BHAIRABI LAND, TRILOCHANAPUR WARD NO-8 83 days
176 Odisha Cuttack Salepur Sidho Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF CC ROAD FROM 5 NO CANNAL TO RAMA NAYAK HOUSE, SIDHO 83 days
177 Odisha Cuttack Salepur Rameswar Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF CC ROAD FROM HANUMAN MANDIR TO AKULI PRADHAN HOUSE. SANYASIPATANA 83 days
178 Odisha Nuapada Komna Maniguda Viplab Kumar Nayak Desk Officer IMPROVEMENT OF ROAD FROM NAIKPADA TO GANIARY 68 days
179 Odisha Nuapada Komna Poinr Viplab Kumar Nayak Desk Officer IMPROVEMENT OF ROAD FROM POINR GP OFFICE TOWARDS MAHULBHATA OF POINR GP 68 days
180 Odisha Khordha Chilika Biribadi Viplab Kumar Nayak Desk Officer IMPROVEMENT OF ROAD NEAR RURAL PARK KAITHAPALLA,BIRIBADI 83 days
181 Odisha Khordha Chilika Haripur Viplab Kumar Nayak Desk Officer IMPROVEMENT OF ROAD AT RURAL PARK HARIPUR 83 days
182 Odisha Khordha Banapur Galua Viplab Kumar Nayak Desk Officer IMP OF ROAD FROM KAPILABIDYAPITHA AT BHIMPUR 83 days
183 Odisha Khordha Banapur Bhabanipur Viplab Kumar Nayak Desk Officer IMP OF ROAD GATESWARPUR SANAPOKHARI NORTH SIDE ROAD 83 days
184 Odisha Khordha Bolagarh Khanguria Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF RD ROAD TO MUKTAR KHAN HOUSE ROAD 83 days
185 Odisha Khordha Bolagarh Khanguria Viplab Kumar Nayak Desk Officer HARIPUR TO HARIPUR SMASAN ROAD 83 days
186 Odisha Khordha Bhubaneswar Basuaghai Viplab Kumar Nayak Desk Officer Improvement/Repair & Maintenance of road from Debajoti Pattnaik house to South Side,Sushantibihar 83 days
187 Odisha Khordha Bhubaneswar Itipur Viplab Kumar Nayak Desk Officer Improvement/Repair & Maintenance of road from Panchayat Road to Keshab Swain House at Nistarinipur 83 days
188 Odisha Khordha Bhubaneswar Ranasinghpur Viplab Kumar Nayak Desk Officer Improvement/Repair & Maintenance of road from Bhuban Apartment Chhaka to Hanuman Temple 83 days
189 Odisha Khordha Bhubaneswar Malipada Viplab Kumar Nayak Desk Officer Improvement/Repair & Maintenance of road from Gothapatna Main road to Mantra Apartment 83 days
190 Odisha Khordha Balianta Kakaruidrapur Viplab Kumar Nayak Desk Officer CONSTRUCTION OF CC ROAD AT PANCHALO ROAD 83 days
191 Odisha Khordha Tangi Sanarautapada Viplab Kumar Nayak Desk Officer PROTECTION WALL WITH CC ROAD AT SANAROUTAPADA SMASAN ROAD 83 days
192 Odisha Khordha Tangi Mangalajodi Viplab Kumar Nayak Desk Officer CONSTRUCTION OF CC ROAD FROM KALYAN MANDAP TO BAGHEI THAKURANI MANGALAJODI 83 days
193 Odisha Khordha Tangi Dia Viplab Kumar Nayak Desk Officer CONSTRUCTION OF CC ROAD FROM DIA CANAL BANDHA TO JAGANNATH SADAK 83 days
194 Odisha Khordha Tangi Khunjjuri Viplab Kumar Nayak Desk Officer CONSTRUCTION OF CC ROAD FROM NH16 TO SUBARNAPUR KUNJURI 83 days
195 Odisha Khordha Balianta Bentapur Viplab Kumar Nayak Desk Officer CONSTRUCTION OF CC ROAD FROM BAISNAB SAHI TO MALLICK SAHI, W-01 83 days
196 Odisha Khordha Balianta Jhinti Sasan Viplab Kumar Nayak Desk Officer MAINTENANCE OF CC ROAD FROM MAHIMA GADI TO BAPINA GOCHAYAT HOUSE 83 days
197 Odisha Khordha Balianta Prataprudrapur Viplab Kumar Nayak Desk Officer CONSTRUCTION OF CC ROAD FROM BETENDA TO BALUNKESWARI PATAMAHADEV PITHA 83 days
198 Odisha Khordha Balianta Bhingarapur Viplab Kumar Nayak Desk Officer CONSTRUCTION OF DARA CHOUKA SMASAN ROAD , W-11 83 days
199 Odisha Khordha Jatni Angarapada Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM MAHAVIR TEMPLE TO GAURANGA SAHOO HOUSE ,PALASPUR, ANGARAPADA. 83 days
200 Odisha Khordha Jatni Taraboi Viplab Kumar Nayak Desk Officer REPAIR AND MAINTENANCE OF ROAD FROM HARIDAMADA SCHOOL TO MAKRAMALI HOUSE, HARIDAMADA, TARABOI 83 days
201 Odisha Khordha Begunia Deuli Viplab Kumar Nayak Desk Officer CONST. OF CC ROAD FROM ROHITA MUDULI HOUSE TO UP SCHOOL VIA DALAK 83 days
202 Odisha Khordha Begunia Botalama Viplab Kumar Nayak Desk Officer CONST. OF CC ROAD NEAR KAPILESWAR TEMPLE PREMISES, BADABARABATI 83 days
203 Odisha Khordha Begunia Govuindapur Viplab Kumar Nayak Desk Officer CONST. OF CC ROAD NEAR RATNA MANDAP, BRAHMAPURA 83 days
204 Odisha Khordha Begunia Begunia Viplab Kumar Nayak Desk Officer CONST. OF CC ROAD FROM BHAGABAT GHAR TO ABAKASH MOHAPATRA HOUSE AT BHOIPUR 83 days
205 Odisha Khordha Balipatna Athantara Viplab Kumar Nayak Desk Officer Maintenance of CC Road from Diba Bhoi House to Maa Khetrapal Temple, Barilo 83 days
206 Odisha Khordha Balipatna Rajasa Viplab Kumar Nayak Desk Officer Maintenance CC Road inside Rajas PHC Premises 83 days
207 Odisha Khordha Balipatna Alisisasan Viplab Kumar Nayak Desk Officer Maintenance of CC road Pakuna Nanda Shop to Aniya Sahoo house 83 days
208 Odisha Gajapati Rayagad Jalango Viplab Kumar Nayak Desk Officer Completion of incomplete Culvert bridge at Dumba village of Jallango 68 days
209 Odisha Gajapati Rayagad Karadasingi Viplab Kumar Nayak Desk Officer Completion of Incomplete CD Work at S.Kalamasing 68 days
210 Odisha Gajapati Rayagad Kumulsing Viplab Kumar Nayak Desk Officer Construction of CD Work at Tinkoda village of Kumulasing 68 days
211 Odisha Gajapati Rayagad Karadasingi Viplab Kumar Nayak Desk Officer Improvement of Road at Harijana Sahi Burujanga Village 68 days
212 Odisha Gajapati Rayagad Sanatundi Viplab Kumar Nayak Desk Officer Improvement of Road at GP Office to School Ghara Sanatundi 68 days
213 Odisha Khordha Khordha Kaipadara Viplab Kumar Nayak Desk Officer Improvement and Repair of road from Pala mandap to Shiv temple & Maintenace 83 days
214 Odisha Khordha Khordha Kaipadara Viplab Kumar Nayak Desk Officer Improvement and Repair & Maintenace of road from Dalei sahi Champati Sahi Artikia dia to Smasana 83 days
215 Odisha Khordha Khordha Khuradhamalla Viplab Kumar Nayak Desk Officer Const.of CC road from Sialia Adivasi sahi to Xavier School 83 days
216 Odisha Nayagarh Gania Chhamundia Viplab Kumar Nayak Desk Officer MUDULIGADIA BEHERA SAHI CC 83 days
217 Odisha Puri Pipili Kanti Viplab Kumar Nayak Desk Officer CONST. OF CC ROAD AT NIJIGADAKURUKHI PATRA SAHI CHIKU BISWAL HOSE TO DHALA SAHI ROAD 68 days
218 Odisha Puri Pipili Orkal Viplab Kumar Nayak Desk Officer CONST. OF CC ROAD AT GOBARDHANAPUR SULTAN NAGAR KANAS MINOR CANAL TO PURNA SWAIN POULTRY FARM 68 days
219 Odisha Puri Pipili Rulpadeipur Viplab Kumar Nayak Desk Officer CONST. OF BAULACHAUKA BEHERA SAHI CC ROAD 68 days
220 Odisha Puri Pipili Chandradeipur Viplab Kumar Nayak Desk Officer REPAIR & MAINTANCE OF KAMAKANTIA VILL. CC ROAD WITH PAVER WORKS 68 days
221 Odisha Puri Pipili Kulasekharapatana Viplab Kumar Nayak Desk Officer CONST. OF DRAIN AT ABALPUR DAS SAHI 68 days
222 Odisha Puri Pipili Pamasara Viplab Kumar Nayak Desk Officer REPAIR & MAINTANCE OF KAIRI VILL. CC ROAD AT WARD NO 8 & 9 (VILLAGE MAIN ROAD) 68 days
223 Odisha Puri Pipili Jasuapur Viplab Kumar Nayak Desk Officer CONST. OF CC ROAD FROM LAXMAN PRADHAN HOUSE TO ROAD END WORD NO -4 68 days
224 Odisha Gajapati Nuagada Sundardanga Viplab Kumar Nayak Desk Officer Improvement of road from Paikapada to Anupur 68 days
225 Odisha Gajapati Nuagada Udayapur Viplab Kumar Nayak Desk Officer Improvement of road from RD road to AWC centre,Udayapur 68 days
226 Odisha Gajapati Nuagada Luhangar Viplab Kumar Nayak Desk Officer Improvement of road from RD road to Dasarathi sahi,Bagari 68 days
227 Odisha Gajapati Nuagada Parimala Viplab Kumar Nayak Desk Officer Improvement of road from Bania sahi to VSS building, N.Baradang 68 days
228 Odisha Gajapati Nuagada Keradang Viplab Kumar Nayak Desk Officer Improvement of road from RD road to Shiv temple 68 days
229 Odisha Gajapati Nuagada Sambalpur Viplab Kumar Nayak Desk Officer Improvement of road from RD road to Shiv temple 68 days
230 Odisha Gajapati Nuagada Paika Antarada Viplab Kumar Nayak Desk Officer Improvement of road from RD road to Mandala sahi,Guar 68 days
231 Odisha Gajapati Nuagada Paika Antarada Viplab Kumar Nayak Desk Officer Improvement of road from Badasankha to Kusumpadara village 68 days
232 Odisha Gajapati Nuagada Tabarada Viplab Kumar Nayak Desk Officer Completion of incomplete bridge with approach road at K.Baradang 68 days
233 Odisha Gajapati Nuagada Kirama Viplab Kumar Nayak Desk Officer Construction of paver block road from RD road to Highschool 68 days
234 Odisha Gajapati Nuagada Badapada Viplab Kumar Nayak Desk Officer Construction of CC road from PWD road to Ambedkar Yuvaksangha community hall 68 days
235 Odisha Gajapati Nuagada Khajuripada Viplab Kumar Nayak Desk Officer Improvement of road from PWD road to DePaul School 68 days
236 Odisha Gajapati Nuagada Nuagada Viplab Kumar Nayak Desk Officer Improvement of road from PWD road to GPLF building Nuagada 68 days
237 Odisha Gajapati Nuagada Tangili Viplab Kumar Nayak Desk Officer Improvement of road from RD road to Smashan Ghat 68 days
238 Odisha Balasore Simulia Andarai Viplab Kumar Nayak Desk Officer Construction of CC Road from Rasuna Chhak to swain sahi PMGSY road. 68 days
239 Odisha Balasore Simulia Anandapur Viplab Kumar Nayak Desk Officer Construction of CC culvert near jagat upadhaya pokhari. 68 days
240 Odisha Balasore Simulia Bangalpur Viplab Kumar Nayak Desk Officer Construction of CC Road from dhusasan jena house to nandi gadia. 68 days
241 Odisha Balasore Simulia Bangarkhandigadia Viplab Kumar Nayak Desk Officer Construction of CC Road/drain with culvert at chhachinda village main road . 68 days
242 Odisha Balasore Simulia Bati Viplab Kumar Nayak Desk Officer Construction of CC Road from panda sahi to muduli sahi. 68 days
243 Odisha Balasore Simulia Jamujhadi Viplab Kumar Nayak Desk Officer Construction of CC Road from Ganesh guru house to sura khilar with culvert. 68 days
244 Odisha Balasore Simulia Kanchapada Viplab Kumar Nayak Desk Officer Construction of CC Road from edatal minor to ganesh sahu house with culvert. 68 days
245 Odisha Balasore Simulia Kirkona Viplab Kumar Nayak Desk Officer Construction of CC Road from khirkona bala sahi to Uma ojha house. 68 days
246 Odisha Balasore Simulia Maitapur Viplab Kumar Nayak Desk Officer Construction of CC Road from Markona Minor to CRC with culvert at badagahama. 68 days
247 Odisha Balasore Simulia Markona Viplab Kumar Nayak Desk Officer Construction of CC Road from Mahaveer mandir to tala sahi. 68 days
248 Odisha Balasore Simulia Muruna Viplab Kumar Nayak Desk Officer Construction of CC Road from Ratnakar house to chachanda with culvert. 68 days
249 Odisha Balasore Simulia Purosottampur Viplab Kumar Nayak Desk Officer Construction of CC Road from Balikhanda kanchapada RD road to Gouranga barik house. 68 days
250 Odisha Balasore Simulia Pahitorana Viplab Kumar Nayak Desk Officer Construction of CC Road from Pratap pur minor to chaka Dinabandhu jena. 68 days
251 Odisha Balasore Simulia Samasundarpur Viplab Kumar Nayak Desk Officer Construction of Culvert at sadanandapur Mohanty sahi. 68 days
252 Odisha Gajapati R.Udayagiri Ramagiri Viplab Kumar Nayak Desk Officer Improvement of road from PWD road to Hatapada Ramagiri 68 days
253 Odisha Balasore Simulia Markona Viplab Kumar Nayak Desk Officer Construction of CC Road from Arun padhi house to Adibashi sahi road. 68 days
254 Odisha Gajapati R.Udayagiri Anagha Viplab Kumar Nayak Desk Officer Improvement of road at Baraba 68 days
255 Odisha Gajapati R.Udayagiri Ramagiri Viplab Kumar Nayak Desk Officer Improvement of road from RD road to Basundhara Over Head Tank Ramagiri 68 days
256 Odisha Gajapati R.Udayagiri Subalada Viplab Kumar Nayak Desk Officer Improvement of road at Tobhajhola 68 days
257 Odisha Gajapati R.Udayagiri Mangarajpur Viplab Kumar Nayak Desk Officer Improvement of road at Nuasahi Tarapada 68 days
258 Odisha Gajapati R.Udayagiri Bastariguda Viplab Kumar Nayak Desk Officer Construction of Culvert at Kitung Nala A-Anjeikona 68 days
259 Odisha Gajapati Gosani Badakathuru Viplab Kumar Nayak Desk Officer Construction of paver block road at chatrapur 68 days
260 Odisha Gajapati Gosani Badagosani Viplab Kumar Nayak Desk Officer Construction of culvert near badabillo at mahadeipur 68 days
261 Odisha Gajapati Gosani Tatipetti Viplab Kumar Nayak Desk Officer Construction of road from gollagaon road to ghorani road 68 days
262 Odisha Gajapati Gosani Kerandi Viplab Kumar Nayak Desk Officer Construction of paver block road at indra nagar 68 days
263 Odisha Gajapati Gosani Kerandi Viplab Kumar Nayak Desk Officer Construction of culvert and drain sri ram bihar 68 days
264 Odisha Gajapati R.Udayagiri Ramagiri Viplab Kumar Nayak Desk Officer Improvement of road at Goudasahi Ramagiri 68 days
265 Odisha Cuttack Tangi Choudwar Uchapada Viplab Kumar Nayak Desk Officer Imp of CC road from Narayana Baral house to Canal No-5 Sota, Khetrapal 68 days
266 Odisha Cuttack Tangi Choudwar Kotasahi Viplab Kumar Nayak Desk Officer Maintenance of road from Bateswar to Koteswar, Kotasahi GP 68 days
267 Odisha Cuttack Tangi Choudwar Banipada Viplab Kumar Nayak Desk Officer Maintenance of CC road from Banipada AWC to Kambusagar Pokhari at Banipada 68 days
268 Odisha Cuttack Tangi Choudwar Banipada Viplab Kumar Nayak Desk Officer Maintenance of CC road from Rabi Mishra res. To Sudhir Parida res. At Gopalpur 68 days
269 Odisha Cuttack Tangi Choudwar Mangarajpur Viplab Kumar Nayak Desk Officer Const. of CC road from Mangal Melsandi house to forest road at Kochilanuagaon 68 days
270 Odisha Cuttack Tangi Choudwar Bramhapur Viplab Kumar Nayak Desk Officer Maintenance of CC road from Golakha Nayak house to Geda Tarai house,Jemadeipur 68 days
271 Odisha Cuttack Tangi Choudwar Kakhadi Viplab Kumar Nayak Desk Officer Maintenance of CC road from Kakhadi Bhagabata Sahi Naba Sahoo house to Achyuta Sahoo house 68 days
272 Odisha Cuttack Tangi Choudwar Garudagaon Viplab Kumar Nayak Desk Officer Maintenance of CC road from Fakir Sethy House Madan rout House 68 days
273 Odisha Cuttack Tangi Choudwar Jaripada Viplab Kumar Nayak Desk Officer Maintenance of CC road sanalekhanpur road & bridge 68 days
274 Odisha Cuttack Tangi Choudwar Bhatimunda Viplab Kumar Nayak Desk Officer Maintenance of CC road rameswar canal road , Saranga 68 days
275 Odisha Cuttack Tangi Choudwar Bhatimunda Viplab Kumar Nayak Desk Officer Maintenance of CC road Baniasahi cenal bridge 68 days
276 Odisha Cuttack Tangi Choudwar Napanga Viplab Kumar Nayak Desk Officer Maintenance of CC road korkora pratapsahi to jora polo 68 days
277 Odisha Gajapati Mohona Sikulipadara Viplab Kumar Nayak Desk Officer Improvement of Road from D. Colony to Talasing PWD Road 68 days
278 Odisha Gajapati Kasinagar Kidigam Viplab Kumar Nayak Desk Officer Construction of Culvert at Sunkanapeta Village 68 days
279 Odisha Gajapati Kasinagar Siali Viplab Kumar Nayak Desk Officer Construction from Karnibhadra Village to Nukalammma Mandir 68 days
280 Odisha Gajapati Kasinagar Parthada Viplab Kumar Nayak Desk Officer Improvement of road at Sidhamasingh Street at T. Joduru 68 days
281 Odisha Gajapati Kasinagar K.Sitapur Viplab Kumar Nayak Desk Officer Improvement of Road at Bijalguda 68 days
282 Odisha Gajapati Kasinagar Allada Viplab Kumar Nayak Desk Officer Improvement of road at Indira Colony(Bhaliaguda) 68 days
283 Odisha Gajapati Kasinagar K.Sitapur Viplab Kumar Nayak Desk Officer Construction of CC road at Nilakanthapur Street at Singipur Village 68 days
284 Odisha Gajapati Kasinagar K.Sitapur Viplab Kumar Nayak Desk Officer Construction of Paver Block road at D Tirupati House to G Khagi House Minigam 68 days
285 Odisha Gajapati Kasinagar Goribandha Viplab Kumar Nayak Desk Officer Construction of CC road at Trinath Mandap to Ram Mandir 68 days
286 Odisha Gajapati Kasinagar Budura Viplab Kumar Nayak Desk Officer Improvement of road from Market Complex Back side to towards tengalam Bothava Colony 68 days
287 Odisha Gajapati Mohona Antaraba Viplab Kumar Nayak Desk Officer Improvement road from PWD Road to Renu 68 days
288 Odisha Gajapati Mohona Garadama Viplab Kumar Nayak Desk Officer Improvement road from Gambhari school to RD road 68 days
289 Odisha Gajapati Mohona Mandimara Viplab Kumar Nayak Desk Officer Improvement road and culvert on the road to Saralapadar 68 days
290 Odisha Gajapati Mohona Gurujhuli Viplab Kumar Nayak Desk Officer Improvement road at RD Road to Gangudipankala 68 days
291 Odisha Gajapati Mohona Mohana Viplab Kumar Nayak Desk Officer Maintenance of Manikeswari Mandira road 68 days
292 Odisha Gajapati Mohona Manikapur Viplab Kumar Nayak Desk Officer Repair and Maintenance of Road from PWD road to hanuman temple Manikpur 68 days
293 Odisha Gajapati Mohona Birikote Viplab Kumar Nayak Desk Officer Construction of CC road at Patra sahi 68 days
294 Odisha Gajapati Mohona Luhagudi Viplab Kumar Nayak Desk Officer Construction of CC road at Main road to Odia sahi 68 days