| 1 |
Odisha |
Dhenkanal |
Hindol |
Giridhar Prasad |
Sri Siddharth Sankar Swain |
Director PR |
IMPROVEMENT OF ROAD FROM KHANDATIRI MANGALA MANDIR FRRONT TO PALA MANDAP |
108 days |
Forward Pending |
| 2 |
Odisha |
Dhenkanal |
Hindol |
Kadala |
Sri Siddharth Sankar Swain |
Director PR |
IMPROVEMENT OF ROAD FROM AKHANDALAMANI TO KHUNTUGUDA KUA OF KADALA VILLAGE |
108 days |
Forward Pending |
| 3 |
Odisha |
Dhenkanal |
Hindol |
Kunua |
Sri Siddharth Sankar Swain |
Director PR |
IMPROVEMENT OF ROAD FROM SOCIETY TO KUNUA ME SCHOOL |
108 days |
Forward Pending |
| 4 |
Odisha |
Dhenkanal |
Hindol |
Bampa |
Sri Siddharth Sankar Swain |
Director PR |
IMPROVEMENT OF ROAD FROM PMGSY ROAD TO LOKANATHPUR |
108 days |
Forward Pending |
| 5 |
Odisha |
Dhenkanal |
Hindol |
Gulehi |
Sri Siddharth Sankar Swain |
Director PR |
IMPROVEMENT OF GULEHI UPPER SAHI CC ROAD |
108 days |
Forward Pending |
| 6 |
Odisha |
Dhenkanal |
Hindol |
Rasol |
Sri Siddharth Sankar Swain |
Director PR |
IMPROVEMENT OF ROAD FROM PWD ROAD TO TELIBHUIN JAGANNATH TEMPLE |
108 days |
Forward Pending |
| 7 |
Odisha |
Dhenkanal |
Hindol |
Baunsa Pokhari |
Sri Siddharth Sankar Swain |
Director PR |
CONSTRUCTION OF APPROACH CC ROAD WITH CULVERT TO KARNAPUR PRIMARY SCHOOL |
108 days |
Forward Pending |
| 8 |
Odisha |
Dhenkanal |
Hindol |
Mahalunda |
Sri Siddharth Sankar Swain |
Director PR |
IMPROVEMENT OF NUAPADA TO DENGUBUREI ROAD |
108 days |
Forward Pending |
| 9 |
Odisha |
Dhenkanal |
Hindol |
Kantamila |
Sri Siddharth Sankar Swain |
Director PR |
CONSTRUCTION OF CULVERT AND CC ROAD AT KHAJURIAMUNDA VILLAGE |
108 days |
Forward Pending |
| 10 |
Odisha |
Dhenkanal |
Hindol |
Hatura |
Sri Siddharth Sankar Swain |
Director PR |
CONSTRUCTION OF CC ROAD FROM TUTUPADA TO BALASAR |
108 days |
Forward Pending |
| 11 |
Odisha |
Kalahandi |
Kesinga |
Adhamunda |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC Road and Protection Wall at Soringpadar High School |
59 days |
Forward Pending |
| 12 |
Odisha |
Kalahandi |
Kesinga |
Boria |
Sri Siddharth Sankar Swain |
Director PR |
Imp. of Road from Chicharla Mitu Ghar to Phatamnda Rasta |
59 days |
Forward Pending |
| 13 |
Odisha |
Kalahandi |
Kesinga |
Gaiagaon |
Sri Siddharth Sankar Swain |
Director PR |
Imp. of Road at Pujiguda |
59 days |
Forward Pending |
| 14 |
Odisha |
Kalahandi |
Kesinga |
Kundabandh |
Sri Siddharth Sankar Swain |
Director PR |
Imp. of Gurjimunda Harijan Pada Road |
59 days |
Forward Pending |
| 15 |
Odisha |
Kalahandi |
Kesinga |
Nunmath |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC Road at Harijan Pada Bijkhaman |
59 days |
Forward Pending |
| 16 |
Odisha |
Kalahandi |
Kesinga |
Patharla |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC Road from Shiva Mandir to Amthapada |
59 days |
Forward Pending |
| 17 |
Odisha |
Kalahandi |
Kesinga |
Phatkamal |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC Road with Culvert from PMGSY Road to Sritam Sa House at Boringpadar |
59 days |
Forward Pending |
| 18 |
Odisha |
Kalahandi |
Kesinga |
Phatkamal |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC Road from Main Road to AWC Boringpadar |
59 days |
Forward Pending |
| 19 |
Odisha |
Kalahandi |
Kesinga |
Sirjapali |
Sri Siddharth Sankar Swain |
Director PR |
Imp. of Road and Const. of Culvert from Sirjapali PMGSY Road to Podkhei Road |
59 days |
Forward Pending |
| 20 |
Odisha |
Kalahandi |
Kesinga |
Turlakhaman |
Sri Siddharth Sankar Swain |
Director PR |
Imp. of Road and Drain at Jharmunda, Limgaon |
59 days |
Forward Pending |
| 21 |
Odisha |
Kalahandi |
Kesinga |
Utkela |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC Road from Airport Road to Rice Mill NH 26 at Utkela |
59 days |
Forward Pending |
| 22 |
Odisha |
Kalahandi |
Kesinga |
Kandel |
Sri Siddharth Sankar Swain |
Director PR |
Imp. of Road from Khalapada to Kandel |
59 days |
Forward Pending |
| 23 |
Odisha |
Gajapati |
Gumma |
Badakalakote |
Sri Siddharth Sankar Swain |
Director PR |
Improvement of Gamango Sahi road at Badakalakote |
65 days |
Forward Pending |
| 24 |
Odisha |
Gajapati |
Gumma |
Brushava |
Sri Siddharth Sankar Swain |
Director PR |
Construction of culvert at Kundiraul upar sahi road,Tempogiri |
65 days |
Forward Pending |
| 25 |
Odisha |
Gajapati |
Gumma |
Munisingi |
Sri Siddharth Sankar Swain |
Director PR |
Improvement road from RD road to Mitu Sahi at Barangsing |
65 days |
Forward Pending |
| 26 |
Odisha |
Gajapati |
Gumma |
Tumula |
Sri Siddharth Sankar Swain |
Director PR |
Improvement road from RD road to Sabar Sahi at Sindiba |
65 days |
Forward Pending |
| 27 |
Odisha |
Gajapati |
Gumma |
Ukhara |
Sri Siddharth Sankar Swain |
Director PR |
Improvement road from Terembu Sahi to Buya Sahi at Sukei |
65 days |
Forward Pending |
| 28 |
Odisha |
Gajapati |
Gumma |
Tarangada |
Sri Siddharth Sankar Swain |
Director PR |
Improvement road from Lobaru Sahi to Nimiya Sahi at Ragaising |
65 days |
Forward Pending |
| 29 |
Odisha |
Gajapati |
Gumma |
Namangada |
Sri Siddharth Sankar Swain |
Director PR |
Construction of culvert from Lalu sahi road to Gomango Sahi road at Lalusahi |
65 days |
Forward Pending |
| 30 |
Odisha |
Gajapati |
Gumma |
Tumula |
Sri Siddharth Sankar Swain |
Director PR |
Construction of culvert from Tumula road to Tumchar road via Arangul and Tabarsing |
65 days |
Forward Pending |
| 31 |
Odisha |
Gajapati |
Gumma |
Ukhara |
Sri Siddharth Sankar Swain |
Director PR |
Construction of Bridge at Urangada nala |
65 days |
Forward Pending |
| 32 |
Odisha |
Puri |
Gop |
Birtung |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC road from NN road to Phakirapada |
62 days |
Forward Pending |
| 33 |
Odisha |
Puri |
Gop |
Davara |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC road from Olandi village to Subarnpur Gabakunda PWD road |
62 days |
Forward Pending |
| 34 |
Odisha |
Puri |
Gop |
Nagapur |
Sri Siddharth Sankar Swain |
Director PR |
Imp. Of Solapur Village road |
62 days |
Forward Pending |
| 35 |
Odisha |
Puri |
Gop |
Badatara |
Sri Siddharth Sankar Swain |
Director PR |
Repair and renov. Of road from Gadarupas Bhitaragada to Mahadev Temple |
62 days |
Forward Pending |
| 36 |
Odisha |
Puri |
Gop |
Badatara |
Sri Siddharth Sankar Swain |
Director PR |
Repair and Renov. Of road from Gochhayat Sahi temple to Gadarupas Nuapokhari |
62 days |
Forward Pending |
| 37 |
Odisha |
Puri |
Gop |
Nagapur |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC road from Nagapur to Kelasahi road |
62 days |
Forward Pending |
| 38 |
Odisha |
Puri |
Gop |
Itibhuan |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC road from Podatara village road to Panchayat Pokhari |
62 days |
Forward Pending |
| 39 |
Odisha |
Puri |
Gop |
Chhaitana |
Sri Siddharth Sankar Swain |
Director PR |
Imp. Of Road from Saraghar to Bada Pokhari |
62 days |
Forward Pending |
| 40 |
Odisha |
Puri |
Gop |
Gadabhingura |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC road from Jamua to Akhupada |
62 days |
Forward Pending |
| 41 |
Odisha |
Puri |
Gop |
Sutan |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC road from Garudeswar Sani Temple to Garudeswar Temple at Khalakatpatana |
62 days |
Forward Pending |
| 42 |
Odisha |
Puri |
Gop |
Boulanga |
Sri Siddharth Sankar Swain |
Director PR |
Cosnt. Of CC Road from Baulanga Banahara road to Baulanga Smashan |
62 days |
Forward Pending |
| 43 |
Odisha |
Puri |
Gop |
Birtung |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC road from Dibakar Mohapatra House to Fakirpada Grama road, Marad |
62 days |
Forward Pending |
| 44 |
Odisha |
Puri |
Gop |
Badagaon |
Sri Siddharth Sankar Swain |
Director PR |
Cosnt. Of CC Road from Balaram House to Satrugan House, Badagaon |
62 days |
Forward Pending |
| 45 |
Odisha |
Bhadrak |
Basudevpur |
Rajaharopokhari |
Sri Siddharth Sankar Swain |
Director PR |
Improvement of road & Culvert at Sahu Sahi Canal near Manua Palai House Vill- Laxmiprasad |
60 days |
Forward Pending |
| 46 |
Odisha |
Bhadrak |
Basudevpur |
Bramhangan |
Sri Siddharth Sankar Swain |
Director PR |
Improvement of road from Chakradhar Natha House to Kamalakanta Sahu House Vill-Alabaga |
60 days |
Forward Pending |
| 47 |
Odisha |
Bhadrak |
Basudevpur |
Jagannathpur |
Sri Siddharth Sankar Swain |
Director PR |
Improvement of road from Daitari pokhari to Electric Sub Station with drain Ward No-4,Vill-Jagannathpur |
60 days |
Forward Pending |
| 48 |
Odisha |
Bhadrak |
Basudevpur |
Barandua |
Sri Siddharth Sankar Swain |
Director PR |
Improvement of road from Uma Panigrahi Sahi to Sana Muduli Sahi with Culvert vill-Madhusudanpur |
60 days |
Forward Pending |
| 49 |
Odisha |
Bhadrak |
Basudevpur |
Barandua |
Sri Siddharth Sankar Swain |
Director PR |
Improvement of road with Side Wall from Near saraswati Mandap at sethi Sahi,Vill-Ratanga |
60 days |
Forward Pending |
| 50 |
Odisha |
Bhadrak |
Basudevpur |
Barandua |
Sri Siddharth Sankar Swain |
Director PR |
Improvement of road from RD Road to Sana Rout sahi vill-Ratanga |
60 days |
Forward Pending |
| 51 |
Odisha |
Bhadrak |
Basudevpur |
Barandua |
Sri Siddharth Sankar Swain |
Director PR |
Improvement of road from Dalei Sahi to Mahadev Vill- Ratanga |
60 days |
Forward Pending |
| 52 |
Odisha |
Puri |
Satyabadi |
Biswanathpur |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC road from Uttar SC Sahi Kothabari to Behera Babu House |
62 days |
Forward Pending |
| 53 |
Odisha |
Puri |
Satyabadi |
Mulalasa |
Sri Siddharth Sankar Swain |
Director PR |
Const and Renovation of Bridge at Nimasahi Road near Purna Pradhan House |
62 days |
Forward Pending |
| 54 |
Odisha |
Puri |
Satyabadi |
Penthapada |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC Road from NH 316 to Firestation via Irrigation IB |
62 days |
Forward Pending |
| 55 |
Odisha |
Puri |
Satyabadi |
Desabidyadharapur |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC Road from RD road to Chatu Bhoi sahi road |
62 days |
Forward Pending |
| 56 |
Odisha |
Puri |
Satyabadi |
Sri Ramachandrapur |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC Road from RD road to Bhutupada AWC Near Melanpadia |
62 days |
Forward Pending |
| 57 |
Odisha |
Puri |
Satyabadi |
Ketakipatna |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC road from Irrigation road to Benu Bhoi house at Alandapada |
62 days |
Forward Pending |
| 58 |
Odisha |
Puri |
Satyabadi |
Madhubana |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC Road from PED Road to Bhagabat Basudev House at Ichhapur |
62 days |
Forward Pending |
| 59 |
Odisha |
Puri |
Satyabadi |
Biraramachandrpur |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC road from Delang PWD Road to Bilasahi village road |
62 days |
Forward Pending |
| 60 |
Odisha |
Puri |
Satyabadi |
Dugal |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC road from Badahat village to Primary School |
62 days |
Forward Pending |
| 61 |
Odisha |
Puri |
Satyabadi |
Parajapada |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC Road at Bilasahi village |
62 days |
Forward Pending |
| 62 |
Odisha |
Puri |
Satyabadi |
Algum |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC Road from Batulipada RD Road to Dhaneswar House |
62 days |
Forward Pending |
| 63 |
Odisha |
Puri |
Satyabadi |
Balarampur |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC Road from Dipideuli to Balikapileswar Road and Culvert |
62 days |
Forward Pending |
| 64 |
Odisha |
Puri |
Satyabadi |
Nuasameswarpur |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC Road and Repairing of culvertfrom Nuasahi to Podangasahi village Road |
62 days |
Forward Pending |
| 65 |
Odisha |
Puri |
Satyabadi |
Kodua |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC Road from NH to Talapatna Raju Pal house Road |
62 days |
Forward Pending |
| 66 |
Odisha |
Puri |
Satyabadi |
Alisha |
Sri Siddharth Sankar Swain |
Director PR |
Const of CC road from Alisha Patandihasahi Raja Biswal House to P C Biswal Samadhi |
62 days |
Forward Pending |
| 67 |
Odisha |
Bhadrak |
Basudevpur |
Kumarpur |
Sri Siddharth Sankar Swain |
Director PR |
Improvement of road & Culvert at Tentuli Gharia Vill- Kumarpur |
60 days |
Forward Pending |
| 68 |
Odisha |
Bhadrak |
Basudevpur |
Kismat Krushanapur |
Sri Siddharth Sankar Swain |
Director PR |
Improvement of road from Panchayat road to Anjana Barik house Vill-Kkpur |
60 days |
Forward Pending |
| 69 |
Odisha |
Bhadrak |
Basudevpur |
Karanjadia |
Sri Siddharth Sankar Swain |
Director PR |
Improvement of road & Culvert at Sushanta Das House to Jayguru Mandir Vill- Karanjadia |
60 days |
Forward Pending |
| 70 |
Odisha |
Bhadrak |
Basudevpur |
Arandua |
Sri Siddharth Sankar Swain |
Director PR |
Improvement of Road from Sada Panda House to Doal Mandap and culvert at ward No-10 Vill- Arandua |
60 days |
Forward Pending |
| 71 |
Odisha |
Bhadrak |
Basudevpur |
Aruha |
Sri Siddharth Sankar Swain |
Director PR |
Improvement of road & culvert with side wall from gobindabindha road to PWD road Via- AWC Tulumtula upto Gobindabindha Vill- Gobindabindha |
60 days |
Forward Pending |
| 72 |
Odisha |
Kalahandi |
Thuamul Rampur |
Dumerpadar |
Sri Siddharth Sankar Swain |
Director PR |
REPAIR AND MAINT. OF ROAD FROM KUMARPADA TO UPERPADA |
59 days |
Forward Pending |
| 73 |
Odisha |
Kalahandi |
Thuamul Rampur |
Karlapat |
Sri Siddharth Sankar Swain |
Director PR |
REPAIR AND MAINT OF ROAD FROM JILAGAON TO BADTIKRAGUDA |
59 days |
Forward Pending |
| 74 |
Odisha |
Kalahandi |
Thuamul Rampur |
Birikot |
Sri Siddharth Sankar Swain |
Director PR |
REPAIR AND MAINT OF ROAD FROM BALANGI TO BADCHHATRANG |
59 days |
Forward Pending |
| 75 |
Odisha |
Kalahandi |
Thuamul Rampur |
Kiapadar |
Sri Siddharth Sankar Swain |
Director PR |
REPAIR AND MAINT OF ROAD AT DALGUMA |
59 days |
Forward Pending |
| 76 |
Odisha |
Kalahandi |
Junagarh |
Palash |
Sri Siddharth Sankar Swain |
Director PR |
Repair and Mainteance of CC road at G.Sargiguda |
59 days |
Forward Pending |
| 77 |
Odisha |
Kalahandi |
Junagarh |
Baladiamal |
Sri Siddharth Sankar Swain |
Director PR |
Repair and Mainteance of CC road at Baldiamal |
59 days |
Forward Pending |
| 78 |
Odisha |
Kalahandi |
Junagarh |
Budhipadar |
Sri Siddharth Sankar Swain |
Director PR |
Repair and Mainteance of road from Lakhanapada to Beheraguda |
59 days |
Forward Pending |
| 79 |
Odisha |
Kalahandi |
Junagarh |
Budhipadar |
Sri Siddharth Sankar Swain |
Director PR |
Repair and Mainteance of road from Lakhnapada to Bijaradara |
59 days |
Forward Pending |
| 80 |
Odisha |
Kalahandi |
Junagarh |
Dundeimal |
Sri Siddharth Sankar Swain |
Director PR |
Repair and Mainteance of cc road at Jilingdara Todua pada |
59 days |
Forward Pending |
| 81 |
Odisha |
Kalahandi |
Junagarh |
Chingudisar |
Sri Siddharth Sankar Swain |
Director PR |
Repair and Mainteance of cc road at Chingudisar |
59 days |
Forward Pending |
| 82 |
Odisha |
Kalahandi |
Jayapatna |
Jaipatna |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC road from Sujit Mund house to Tulu house |
59 days |
Forward Pending |
| 83 |
Odisha |
Kalahandi |
Jayapatna |
Jaipatna |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC road from Manmatha house to Khanjanti bandha |
59 days |
Forward Pending |
| 84 |
Odisha |
Kalahandi |
Jayapatna |
Bhainripali |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC Road at Bimla |
59 days |
Forward Pending |
| 85 |
Odisha |
Kalahandi |
Jayapatna |
Jaipatna |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC road from Gondapada School to Kharsel road |
59 days |
Forward Pending |
| 86 |
Odisha |
Kalahandi |
Jayapatna |
Dhansuli |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC road from Sahupada to Dhamarmunda |
59 days |
Forward Pending |
| 87 |
Odisha |
Kalahandi |
Jayapatna |
Dhansuli |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC road from Sadargudi to RD road |
59 days |
Forward Pending |
| 88 |
Odisha |
Kalahandi |
Jayapatna |
Badapujariguda |
Sri Siddharth Sankar Swain |
Director PR |
Const. of CC road at Badpujhariguda |
59 days |
Forward Pending |
| 89 |
Odisha |
Jajpur |
Jajpur |
Badasuar |
Sri Siddharth Sankar Swain |
Director PR |
BHARGABI SCHOOL ROAD |
12 days |
Forward Pending |