Final Dpr

State: Odisha District: Puri Block: Sadar Gram Panchayat: Gopinathpur
Work Code: OD/369/3545/121070/409901/00013589 (Improvement of Road from Ramachandra Pradhan House to Jitendra Padhi House at M M Nagar)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Sadar Bill Status: Final Bill
Proposal Date: 03-06-2023 Date of Commencement: 03-03-2025
Date of Completion: 06-05-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: Tapabanta Sahoo
Administrative Approval Details
Approval No.: OD/369/3545/121070/409901/00013589/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3545/121070/409901/00013589/TS
Fund Sanction No.: 11939
Fund Sanction Amount (in Rs.): 200000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. Cum 15.65022 6285.40400078 98367.955401087
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 12.51670254 7803.37320686 97672.501238873
Total Amount (in Rs.): 196040.45663996
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Skilled Un-Skilled
Rs. 552 Rs. 452
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 15.65022 Cubic Meter 3.9 61.035858 0.18 2.8170396
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 12.51670254 Cubic Meter 4.6 57.576831684 0.68 8.5113577272
Total Qty 11.3283973272 118.612689684
Rate Per Man Day 552 452
Total Amount 6253.2753246144 53612.935737168
Total Labour Amount (in Rs.): 59866.211061782
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 15.65022 Cum 2.29 35.8390038 0.48 7.5121056 0.96 15.0242112 - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 12.51670254 Cum 3.23 40.4289492042 0.45 5.632516143 - - 0.9 11.265032286
Total Qty 76.2679530042 13.144621743 15.0242112 11.265032286
Rate Per Unit 591.577 780.67 1984.91 2396.53
Total Amount 45118.366834366 10261.611856108 29821.707052992 26996.987824368
Total Material Amount (in Rs.): 112198.67356783
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 15.65022 Cum 2.29 35.8390038 0.48 7.5121056 0.96 15.0242112 - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 12.51670254 Cum 3.23 40.4289492042 0.45 5.632516143 - - 0.9 11.265032286
Total Qty 76.2679530042 13.144621743 15.0242112 11.265032286
Rate Per Unit 0 115.5 320 320
Total Amount 0 1518.2038113165 4807.747584 3604.81033152
Total Royalty Amount (in Rs.): 9930.7617268365
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 1959 Rs. 1959
2 Contingency @ Rs. 2000 Rs. 2000
Total Addition Component Amount (in Rs.): 3959
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 2000 Rs. 2000
2 Royalty @ Rs. 3877.663414185 Rs. 3877.663414185
3 Additional Royalty @ Rs. 5471.4488005237 Rs. 5471.4488005237
4 EMF @ Rs. 193.88317070925 Rs. 193.88317070925
5 DMF @ Rs. 387.7663414185 Rs. 387.7663414185
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 81 x 3.92) @ 599.76 Rs. 599.76
7 Labour Cess @ Rs. 2000 Rs. 2000
8 Any Other Lumpsum Bill @ Rs. 3999.99 Rs. 3999.99
Total Deduction Component Amount (in Rs.): 18530.511726836
Total Net Amount (in Rs.): 181468.94491312