Final Dpr

State: Odisha District: Ganjam Block: Beguniapada Gram Panchayat: Beruanbadi
Work Code: OD/354/3365/117597/411727/00017545 (REPAIR AND MAINTANANCE OF AWC BUILDING AT BERUNBADI 2)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Beguniapada Bill Status: Final Bill
Proposal Date: 03-12-2024 Date of Commencement: 03-06-2025
Date of Completion: 05-07-2025 Scheme Name: Asset Management Women and Child Development Department
Scheme Component Name: Self/Personal Deposit Project Sub-Category: AWC
Project Type: Repair and Maintenance Name of Executant: DHARMENDRA BADTYA
Administrative Approval Details
Approval No.: OD/354/3365/117597/411727/00017545/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3365/117597/411727/00017545/TS
Fund Sanction No.: 11574
Fund Sanction Amount (in Rs.): 45000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 190.9175 71.83753306751 13715.042219416
2 Painting (AR0901ai) : Priming one coat in outer surface with primer of approved quality over woodwork - Priming one coat in outer surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 91.085 70.08994432871 6384.1425791806
3 Painting (AR0922) : Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) Sqm 155.3775 78.8505283 12251.597960933
4 Painting (AR0918gk) : Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). Sqm 72.68 159.29727481428 11577.725933502
Total Amount (in Rs.): 43928.508693032
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Highly-Skilled Un-Skilled
Rs. 612 Rs. 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 190.9175 Square Meter 0.053763440860215 10.26438172043 0.053763440860215 10.26438172043
2 Painting (AR0901ai) : Priming one coat in outer surface with primer of approved quality over woodwork - Priming one coat in outer surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 91.085 Square Meter 0.053763440860215 4.8970430107527 0.053763440860215 4.8970430107527
3 Painting (AR0922) : Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 155.3775 Square Meter 0.062 9.633405 0.052 8.07963
4 Painting (AR0918gk) : Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 72.68 Square Meter 0.12011870967742 8.7302278193548 0.10991870967742 7.9888918193548
Total Qty 31.229946550538 33.525057550538
Rate Per Man Day 612 462
Total Amount 19112.727288929 15488.576588348
Total Labour Amount (in Rs.): 34601.303877277
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM253 BRM138 BRM142 BRM255 BRM252
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 190.9175 Sqm 0.084 16.03707 - - - - - - - -
2 Painting(AR0901ai) :.Priming one coat in outer surface with primer of approved quality over woodwork - Priming one coat in outer surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 91.085 Sqm - - 0.075 6.831375 - - - - - -
3 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 155.3775 Sqm - - - - 0.25 38.844375 - - - -
4 Painting(AR0918gk) :.Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 72.68 Sqm - - - - - - 0.125 9.085 0.084 6.10512
Total Qty 16.03707 6.831375 38.844375 9.085 6.10512
Rate Per Unit 159.33732 155.38732 70.40732 195.09732 125.80732
Total Amount 2555.3037544524 1061.509053165 2734.928340825 1772.4591522 768.0687854784
Total Material Amount (in Rs.): 8892.2690861208
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM253 BRM138 BRM142 BRM255 BRM252
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 190.9175 Sqm 0.084 16.03707 - - - - - - - -
2 Painting(AR0901ai) :.Priming one coat in outer surface with primer of approved quality over woodwork - Priming one coat in outer surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 91.085 Sqm - - 0.075 6.831375 - - - - - -
3 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 155.3775 Sqm - - - - 0.25 38.844375 - - - -
4 Painting(AR0918gk) :.Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 72.68 Sqm - - - - - - 0.125 9.085 0.084 6.10512
Total Qty 16.03707 6.831375 38.844375 9.085 6.10512
Rate Per Unit 0 0 0 0 0
Total Amount 0 0 0 0 0
Total Royalty Amount (in Rs.): 0
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 1071 Rs. 1071
Total Addition Component Amount (in Rs.): 1071
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Labour Cess @ Rs. 450 Rs. 450
Total Deduction Component Amount (in Rs.): 450
Total Net Amount (in Rs.): 44549.508693032