| State: Odisha |
District: Kendujhar |
Block: Bansapal |
Gram Panchayat: Kuanr |
Work Code: OD/361/3444/119273/386317/00027551 (Maintenance Of Talapada Pry. School)
Project Category: Building
| Financial Year: 2024-25 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Bansapal |
Bill Status:
Final Bill
|
| Proposal Date: - |
Date of Commencement: 20-09-2025 |
| Date of Completion: 02-11-2025 |
Scheme Name: 5th SFC Grant in Aid |
| Scheme Component Name: Maintenance of Primary School Building |
Project Sub-Category: Elementary School |
| Project Type: Repair and Maintenance |
Name of Executant: RAJALAXMI SINGH |
Administrative Approval Details
Approval No.: OD/361/3444/119273/386317/00027551/AS
Technical Sanction Details
Technical Sanction No.: OD/361/3444/119273/386317/00027551/TS
Fund Sanction No.: 28923
Fund Sanction Amount (in Rs.): 250000
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
Dismantling (AR1612) : Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge.
|
Sqm |
62.2816044917 |
100.34838709677 |
6249.858556541 |
| 2 |
Other Building Items. (AR1901Ba) : Vitrified Tile 600mmx600mm Coloured /Printed - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Coloured /Printed series(Homogeneous) in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge.
|
Sqm |
86.4489263967 |
1092.9502632754 |
94484.376865149 |
| 3 |
Flooring (AR0817aa) : Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles.
|
Sqm |
5.0070629268 |
1564.822669861 |
7835.1655772772 |
| 4 |
Plastering (AR1027) : 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge.
|
Sqm |
20.1002050807 |
201.4743745072 |
4049.6762461005 |
| 5 |
Painting (AR0901dk) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface)(For repair and maintenance) . - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge(For repair and maintenance).
|
Sqm |
437.5419053017 |
73.024095116284 |
31951.101710111 |
| 6 |
Painting (AR0901dik) : Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces (outer surface )(For repair and maintenance) . - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge(For repair and maintenance).
|
Sqm |
238.4624356282 |
74.043110947097 |
17656.500577934 |
| 7 |
Painting (AR0922k) : Finishing wall two coats with distemper of approved shades on new work (Inside)(For repair and maintenance). - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For Repair and maintenance)
|
Sqm |
435.1032015517 |
80.1320264 |
34865.701233465 |
| 8 |
Painting (AR0918fk) : Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance).
|
Sqm |
228.2749527766 |
89.1680621 |
20354.835165058 |
| 9 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
11.00165587856 |
1203.175832 |
13236.926465064 |
| 10 |
Painting (AR0903b) : Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.
|
Sqm |
69.410153875 |
230.39719814803 |
15991.904975824 |
Total Amount (in Rs.): 246676.04737252
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Highly-Skilled
|
Semi-Skilled
|
Skilled
|
| Rs. 462 |
Rs. 612 |
Rs. 512 |
Rs. 562 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Dismantling (AR1612) : Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge.
|
62.2816044917 |
Square Meter |
0.21505376344086 |
13.393893439075 |
- |
- |
- |
- |
- |
- |
| 2 |
Other Building Items. (AR1901Ba) : Vitrified Tile 600mmx600mm Coloured /Printed - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Coloured /Printed series(Homogeneous) in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge.
|
86.4489263967 |
Square Meter |
0.216 |
18.672968101687 |
- |
- |
- |
- |
0.216 |
18.672968101687 |
| 3 |
Flooring (AR0817aa) : Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles.
|
5.0070629268 |
Square Meter |
0.325 |
1.62729545121 |
0.76 |
3.805367824368 |
- |
- |
0.325 |
1.62729545121 |
| 4 |
Plastering (AR1027) : 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge.
|
20.1002050807 |
Square Meter |
0.17 |
3.417034863719 |
- |
- |
0.14 |
2.814028711298 |
- |
- |
| 5 |
Painting (AR0901dk) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface)(For repair and maintenance) . - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge(For repair and maintenance).
|
437.5419053017 |
Square Meter |
0.054838709677419 |
23.994233516545 |
- |
- |
- |
- |
0.054838709677419 |
23.994233516545 |
| 6 |
Painting (AR0901dik) : Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces (outer surface )(For repair and maintenance) . - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge(For repair and maintenance).
|
238.4624356282 |
Square Meter |
0.054838709677419 |
13.076972276385 |
- |
- |
- |
- |
0.054838709677419 |
13.076972276385 |
| 7 |
Painting (AR0922k) : Finishing wall two coats with distemper of approved shades on new work (Inside)(For repair and maintenance). - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For Repair and maintenance)
|
435.1032015517 |
Square Meter |
0.06324 |
27.51592646613 |
- |
- |
- |
- |
0.05304 |
23.077873810302 |
| 8 |
Painting (AR0918fk) : Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance).
|
228.2749527766 |
Square Meter |
0.06528 |
14.901788917256 |
- |
- |
- |
- |
0.05508 |
12.573384398935 |
| 9 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
11.00165587856 |
Cubic Meter |
0.1236 |
1.35980466659 |
- |
- |
- |
- |
- |
- |
| 10 |
Painting (AR0903b) : Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.
|
69.410153875 |
Square Meter |
0.17204301075269 |
11.941531849462 |
- |
- |
- |
- |
0.18817204301075 |
13.061050460349 |
| Total Qty |
129.90144954806 |
106.08377801541 |
3.805367824368 |
2.814028711298 |
| Rate Per Man Day |
462 |
612 |
512 |
562 |
| Total Amount |
60014.469691204 |
64923.272145433 |
1948.3483260764 |
1581.4841357495 |
Total Labour Amount (in Rs.): 128467.57429846
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM132 |
BRM174 |
BRM340 |
BRM028 |
BRM131 |
BRMMR0027 |
BRM253 |
BRM142 |
BRM255 |
BRM029 |
BRM137 |
BRM141 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Dismantling (AR1612) :.Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. |
62.2816044917 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Other Building Items. (AR1901Ba) :.Vitrified Tile 600mmx600mm Coloured /Printed - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Coloured /Printed series(Homogeneous) in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge. |
86.4489263967 |
Sqm |
1 |
86.4489263967 |
0.0076 |
0.65701184061492 |
0.1074 |
9.2846146950056 |
0.021 |
1.8154274543307 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. |
5.0070629268 |
Sqm |
- |
- |
- |
- |
0.1375 |
0.688471152435 |
0.015 |
0.075105943902 |
1 |
5.0070629268 |
1 |
5.0070629268 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. |
20.1002050807 |
Sqm |
- |
- |
- |
- |
0.0372 |
0.74772762900204 |
0.0075 |
0.15075153810525 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 5 |
Painting(AR0901dk) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface)(For repair and maintenance) . - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge(For repair and maintenance). |
437.5419053017 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.084 |
36.753520045343 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 6 |
Painting(AR0901dik) :.Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces (outer surface )(For repair and maintenance) . - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge(For repair and maintenance). |
238.4624356282 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.090322580645161 |
21.53854257287 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 7 |
Painting(AR0922k) :.Finishing wall two coats with distemper of approved shades on new work (Inside)(For repair and maintenance). - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For Repair and maintenance) |
435.1032015517 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.25 |
108.77580038793 |
- |
- |
- |
- |
- |
- |
- |
- |
| 8 |
Painting(AR0918fk) :.Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). |
228.2749527766 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.125 |
28.534369097075 |
- |
- |
- |
- |
- |
- |
| 9 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
11.00165587856 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
11.00165587856 |
- |
- |
- |
- |
| 10 |
Painting(AR0903b) :.Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. |
69.410153875 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.054 |
3.74814830925 |
0.125 |
8.676269234375 |
| Total Qty |
86.4489263967 |
0.65701184061492 |
10.720813476443 |
2.0412849363379 |
5.0070629268 |
5.0070629268 |
58.292062618212 |
108.77580038793 |
28.534369097075 |
11.00165587856 |
3.74814830925 |
8.676269234375 |
| Rate Per Unit |
713.5430561 |
2071.692 |
622.032 |
1570.91 |
668.8630561 |
8.5 |
159.57512 |
70.64512 |
195.33512 |
1008.91 |
143.24512 |
205.88512 |
| Total Amount |
61685.031137665 |
1361.1261741072 |
6668.6890483786 |
3206.6749193426 |
3349.0394113045 |
42.5600348778 |
9301.9628873488 |
7684.479471501 |
5573.7644117014 |
11099.680632438 |
536.90395433631 |
1786.3147324716 |
Total Material Amount (in Rs.): 112296.22681547
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM132 |
BRM174 |
BRM340 |
BRM028 |
BRM131 |
BRM253 |
BRM142 |
BRM255 |
BRM029 |
BRM137 |
BRM141 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Dismantling (AR1612) :.Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. |
62.2816044917 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Other Building Items. (AR1901Ba) :.Vitrified Tile 600mmx600mm Coloured /Printed - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Coloured /Printed series(Homogeneous) in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge. |
86.4489263967 |
Sqm |
1 |
86.4489263967 |
0.0076 |
0.65701184061492 |
0.1074 |
9.2846146950056 |
0.021 |
1.8154274543307 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. |
5.0070629268 |
Sqm |
- |
- |
- |
- |
0.1375 |
0.688471152435 |
0.015 |
0.075105943902 |
1 |
5.0070629268 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. |
20.1002050807 |
Sqm |
- |
- |
- |
- |
0.0372 |
0.74772762900204 |
0.0075 |
0.15075153810525 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 5 |
Painting(AR0901dk) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface)(For repair and maintenance) . - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge(For repair and maintenance). |
437.5419053017 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.084 |
36.753520045343 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 6 |
Painting(AR0901dik) :.Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces (outer surface )(For repair and maintenance) . - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge(For repair and maintenance). |
238.4624356282 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.090322580645161 |
21.53854257287 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 7 |
Painting(AR0922k) :.Finishing wall two coats with distemper of approved shades on new work (Inside)(For repair and maintenance). - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For Repair and maintenance) |
435.1032015517 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.25 |
108.77580038793 |
- |
- |
- |
- |
- |
- |
- |
- |
| 8 |
Painting(AR0918fk) :.Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). |
228.2749527766 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.125 |
28.534369097075 |
- |
- |
- |
- |
- |
- |
| 9 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
11.00165587856 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
1 |
11.00165587856 |
- |
- |
- |
- |
| 10 |
Painting(AR0903b) :.Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. |
69.410153875 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.054 |
3.74814830925 |
0.125 |
8.676269234375 |
| Total Qty |
86.4489263967 |
0.65701184061492 |
10.720813476443 |
2.0412849363379 |
5.0070629268 |
58.292062618212 |
108.77580038793 |
28.534369097075 |
11.00165587856 |
3.74814830925 |
8.676269234375 |
| Rate Per Unit |
0 |
0 |
0 |
190.25 |
0 |
0 |
0 |
0 |
125.25 |
0 |
0 |
| Total Amount |
0 |
0 |
0 |
388.35445913829 |
0 |
0 |
0 |
0 |
1377.9573987896 |
0 |
0 |
Total Royalty Amount (in Rs.): 1766.3118579279
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Display Citizen Board @
Rs. 856
|
Rs. 856 |
| 2 |
Contingency @
1%
|
Rs. 2466.7604737252 |
Total Addition Component Amount (in Rs.): 3322.7604737252
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| 1 |
Contingency @
1%
|
Rs. 2499.9880784625 |
| 2 |
Royalty @
Rs. 456.50292852143
|
Rs. 456.50292852143 |
| 3 |
Additional Royalty @
Rs. 1241.3334901283
|
Rs. 1241.3334901283 |
| 4 |
EMF @
Rs. 22.825146426071
|
Rs. 22.825146426071 |
| 5 |
DMF @
Rs. 45.650292852143
|
Rs. 45.650292852143 |
| 6 |
Labour Cess @
1%
|
Rs. 2499.9880784625 |
| 7 |
Any Other Lumpsum Bill @
Rs. 5076
|
Rs. 5076 |
Total Deduction Component Amount (in Rs.): 11842.288014853
Total Net Amount (in Rs.): 238156.5198314