Final Dpr

State: Odisha District: Puri Block: Gop Gram Panchayat: Itibhuan
Work Code: OD/369/3539/120943/409518/00031585 (Road From Podatara Mb Road To Bijaya Behera House)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Gop Bill Status: Final Bill
Proposal Date: 24-06-2024 Date of Commencement: 28-07-2025
Date of Completion: 08-08-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Suresh Puspalak
Administrative Approval Details
Approval No.: OD/369/3539/120943/409518/00031585/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3539/120943/409518/00031585/TS
Fund Sanction No.: 150000
Fund Sanction Amount (in Rs.): 150000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 11.5 216.23489289764 2486.7012683229
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 17.8 8173.54426484 145489.08791415
Total Amount (in Rs.): 147975.78918247
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Semi-Skilled Skilled Un-Skilled
Rs. 512 Rs. 562 Rs. 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 11.5 Square Meter - - 0.05 0.575 0.05 0.575
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 17.8 Cubic Meter 4.6 81.88 - - 0.68 12.104
Total Qty 0.575 12.679 81.88
Rate Per Man Day 512 562 462
Total Amount 294.4 7125.598 37828.56
Total Labour Amount (in Rs.): 45248.558
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 11.5 Sqm 0.00267 0.030705 0.126 1.449 - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 17.8 Cum - - - - 3.23 57.494 0.45 8.01 0.9 16.02
Total Qty 0.030705 1.449 57.494 8.01 16.02
Rate Per Unit 58573.086 229.106 598.442 780.67 2580.53
Total Amount 1798.48660563 331.974594 34406.824348 6253.1667 41340.0906
Total Material Amount (in Rs.): 84130.54284763
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 11.5 Sqm 0.00267 0.030705 0.000614 0.007061 - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 17.8 Cum - - - - 3.23 57.494 0.45 8.01 0.9 16.02
Total Qty 0.030705 0.007061 57.494 8.01 16.02
Rate Per Unit 0 0 0 115.5 459
Total Amount 0 0 0 925.155 7353.18
Total Royalty Amount (in Rs.): 8278.335
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 500 Rs. 500
2 Contingency @ Rs. 1500 Rs. 1500
Total Addition Component Amount (in Rs.): 2000
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 1500 Rs. 1500
2 Royalty @ Rs. 2362.95 Rs. 2362.95
3 Additional Royalty @ Rs. 5560.9425 Rs. 5560.9425
4 EMF @ Rs. 118.1475 Rs. 118.1475
5 DMF @ Rs. 236.295 Rs. 236.295
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 115 x 3.92) @ 450.8 Rs. 450.8
7 Labour Cess @ Rs. 1500 Rs. 1500
Total Deduction Component Amount (in Rs.): 11729.135
Total Net Amount (in Rs.): 138246.65418247