Final Dpr

State: Odisha District: Ganjam Block: Chikiti Gram Panchayat: Kalabada
Work Code: OD/354/3370/117696/413076/00038798 (Completion of incomplete Kalyan Mandap at Chiladi)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Chikiti Bill Status: Final Bill
Proposal Date: 21-05-2025 Date of Commencement: 01-12-2025
Date of Completion: 22-12-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO ZILLA PARISHAD Project Sub-Category: Kalyan Mandap
Project Type: Upgradation or Improvement Name of Executant: RASMITA KUMARI DAS
Administrative Approval Details
Approval No.: OD/354/3370/117696/413076/00038798/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3370/117696/413076/00038798/TS
Fund Sanction No.: 6911
Fund Sanction Amount (in Rs.): 200000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Painting (AR0917d) : Finishing wall with one coat water proofing cement paint including two coats cement wash on the inner surface of approved shade on old work(Inside) - Finishing wall with one coat water proofing cement paint including two coats cement wash on the inner surface of approved shade on old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Inside) Sqm 1138.66 53.207966216157 60585.782811689
2 Painting (AR0918f) : Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside) - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) Sqm 1116.7 87.8656910875 98119.617237411
3 Painting (AR0901a) : Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 32.56 70.08544099121 2281.9819586738
Total Amount (in Rs.): 160987.38200777
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Highly-Skilled Un-Skilled Skilled
Rs. 612 Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Painting (AR0917d) : Finishing wall with one coat water proofing cement paint including two coats cement wash on the inner surface of approved shade on old work(Inside) - Finishing wall with one coat water proofing cement paint including two coats cement wash on the inner surface of approved shade on old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Inside) 1138.66 Square Meter 0.03952688172043 45.007679139785 0.010752688172043 12.243655913978 0.015 17.0799
2 Painting (AR0918f) : Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside) - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 1116.7 Square Meter 0.064 71.4688 - - 0.054 60.3018
3 Painting (AR0901a) : Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 32.56 Square Meter 0.053763440860215 1.7505376344086 - - 0.053763440860215 1.7505376344086
Total Qty 79.132237634409 118.22701677419 12.243655913978
Rate Per Man Day 612 462 562
Total Amount 48428.929432258 54620.881749677 6880.9346236559
Total Labour Amount (in Rs.): 109930.74580559
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM143 BRM340 BRM255 BRM138
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0917d) :.Finishing wall with one coat water proofing cement paint including two coats cement wash on the inner surface of approved shade on old work(Inside) - Finishing wall with one coat water proofing cement paint including two coats cement wash on the inner surface of approved shade on old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Inside) 1138.66 Sqm 0.166 189.01756 0.016145161290323 18.383849354839 - - - -
2 Painting(AR0918f) :.Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside) - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 1116.7 Sqm - - - - 0.125 139.5875 - -
3 Painting(AR0901a) :.Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 32.56 Sqm - - - - - - 0.075 2.442
Total Qty 189.01756 18.383849354839 139.5875 2.442
Rate Per Unit 48.07787 592.497 195.03787 155.32787
Total Amount 9087.5616773972 10892.375591194 27224.848678625 379.31065854
Total Material Amount (in Rs.): 47584.096605756
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM143 BRM340 BRM255 BRM138
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0917d) :.Finishing wall with one coat water proofing cement paint including two coats cement wash on the inner surface of approved shade on old work(Inside) - Finishing wall with one coat water proofing cement paint including two coats cement wash on the inner surface of approved shade on old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Inside) 1138.66 Sqm 0.166 189.01756 0.016145161290323 18.383849354839 - - - -
2 Painting(AR0918f) :.Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside) - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 1116.7 Sqm - - - - 0.125 139.5875 - -
3 Painting(AR0901a) :.Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 32.56 Sqm - - - - - - 0.075 2.442
Total Qty 189.01756 18.383849354839 139.5875 2.442
Rate Per Unit 0 0 0 0
Total Amount 0 0 0 0
Total Royalty Amount (in Rs.): 0
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 500 Rs. 500
2 Contingency @ Rs. 2000 Rs. 2000
Total Addition Component Amount (in Rs.): 2500
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ Rs. 2000 Rs. 2000
2 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 145.965 Rs. 145.965
3 Labour Cess @ Rs. 2000 Rs. 2000
4 Any Other Lumpsum Bill @ Rs. 5853.9 Rs. 5853.9
Total Deduction Component Amount (in Rs.): 9999.865
Total Net Amount (in Rs.): 153487.51700777