Final Dpr

State: Odisha District: Jajpur Block: Binjharpur Gram Panchayat: Kapila
Work Code: OD/356/3396/118316/401937/00047164 (Impvt. of road with CC/GR-II metaling from Samal sahi to Barik sahi, Guhali)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Binjharpur Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 21-08-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: SISIRA SEKHAR NAYAK
Administrative Approval Details
Approval No.: OD/356/3396/118316/401937/00047164/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3396/118316/401937/00047164/TS
Fund Sanction No.: 1130
Fund Sanction Amount (in Rs.): 400000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 46.735037499099 8389.72865232 392094.28317344
Total Amount (in Rs.): 392094.28317344
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 46.735037499099 Cubic Meter 4.6 214.98117249586 0.68 31.779825499387
Total Qty 214.98117249586 31.779825499387
Rate Per Man Day 462 562
Total Amount 99321.301693085 17860.261930656
Total Labour Amount (in Rs.): 117181.56362374
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 46.735037499099 Cum 3.23 150.95417112209 0.45 21.030766874595 0.9 42.061533749189
Total Qty 150.95417112209 21.030766874595 42.061533749189
Rate Per Unit 577.612 938.79 2708.31
Total Amount 87192.940690173 19743.473634201 113915.67246827
Total Material Amount (in Rs.): 220852.08679264
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 46.735037499099 Cum 3.23 150.95417112209 0.45 21.030766874595 0.9 42.061533749189
Total Qty 150.95417112209 21.030766874595 42.061533749189
Rate Per Unit 0 309.35 488.75
Total Amount 0 6505.8677326558 20557.574619916
Total Royalty Amount (in Rs.): 27063.442352572
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 1500 Rs. 1500
2 Any Other Lumpsum @ Rs. 2484.7 Rs. 2484.7
3 Contingency @ 1% Rs. 3920.9428317344
Total Addition Component Amount (in Rs.): 7905.6428317344
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Contingency @ 1% Rs. 3999.9992600517
2 Royalty @ Rs. 6204.0762280054 Rs. 6204.0762280054
3 Additional Royalty @ Rs. 19928.754690366 Rs. 19928.754690366
4 EMF @ Rs. 310.20381140027 Rs. 310.20381140027
5 DMF @ Rs. 620.40762280054 Rs. 620.40762280054
6 Empty Gunny Bag (Cement x Gunny Bag Rate : 302 x 3.945) @ 1191.39 Rs. 1191.39
7 Labour Cess @ 1% Rs. 3999.9992600517
8 Any Other Lumpsum Bill @ 2% Rs. 7999.9985201035
Total Deduction Component Amount (in Rs.): 44254.829392779
Total Net Amount (in Rs.): 355745.0966124