| State: Odisha |
District: Kalahandi |
Block: Madanpur Rampur |
Gram Panchayat: M.Rampur |
Work Code: OD/358/3419/118814/422708/00055148 (CONSTRUTION OF CC ROAD AND DRAIN FROM LALU BARIK GALI TO HARI HAR SAGAR, M.RAMPUR. CR NO- 11/23-24)
Project Category: Road
| Financial Year: 2023-24 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Madanpur Rampur |
Bill Status:
Final Bill
|
| Proposal Date: - |
Date of Commencement: 22-09-2025 |
| Date of Completion: 23-09-2025 |
Scheme Name: 5th SFC Grant in Aid |
| Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES |
Project Sub-Category: CC Road |
| Project Type: New Work |
Name of Executant: JE NAYAN |
Administrative Approval Details
Approval No.: OD/358/3419/118814/422708/00055148/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3419/118814/422708/00055148/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 200000
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
Sqm |
24 |
216.23489289764 |
5189.6374295434 |
| 2 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
8 |
623.678232 |
4989.425856 |
| 3 |
Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
Cum |
21.85 |
5581.50398166 |
121955.86199927 |
Total Amount (in Rs.): 132134.92528481
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Semi-Skilled
|
Skilled
|
Un-Skilled
|
| Rs. 512 |
Rs. 562 |
Rs. 462 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
24 |
Square Meter |
- |
- |
0.05 |
1.2 |
0.05 |
1.2 |
| 2 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
8 |
Cubic Meter |
0.1236 |
0.9888 |
- |
- |
- |
- |
| 3 |
Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
21.85 |
Cubic Meter |
3.9 |
85.215 |
- |
- |
0.18 |
3.933 |
| Total Qty |
1.2 |
5.133 |
86.2038 |
| Rate Per Man Day |
512 |
562 |
462 |
| Total Amount |
614.4 |
2884.746 |
39826.1556 |
Total Labour Amount (in Rs.): 43325.3016
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM104 |
BRM092 |
BRM029 |
BRM340 |
BRM028 |
BRM045 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
24 |
Sqm |
0.00267 |
0.06408 |
0.126 |
3.024 |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
8 |
Cum |
- |
- |
- |
- |
1 |
8 |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
21.85 |
Cum |
- |
- |
- |
- |
- |
- |
2.29 |
50.0365 |
0.48 |
10.488 |
0.96 |
20.976 |
| Total Qty |
0.06408 |
3.024 |
8 |
50.0365 |
10.488 |
20.976 |
| Rate Per Unit |
58573.086 |
229.106 |
478.15 |
642.071 |
483.09 |
1323.77 |
| Total Amount |
3753.36335088 |
692.816544 |
3825.2 |
32126.9855915 |
5066.64792 |
27767.39952 |
Total Material Amount (in Rs.): 73232.41292638
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM104 |
BRM092 |
BRM029 |
BRM340 |
BRM028 |
BRM045 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
24 |
Sqm |
0.00267 |
0.06408 |
0.000614 |
0.014736 |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
8 |
Cum |
- |
- |
- |
- |
1 |
8 |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
21.85 |
Cum |
- |
- |
- |
- |
- |
- |
2.29 |
50.0365 |
0.48 |
10.488 |
0.96 |
20.976 |
| Total Qty |
0.06408 |
0.014736 |
8 |
50.0365 |
10.488 |
20.976 |
| Rate Per Unit |
0 |
0 |
82.25 |
0 |
82.25 |
252.5 |
| Total Amount |
0 |
0 |
658 |
0 |
862.638 |
5296.44 |
Total Royalty Amount (in Rs.): 6817.078
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Display Citizen Board @
Rs. 2164
|
Rs. 2164 |
| 2 |
Any Other Lumpsum @
Rs. 2506
|
Rs. 2506 |
| 3 |
Contingency @
Rs. 2000
|
Rs. 2000 |
Total Addition Component Amount (in Rs.): 6670
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| 1 |
Contingency @
Rs. 2000
|
Rs. 2000 |
| 2 |
Royalty @
Rs. 3373.96
|
Rs. 3373.96 |
| 3 |
Additional Royalty @
Rs. 2937.024
|
Rs. 2937.024 |
| 4 |
EMF @
Rs. 168.698
|
Rs. 168.698 |
| 5 |
DMF @
Rs. 337.396
|
Rs. 337.396 |
| 6 |
Empty Gunny Bag (Cement x Gunny Bag Rate : 101 x 3.945) @ 398.445
|
Rs. 398.445 |
| 7 |
Labour Cess @
Rs. 2000
|
Rs. 2000 |
| 8 |
Any Other Lumpsum Bill @
Rs. 579.22
|
Rs. 579.22 |
Total Deduction Component Amount (in Rs.): 11794.743
Total Net Amount (in Rs.): 127010.18228481