Final Dpr

State: Odisha District: Jajpur Block: Korei Gram Panchayat: Tarakot
Work Code: OD/356/3401/275233/400771/00067294 (Repair and restoration of Tarapada Primary school,Tarapada ,Tarakote)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Korei Bill Status: Final Bill
Proposal Date: - Date of Commencement: 04-12-2025
Date of Completion: 16-12-2025 Scheme Name: Severe Cyclonic Storm DANA 2024
Scheme Component Name: Self/Personal Deposit Project Sub-Category: Elementary School
Project Type: Repair and Maintenance Name of Executant: Bijay Kumar Nayak
Administrative Approval Details
Approval No.: OD/356/3401/275233/400771/00067294/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3401/275233/400771/00067294/TS
Fund Sanction No.: 6137
Fund Sanction Amount (in Rs.): 200000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Dismantling (AR1612) : Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. Sqm 107.15 100.34838709677 10752.329677419
2 Other Building Items. (AR1901Ba) : Vitrified Tile 600mmx600mm Coloured /Printed - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Coloured /Printed series(Homogeneous) in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge. Sqm 117.77 1047.7735154626 123396.28691603
3 miscellaneous (ARM122) : Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. - Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. Sqm 382.09 5.12 1956.3008
4 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 382.04 71.54653186751 27333.637034664
5 Painting (AR0918fk) : Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). Sqm 382.04 88.91205235 33967.960479794
Total Amount (in Rs.): 197406.51490791
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Highly-Skilled
Rs. 462 Rs. 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Dismantling (AR1612) : Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 107.15 Square Meter 0.21505376344086 23.043010752688 - -
2 Other Building Items. (AR1901Ba) : Vitrified Tile 600mmx600mm Coloured /Printed - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Coloured /Printed series(Homogeneous) in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge. 117.77 Square Meter 0.216 25.43832 0.216 25.43832
4 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 382.04 Square Meter 0.053763440860215 20.539784946237 0.053763440860215 20.539784946237
5 Painting (AR0918fk) : Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 382.04 Square Meter 0.06528 24.9395712 0.05508 21.0427632
Total Qty 93.960686898925 67.020868146237
Rate Per Man Day 462 612
Total Amount 43409.837347303 41016.771305497
Total Labour Amount (in Rs.): 84426.6086528
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM132 BRM174 BRM340 BRM028 BRMM122 BRM253 BRM255
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Dismantling (AR1612) :.Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 107.15 Sqm - - - - - - - - - - - - - -
2 Other Building Items. (AR1901Ba) :.Vitrified Tile 600mmx600mm Coloured /Printed - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Coloured /Printed series(Homogeneous) in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge. 117.77 Sqm 1 117.77 0.0076 0.895052 0.1074 12.648498 0.021 2.47317 - - - - - -
3 miscellaneous(ARM122) :.Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. - Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. 382.09 Sqm - - - - - - - - 1 382.09 - - - -
4 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 382.04 Sqm - - - - - - - - - - 0.084 32.09136 - -
5 Painting(AR0918fk) :.Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 382.04 Sqm - - - - - - - - - - - - 0.125 47.755
Total Qty 117.77 0.895052 12.648498 2.47317 382.09 32.09136 47.755
Rate Per Unit 700.4375001 2036.732 574.612 548.19 5.12 155.90732 193.30732
Total Amount 82490.524386777 1822.981050064 7267.978732776 1355.7670623 1956.3008 5003.2779327552 9231.3910666
Total Material Amount (in Rs.): 109128.22103127
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM132 BRM174 BRM340 BRM028 BRM253 BRM255
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Dismantling (AR1612) :.Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 107.15 Sqm - - - - - - - - - - - -
2 Other Building Items. (AR1901Ba) :.Vitrified Tile 600mmx600mm Coloured /Printed - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Coloured /Printed series(Homogeneous) in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge. 117.77 Sqm 1 117.77 0.0076 0.895052 0.1074 12.648498 0.021 2.47317 - - - -
3 miscellaneous(ARM122) :.Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. - Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height (Painting) and as directed by Engineer-in-Charge. 382.09 Sqm - - - - - - - - - - - -
4 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 382.04 Sqm - - - - - - - - 0.084 32.09136 - -
5 Painting(AR0918fk) :.Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 382.04 Sqm - - - - - - - - - - 0.125 47.755
Total Qty 117.77 0.895052 12.648498 2.47317 32.09136 47.755
Rate Per Unit 0 0 0 274.25 0 0
Total Amount 0 0 0 678.2668725 0 0
Total Royalty Amount (in Rs.): 678.2668725
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 2000 Rs. 2000
Total Addition Component Amount (in Rs.): 2000
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
1 Royalty @ Rs. 86.56095 Rs. 86.56095
2 Additional Royalty @ Rs. 578.72178 Rs. 578.72178
3 EMF @ Rs. 4.3280475 Rs. 4.3280475
4 DMF @ Rs. 8.656095 Rs. 8.656095
5 Empty Gunny Bag (Cement x Gunny Bag Rate : 0 x 3.945) @ 102.57 Rs. 102.57
6 Labour Cess @ 1% Rs. 1994.0651490791
7 Any Other Lumpsum Bill @ 2% Rs. 3988.1302981582
Total Deduction Component Amount (in Rs.): 6763.0323197373
Total Net Amount (in Rs.): 192643.48258817