Labour Statement

State: Odisha District: Gajapati Block: Gosani Gram Panchayat: Labanyagada
Work Code: OD/353/3357/117450/414950/00013371 (Improvement of road with CC/Gr.II Metalling from main road to river icw MGNREGS of GP Labanyagada)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Gosani Bill Status: Final Bill
Proposal Date: 16-02-2024 Date of Commencement: 16-01-2025
Date of Completion: 27-03-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: MAMATA KUMARI SWAIN
Administrative Approval Details
Approval No.: OD/353/3357/117450/414950/00013371/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3357/117450/414950/00013371/TS
Fund Sanction No.: 3781
Fund Sanction Amount (in Rs.): 500000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 452 Rs. 552 Rs. 502
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 27.027 Cubic Meter 0.1236 3.3405372 - - - -
2 Earth Work (AR0103aa) : Earthwork in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume in foundation and plinth within 50m. Initial lead and 1.5m - Earthwork in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume in foundation and plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department 91 Cubic Meter 0.80472 73.22952 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 33.75 Cubic Meter 3.9 131.625 - - 0.18 6.075
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 216 Square Meter - - 0.05 10.8 0.05 10.8
Total Qty 208.1950572 16.875 10.8
Rate Per Man Day 452 552 502
Total Amount 94104.1658544 9315 5421.6
Total Labour Amount (in Rs.): 108840.7658544