| State: Odisha |
District: Nayagarh |
Block: Nayagarh |
Gram Panchayat: Champatipur |
Work Code: OD/367/3527/120660/406280/00014227 (CONST OF ROAD & CULVERT CHAMPATIPUR NEAR MAHIMA ASHRAM SCHOOL)
Project Category: Road
| Financial Year: 2021-22 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Nayagarh |
Bill Status:
1st Bill
|
| Proposal Date: 17-11-2023 |
Date of Commencement: 27-04-2025 |
| Date of Completion: - |
Scheme Name: 5th SFC Grant in Aid |
| Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES |
Project Sub-Category: CC Road |
| Project Type: New Work |
Name of Executant: Jyotishree Subudhi |
Administrative Approval Details
Approval No.: OD/367/3527/120660/406280/00014227/AS
Technical Sanction Details
Technical Sanction No.: OD/367/3527/120660/406280/00014227/TS
Fund Sanction No.: 446
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Skilled
|
| Rs. 452 |
Rs. 552 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
11.25 |
Cubic Meter |
0.1236 |
1.3905 |
- |
- |
| 2 |
Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
11.25 |
Cubic Meter |
3.9 |
43.875 |
0.18 |
2.025 |
| 3 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
11.2338 |
Cubic Meter |
4.6 |
51.67548 |
0.68 |
7.638984 |
| Total Qty |
96.94098 |
9.663984 |
| Rate Per Man Day |
452 |
552 |
| Total Amount |
43817.32296 |
5334.519168 |
Total Labour Amount (in Rs.): 49151.842128