Labour Statement

State: Odisha District: Bargarh Block: Bargarh Gram Panchayat: Kalapani
Work Code: OD/347/3312/116382/380604/00016967 (IMPROVEMENT/COMPLETION OF KALYAN MANDAP AT KALAPANI)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Bargarh Bill Status: 2nd Bill
Proposal Date: - Date of Commencement: 04-04-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance of Capital Assets Project Sub-Category: Kalyan Mandap
Project Type: Upgradation or Improvement Name of Executant: RANJAN KUMAR NAYAK
Administrative Approval Details
Approval No.: OD/347/3312/116382/380604/00016967/AS
Technical Sanction Details
Technical Sanction No.: OD/347/3312/116382/380604/00016967/TS
Fund Sanction No.: 28960
Fund Sanction Amount (in Rs.): 1000000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled Semi-Skilled
Rs. 452 Rs. 552 Rs. 602 Rs. 502
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 112.446 Cubic Meter 0.1236 13.8983256 - - - - - -
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 3.5814 Cubic Meter 3.9 13.96746 - - 0.18 0.644652 - -
3 R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 7.5 Quintal 0.8 6 0.044 0.33 - - 0.3 2.25
4 R.C.C. Work (AR0404Bb) : Reinforced cement concrete work of M-20 grade with 20mm & downgrade size black hard crusher broken granite chips(RCC Plinth band)(Nominal mix as per IS-456, Table-9). - Reinforced cement concrete work of M-20 grade with 20mm & downgrade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band)(Nominal mix as per IS-456, Table-9).. 6.2514 Cubic Meter 1.3333 8.33499162 0.3073 1.92105522 0.35 2.18799 - -
5 Masonry Brick Work (AR0603c) : Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 8.76792 Cubic Meter 2.96 25.9530432 - - 1.05 9.206316 0.35 3.068772
Total Qty 68.15382042 12.038958 5.318772 2.25105522
Rate Per Man Day 452 552 602 502
Total Amount 30805.52682984 6645.504816 3201.900744 1130.02972044
Total Labour Amount (in Rs.): 41782.96211028