Labour Statement

State: Odisha District: Ganjam Block: Hinjilicut Gram Panchayat: Naudika
Work Code: OD/354/3374/117775/412232/00021608 (Const. of CC /Paver Road at Bada Sahi, Nandika)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Hinjilicut Bill Status: Final Bill
Proposal Date: - Date of Commencement: 16-12-2025
Date of Completion: 24-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: Pavor Block
Project Type: New Work Name of Executant: SARMISTA PANDA
Administrative Approval Details
Approval No.: OD/354/3374/117775/412232/00021608/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3374/117775/412232/00021608/TS
Fund Sanction No.: 1130
Fund Sanction Amount (in Rs.): 186532
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Semi-Skilled Skilled
Rs. 462 Rs. 512 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.5909872 Cubic Meter 0.516 1.3369493952 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 18.499648608 Cubic Meter 0.1236 2.2865565679488 - - - -
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 14.96109912 Square Meter - - 0.05 0.748054956 0.05 0.748054956
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 5.1819744 Cubic Meter 4.6 23.83708224 - - 0.68 3.523742592
Total Qty 27.460588203149 0.748054956 4.271797548
Rate Per Man Day 462 512 562
Total Amount 12686.791749855 383.004137472 2400.750221976
Total Labour Amount (in Rs.): 15470.546109303