Labour Statement

State: Odisha District: Kalahandi Block: Kokasara Gram Panchayat: Ladugaon
Work Code: OD/358/3417/118780/424066/00027471 (Repair & Maintenance Of Naikpada Govt. Primary School)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Kokasara Bill Status: Final Bill
Proposal Date: - Date of Commencement: 14-10-2025
Date of Completion: 17-10-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance of Primary School Building Project Sub-Category: Elementary School
Project Type: Repair and Maintenance Name of Executant: Ajay Kumar Senapati
Administrative Approval Details
Approval No.: OD/358/3417/118780/424066/00027471/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3417/118780/424066/00027471/TS
Fund Sanction No.: 29518
Fund Sanction Amount (in Rs.): 320000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled
Rs. 462 Rs. 562 Rs. 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Dismantling (AR1612) : Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 100.25 Square Meter 0.21505376344086 21.559139784946 - - - -
2 Dismantling (AR1623) : Dismantling and removing cement concrete - Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 10.025 Cubic Meter 1.6 16.04 - - - -
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 9.99 Cubic Meter 0.1236 1.234764 - - - -
4 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.025 Cubic Meter 3.9 39.0975 0.18 1.8045 - -
5 Flooring (AR0802i) : 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG crusher broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG crusher broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. 100.25 Square Meter 0.36 36.09 - - 0.13 13.0325
6 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 163.0623 Square Meter 0.053763440860215 8.7667903225806 - - 0.053763440860215 8.7667903225806
7 Painting (AR0918Ai) : Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. 163.075 Square Meter 0.043 7.012225 - - 0.036 5.8707
Total Qty 129.80041910753 1.8045 27.669990322581
Rate Per Man Day 462 562 612
Total Amount 59967.793627677 1014.129 16934.034077419
Total Labour Amount (in Rs.): 77915.956705097