Labour Statement

State: Odisha District: Balangir Block: Patnagarh Gram Panchayat: Maruan
Work Code: OD/345/3293/115950/420614/00028108 (Improvement Of Road And Bridges From Talpadar Bandh Road)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Patnagarh Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 13-11-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: Mettalling Road
Project Type: Repair and Maintenance Name of Executant: Krushmohan Sahu
Administrative Approval Details
Approval No.: OD/345/3293/115950/420614/00028108/AS
Technical Sanction Details
Technical Sanction No.: OD/345/3293/115950/420614/00028108/TS
Fund Sanction No.: 19781
Fund Sanction Amount (in Rs.): 450000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 30.66 Cubic Meter 4.6 141.036 - - 0.68 20.8488
2 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 67.2 Square Meter - - 0.05 3.36 0.05 3.36
3 Earth Work (AR0122Bi) : Earthwork in ordinary soil within 5 Km. mechanical carriages and spreading in filling area/road berm within initial lead and lift - Earthwork in ordinary soil within 5 Km. mechanical carriages and spreading in filling area/road berm within initial lead and lift including dressing and leveling the bed, etc. as per direction of Engineer-in-Charge. 10.08 Cubic Meter 0.32 3.2256 - - - -
4 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 4.2 Cubic Meter 0.516 2.1672 - - - -
5 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 27.3 Cubic Meter 0.1236 3.37428 - - - -
6 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 39.06 Cubic Meter 3.9 152.334 - - 0.18 7.0308
Total Qty 302.13708 31.2396 3.36
Rate Per Man Day 462 562 512
Total Amount 139587.33096 17556.6552 1720.32
Total Labour Amount (in Rs.): 158864.30616