Labour Statement

State: Odisha District: Bhadrak Block: Bhadrak Gram Panchayat: Kaupur
Work Code: OD/348/3323/116634/394746/00028961 (Construction Of C.C. Road At Harekrushna Jena House To Anu Jena House Under Kaupur GP)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhadrak Bill Status: Final Bill
Proposal Date: - Date of Commencement: 30-06-2025
Date of Completion: 27-10-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: New Work Name of Executant: PEO KAUPUR GP
Administrative Approval Details
Approval No.: OD/348/3323/116634/394746/00028961/AS
Technical Sanction Details
Technical Sanction No.: OD/348/3323/116634/394746/00028961/TS
Fund Sanction No.: 12804
Fund Sanction Amount (in Rs.): 143788
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102c) : Earth work in hard soil or gravelly soil in embankment, roads etc. within 50m initial lead and 1.5m initial lift and Compaction H.R.R - Earth work in hard soil or gravelly soil in embankment, roads etc. within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per specification approved by the Department alongwith proper compaction with H.R.R. (section measurement to be taken on the finished compacted section of the fill) as per direction of Engineer-in-Charge. 4.185 Cubic Meter 0.474154 1.98433449 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 11.8668 Cubic Meter 0.1236 1.46673648 - - - -
3 Concrete (AR0309a) : Cement Concrete (1:3:6) with 12mm size hard broken granite Hand Broken chips - Cement Concrete (1:3:6) with 12mm size hard granite (Hand Broken) chips including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 9.13632 Cubic Meter 4.6 42.027072 - - 0.68 6.2126976
4 Concrete (AR0307a) : Cement concrete (1:2:4)with 12mm size hard granite(Hand broken)chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(hand broken) chips including hoisting and laying in position compacting to proper thickness and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 6.62532 Cubic Meter 4.6 30.476472 - - 0.68 4.5052176
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 28.0303958704 Square Meter - - 0.05 1.40151979352 0.05 1.40151979352
Total Qty 75.95461497 12.11943499352 1.40151979352
Rate Per Man Day 462 562 512
Total Amount 35091.03211614 6811.1224663582 717.57813428224
Total Labour Amount (in Rs.): 42619.73271678