Labour Statement

State: Odisha District: Jagatsinghpur Block: Naugaon Gram Panchayat: Ghodansa
Work Code: OD/355/3391/118180/398144/00028976 (Repair of Road from Jayant Das house to Radha Mohan Temple Vill:-Mugei)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Naugaon Bill Status: Final Bill
Proposal Date: - Date of Commencement: 14-11-2025
Date of Completion: 21-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: Pavor Block
Project Type: Repair and Maintenance Name of Executant: KADAMBINI PRADHAN
Administrative Approval Details
Approval No.: OD/355/3391/118180/398144/00028976/AS
Technical Sanction Details
Technical Sanction No.: OD/355/3391/118180/398144/00028976/TS
Fund Sanction No.: 29781
Fund Sanction Amount (in Rs.): 200700
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0101aa) : Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift - Earthwork in ordinary soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge per 100 cum 4.536 Cubic Meter 0.384 1.741824 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 18.17949 Cubic Meter 0.1236 2.246984964 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 4.9521 Cubic Meter 3.9 19.31319 - - 0.18 0.891378
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 23.205 Square Meter - - 0.05 1.16025 0.05 1.16025
Total Qty 23.301998964 2.051628 1.16025
Rate Per Man Day 462 562 512
Total Amount 10765.523521368 1153.014936 594.048
Total Labour Amount (in Rs.): 12512.586457368