Labour Statement

State: Odisha District: Dhenkanal Block: Kankada Had Gram Panchayat: Biribolei
Work Code: OD/352/3354/117369/402212/00034936 (Improvement/Completion of Biribolei Kalyan Mandap)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Kankada Had Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 06-12-2025
Date of Completion: - Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance of Capital Assets Project Sub-Category: Kalyan Mandap
Project Type: Completion Name of Executant: NARAHARI BEHERA
Administrative Approval Details
Approval No.: OD/352/3354/117369/402212/00034936/AS
Technical Sanction Details
Technical Sanction No.: OD/352/3354/117369/402212/00034936/TS
Fund Sanction No.: 11826
Fund Sanction Amount (in Rs.): 500000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 612 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Masonry Brick Work (AR0603bi) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 40.001875 Cubic Meter 2.96 118.40555 - - 1.05 42.00196875 0.35 14.00065625
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 17.616375 Cubic Meter 3.9 68.7038625 - - 0.18 3.1709475 - -
3 R.C.C. Work (AR0404Ac) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 7.08203125 Cubic Meter 1.3333 9.442472265625 5.29605 37.506791601563 5.33875 37.809194335937 - -
4 R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 3.587424 Quintal 0.8 2.8699392 0.044 0.157846656 - - 0.3 1.0762272
5 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 29.288625 Cubic Meter 0.1236 3.62007405 - - - - - -
Total Qty 203.04189801563 82.982110585938 15.07688345 37.664638257563
Rate Per Man Day 462 562 612 512
Total Amount 93805.356883219 46635.946149297 9227.0526714 19284.294787872
Total Labour Amount (in Rs.): 168952.65049179