Labour Statement

State: Odisha District: Sambalpur Block: Dhankauda Gram Panchayat: Sason
Work Code: OD/371/3559/121307/381717/00037548 (Repair & Maintenance Of Govt. Upper Primary School At Ranikhinda)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Dhankauda Bill Status: Final Bill
Proposal Date: - Date of Commencement: 31-07-2025
Date of Completion: 16-08-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance of Primary School Building Project Sub-Category: Elementary School
Project Type: Repair and Maintenance Name of Executant: PRADEEP KUMAR BADHAI
Administrative Approval Details
Approval No.: OD/371/3559/121307/381717/00037548/AS
Technical Sanction Details
Technical Sanction No.: OD/371/3559/121307/381717/00037548/TS
Fund Sanction No.: 12439
Fund Sanction Amount (in Rs.): 500000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled Highly-Skilled
Rs. 462 Rs. 562 Rs. 512 Rs. 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0404A) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 0.6825 Cubic Meter 1.3333 0.90997725 0.0573 0.03910725 0.1 0.06825 - -
2 R.C.C. Work (AR0410d) : Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 10.92 Square Meter - - 0.6547619047619 7.15 0.6547619047619 7.15 - -
3 Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 10.92 Square Meter 0.24 2.6208 - - 0.16 1.7472 - -
4 Iron Work (AR1703) : Iron work wrought and put up in trusses and record racks - Iron work wrought and put up in trusses and record racks including all cost of labour, material, machinery and T & P required for the work etc. as per direction of Engineer-in-Charge. 19.6102 Quintal 4.9212598425197 96.50688976378 1.9685039370079 38.602755905512 4.4291338582677 86.856200787402 - -
5 Roofing (AR1135i) : G.C.I. Sheet (0.40mm thick) in walling - Supplying, fitting & fixing of G.C.I. Sheet (0.40mm thick) in walling including cost of nuts and bolts, fitting, labour and material etc. complete as per direction of Engineer-in-Charge. 333.243061 Square Meter 0.21505376344086 71.665174408602 - - - - 0.16129032258065 53.748880806452
6 Painting (AR0903i) : Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 86.48711882 Square Meter 0.11827956989247 10.229659215269 - - - - 0.13440860215054 11.624612744624
Total Qty 181.93250063765 95.821650787402 45.791863155512 65.373493551075
Rate Per Man Day 462 562 512 612
Total Amount 84052.815294595 53851.76774252 23445.433935622 40008.578053258
Total Labour Amount (in Rs.): 201358.59502599