Labour Statement

State: Odisha District: Ganjam Block: Chikiti Gram Panchayat: Katuru
Work Code: OD/354/3370/117697/412720/00038833 (Repair & Maintenance of Multipurpose cyclone shelter at Aladipur)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Chikiti Bill Status: 1st Bill
Proposal Date: 01-02-2025 Date of Commencement: 19-09-2025
Date of Completion: - Scheme Name: Infrastructure Development Fund
Scheme Component Name: Self/Personal Deposit Project Sub-Category: Cyclone Centre
Project Type: Repair and Maintenance Name of Executant: NARAYAN BEHERUK
Administrative Approval Details
Approval No.: OD/354/3370/117697/412720/00038833/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3370/117697/412720/00038833/TS
Fund Sanction No.: 595
Fund Sanction Amount (in Rs.): 580000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled
Rs. 462 Rs. 562 Rs. 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 167.8545 Square Meter 0.24 40.28508 0.16 26.85672 - -
2 Painting (AR0901a) : Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 1028.812 Square Meter 0.053763440860215 55.31247311828 - - 0.053763440860215 55.31247311828
3 Painting (AR0919) : Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 1028.812 Square Meter 0.043 44.238916 - - 0.036 37.037232
4 Painting (AR0901di) : Fourth Floor - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 354.465 Square Meter 0.065349798387097 23.164216285282 - - 0.065349798387097 23.164216285282
5 Painting (AR0918Ai) : Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. 354.465 Square Meter 0.043 15.241995 - - 0.036 12.76074
Total Qty 178.24268040356 26.85672 128.27466140356
Rate Per Man Day 462 562 612
Total Amount 82348.118346446 15093.47664 78504.09277898
Total Labour Amount (in Rs.): 175945.68776543