Labour Statement

State: Odisha District: Nayagarh Block: Dasapalla Gram Panchayat: Banigochha
Work Code: OD/367/3524/120607/405630/00043106 (Imp. of road from Garasa to Ragudu)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Dasapalla Bill Status: Final Bill
Proposal Date: - Date of Commencement: 30-07-2025
Date of Completion: 16-10-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: Ramesh Chandra Jani
Administrative Approval Details
Approval No.: OD/367/3524/120607/405630/00043106/AS
Technical Sanction Details
Technical Sanction No.: OD/367/3524/120607/405630/00043106/TS
Fund Sanction No.: 9122
Fund Sanction Amount (in Rs.): 280000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 198.440808 Square Meter 0.01 1.98440808 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 20.1414000384 Cubic Meter 0.1236 2.4894770447462 - - - -
3 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 20.1414000384 Cubic Meter 3.9 78.55146014976 - - 0.18 3.625452006912
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.1414000384 Cubic Meter 4.6 92.65044017664 - - 0.68 13.696152026112
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 33.073468 Square Meter - - 0.05 1.6536734 0.05 1.6536734
Total Qty 175.67578545115 18.975277433024 1.6536734
Rate Per Man Day 462 562 512
Total Amount 81162.21287843 10664.105917359 846.6807808
Total Labour Amount (in Rs.): 92672.999576589