Labour Statement

State: Odisha District: Puri Block: Pipili Gram Panchayat: Saraswatipur
Work Code: OD/369/3544/121056/408836/00046799 (Aseli Jena House To Budhanath House Cc Road)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Pipili Bill Status: Final Bill
Proposal Date: - Date of Commencement: 12-10-2025
Date of Completion: 14-10-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: HARAPRASAD JENA
Administrative Approval Details
Approval No.: OD/369/3544/121056/408836/00046799/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3544/121056/408836/00046799/TS
Fund Sanction No.: 2541
Fund Sanction Amount (in Rs.): 172711
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Skilled Un-Skilled Semi-Skilled
Rs. 562 Rs. 462 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 14.063855 Cubic Meter 3.9 54.8490345 - - 0.18 2.5314939
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.251084 Cubic Meter 4.6 51.7549864 - - 0.68 7.65073712
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 16.59996 Square Meter - - 0.05 0.829998 0.05 0.829998
Total Qty 11.01222902 106.6040209 0.829998
Rate Per Man Day 562 462 512
Total Amount 6188.87270924 49251.0576558 424.958976
Total Labour Amount (in Rs.): 55864.88934104