Labour Statement

State: Odisha District: Kendujhar Block: Ghatgaon Gram Panchayat: Mukundapurpatna
Work Code: OD/361/3447/119344/386680/00049480 (CONST OF CC ROD AT MUNDA SAHI , MUKUNDAPURPATNA GP)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Ghatgaon Bill Status: Final Bill
Proposal Date: - Date of Commencement: 30-10-2025
Date of Completion: 07-01-2026 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: SINGHU MURMU
Administrative Approval Details
Approval No.: OD/361/3447/119344/386680/00049480/AS
Technical Sanction Details
Technical Sanction No.: OD/361/3447/119344/386680/00049480/TS
Fund Sanction No.: 29133
Fund Sanction Amount (in Rs.): 230000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 14.48 Cubic Meter 0.1236 1.789728 - - - -
2 Concrete (AR0303a) : Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 17.63 Cubic Meter 3.9 68.757 - - 0.18 3.1734
3 Concrete (AR0307) : Fifth Floor - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.1975 Cubic Meter 9.2522430625 103.60199169234 - - 1.3677228875 15.315077032781
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 21.0365 Square Meter - - 0.05 1.051825 0.05 1.051825
5 Earth Work (AR0114) : Filling of foundation with escalated earth - Filling in foundation and plinth with excavated materials in ordinary soil including watering and ramming as directed by the Engineer-in-charge. 2.4 Cubic Meter 0.213332 0.5119968 - - - -
6 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 149.3 Square Meter 0.01 1.493 - - - -
7 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 3.6 Cubic Meter 0.516 1.8576 - - - -
Total Qty 178.01131649234 19.540302032781 1.051825
Rate Per Man Day 462 562 512
Total Amount 82241.228219463 10981.649742423 538.5344
Total Labour Amount (in Rs.): 93761.412361886