Labour Statement

State: Odisha District: Khordha Block: Jatni Gram Panchayat: Madanapur
Work Code: OD/362/3463/119659/407789/00052996 (Construction of Paver Block road from PWD Road to Sanatan Mahavidyalaya)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Jatni Bill Status: Final Bill
Proposal Date: 10-12-2024 Date of Commencement: 18-10-2025
Date of Completion: 24-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: Pavor Block
Project Type: New Work Name of Executant: Sarita Behera
Administrative Approval Details
Approval No.: OD/362/3463/119659/407789/00052996/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3463/119659/407789/00052996/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 143788
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 17.40367 Cubic Meter 0.516 8.98029372 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 24.155505 Cubic Meter 0.1236 2.985620418 - - - -
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 2.6 Cubic Meter 4.6 11.96 - - 0.68 1.768
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 23.92 Square Meter - - 0.05 1.196 0.05 1.196
Total Qty 23.925914138 2.964 1.196
Rate Per Man Day 462 562 512
Total Amount 11053.772331756 1665.768 612.352
Total Labour Amount (in Rs.): 13331.892331756